Canton, Massachusetts · Saved source text
BOS-08-23-2005
Saved text from 1 of 7 source pages. Transcription and OCR may contain errors; verify figures and wording against the original.
Source page 1
BOARD OF SELECTMEN MINUTES AUGUST 23, 2005 MEMORIAL HALL Present: Robert E. Burr, Jr., Chairman, Victor D. Del Vecchio, Vice-Chairman; Avril T. Elkort, Member; Gerald A. Salvatori, Jr., Member, William T. Friel, Town Administrator; and Judy Nelson, Administrative Secretary Location: Salah Room, Memorial Hall Meeting was called to Order at 7:25 p.m. Transfer of License: The Newstand to Canton Deli Beer and Wine, Inc. located at 719 Washington Street: Patrick Geraghty, Attorney for the Newstand; Camil Khabbaz; Motion was made to grant the Transfer of License: The Newstand to Canton Deli Beer and Wine, Inc. located at 719 Washington Street. Motion: Avril Elkort Second: Victor Del Vecchio VOTE; 4-0 Route 138 Update: VHB: Tim Mclntosh, Mike Trotta, Superintendent of Public Works Lisa Grega, Assistant Engineer: Tim Mclntosh explained that VHB has prepared a proposal to prepare plans, MassHighway Access permit and environmental permits to implement various improvements along Route 138. VHB will also provide the bidding assistance and construction services. Mr. Mclntosh explained that it would be provided in a five phase process (see attached VHB correspondence dated 07-22-05 attached hereto and therefore made a part hereof). Mr. Mclntosh noted with the ongoing NSTAR construction on Route 138, this might be a good time to take advantage of Mass Highway's involvement to see if funding could be used to resurface this area from Route 128 through to the Stoughton line. He noted that at this time Mass Highway and NSTAR involvement might benefit the Town's interest in repaving this area. Mrs. Elkort commented on the Route 138 intersection area and the status thereof. It was noted that the design of this was 90% done. It was noted that this had been pushed off from June to September at this point. Mr. Friel noted that construction would not start until March in this area. He noted that the funding is there as well as the commitment. Mrs. Elkort asked that if the area of Route 138 to the Stoughton Town Line were to be done at this time, would we be able to get a good overlay at this time. Mr. Mclntosh replied that grinding and resurfacing could be done in the Fall. Lisa Grega noted that historically this area has been kept up.