Canton, Massachusetts · Saved source text
PB-OCT-19-05
Saved text from 4 of 5 source pages. Transcription and OCR may contain errors; verify figures and wording against the original.
Source page 1
TOWN OF CANTON PLANNING BOARD MINUTES OF MEETING SALAH MEETING ROOM TOWN HALL OCTOBER 19, 2005 Members present: Peter Pineo, Chairman, Jeremy Comeau, Vice Chairman, Dean Miller, Clerk George Jenkins, Jillian Hayes, absent. Suzanne Feigen, Secretary Citizens Speak No one wished to speak. ROGER NICHOLAS, TOWN PLANNER UPDATE The Town has submitted again to the State, a Housing Action Plan, and is confident that it will be approved. He went on to explain that there are two ways to meet the 10%. This will provide 61 units a year. Roger met today with a landscape expert, Christine Scypinski, LA, of The Waterfield Design, that will work on the Downtown Streetscape. They are doing the landscaping portion of the project. She expects to have a concept in hand by next month, and then have some kind of coordination meeting. Town Engineer, Dan Donahue is going to start setting up meetings when appropriate, on getting suggestions on working out the process and implementation. Plymouth Rubber District Article: Article 10- will be withdrawn by the Board of Selectmen at the Special Town Meeting. The Chair recommended that a design composition be part of the strategy of the P.B. article. The discussion was that the P.B. won't overlay any parcel at this time for Plymouth Rubber article until the Spring. 1. SITE PLAN -25 SHAWMUT ROAD-DISCUSSION-TOM SALAH-SUZANNE MATTHEWS, ESQ. There has not been a review done yet, but will share with the Board, a fact sheet about this project done by their Engineer, Glossa Engineering, Inc. It is a 51,000 s.f commercial, three store building. One minor issue Would be with the Conservation Commission, that is with the parking lot within the 35' buffer zone, and vegetated wetlands. She brought with her tonight the Landscape Plan and the Lighting plan. John Glossa of Glossa Enginering's letter was received tonight also. It is a vacant lot that has been cleared. It was announced by Mr. Miller that Mr. Houston has received the engineering review proposal. They go before the Zoning Board on November 3rd. Mr. Miller asked how and why another building was needed there instead of using vacant land elsewhere. Mr. Salah has a client for this building. Mr. Pineo noticed that over the years, plows have kicked over the concrete exposing the reinforcing rods. He asked if there was some way Mr. Salah could address that. Shawmut Street is owned by Canton. The inverts were questioned by Mr. Jenkins.
Source page 2
This is continued to November 2, 2005. 2. SITE PLAN-5 FULTON STREET-PROPOSED GARAGE-CHET LAWSON/PAUL SCHNEIDERS, ESQ. DISCUSSION Attorney Paul Schneiders spoke about the proposed garage for a construction business for his client Chet Lawson. This project has new plans from a new Engineering firm, Toomey-Munson Assoc. This will be before the Zoning Board on December 3rd. It is a 10,500 s.f building to accommodate 12 employees, putting in 27 actual parking spaces, 15 potential parking, and it is in the Groundwater Protection District. Paul Brodmerkle, the Engineer spoke briefly, on the improvements. The site is beside the "Lamb" business. They do new construction, remodeling, and John's company does excavation, blasting, and drilling. Equipment will be stored inside the building, except the blasting equipment. Preferably, the blasting equipment will be taken off the site. A stormceptor will be used. There is no evidence that a 21E has been done. It should be submitted. The turning radius for a tractor trailer was discussed in detail. The 18" pipe in the utility easement- the question was asked, how it handled the rain. Mr. Brodmerkle commented that the drainage is going to be all collected throughout the sides of the rear yard in the catch basins and out into the stormceptor and into a detention recharge device. The overflow will be routed into a four-bay area where it will collect to a certain elevation that will allow it to discharge into a existing drain manhole at the rear and then out into Jackson Street. Some recharge will occur. They will comply will the Town's standards for sediment and erosion control. Atty. Schneiders addressed the matter of Mr. Houston's review. His client would like to re-engage Mr. Houston to finish this site review process. Mr. Houston stated that items that are critical and need to be responded to are the report of the licensed site professional, and the planting plan, an electrical plan, comments from the Police and Fire Departments, details of the new mechanical equipment, particular the acoustical properties, and letters from the Fire Protection Depts. A architectural rendering may be important to the residents. Mr. Miller had a concern on the underground detention and if it was deep enough. Mr. Brodmerkle will take a second look at that. Also, no vehicles will be repaired there. Mr. Pineo spoke about the border and buffer area. Mr. Houston feels that Toomey Munson favorably addressed the issues. The Board would like to have a site visit. They have scheduled Saturday, 9:00 A.M. on site, October 22, 2005. Mr. Capassano, a neighbor, was here and spoke about the runoff onto his property from this property. He wanted a nice building there, not a junk yard. He asked if this was going to make his property a swimming pool. Mr. Schneiders spoke to him and will speak to him on his concerns. 2. PRELIMINARY SUBDIVISION DISCUSSION: 363 CHAPMAN STREET- PAUL FELDMAN/ PAUL SCHNEIDERS, ESQ. (due Nov. 19, 2005)
Source page 3
This is a proposed three lot subdivision on a three acre lot on Chapman Street. Mr. Schneiders represents the client, Paul Feldman of Quincy. All lots show the required frontage. The existing house there will be raized. It is Res. A, 30,000 s.f. lots. There would be a lot of open space. There will be a pump station. Abutter: Larry Chelmow of 399 Chapman St. is concerned about any possible drainage issues. That would be addressed at the Definitive stage. Concerned about the traffic in getting out of there. Bill Day, Chapman St.- would like a wall between his property and stockade fence after the garage. Maybe upgrading the sidewalk. Mr. Pineo explained how the Board is very sensitive to providing as much buffer, and taking a look at the site, predevelopment, and identifying which trees should stay. A plan should be made on which trees remain and which will be removed. The P.B. is drafting a homeowners document for the detention structure area. The lot closest the railroad might require more site grading. Tom will give written on the Preliminary Subdivision. DISCUSSION: ARTICLE 12- REVITALIZATION C Upon a motion made by Mr. Comeau and seconded by Mr. Miller, the Board voted 4-0 to open the Public Hearing for discussion, on Article 12. This new section of the CCEOD came about due to the rezoning of the Plymouth Rubber area through the series of workshops. The P.B., after two workshops, came up with an Article in harmony with the Master Plan. Subsequent to that, the B.O.S. have withdrawn their article on Plymouth Rubber. The sale at auction is Friday. Mr. Pineo went on to state that they are not willing to withdraw their article completely. They will move forward with the creation of Revitalization C but not particularly overlaying any parcel of property at this time. It signals an intent, and revisiting it at the ATM and minor changing before the ATM. He recommends removing language that identifies a particular area. Mr. Jenkins feels we should table the whole article; everyone knows that this article was made for that property. He will not use Mrs. Hayes absence to cast a vote tonight. Mr. Comeau waited to hear more discussion on the subject matter. Mr. Jenkins continued to say that we could drive up the sale of the property. Mr. Pineo did not agree, nor did Mr. Miller. Upon a motion made by Mr. Miller and seconded by Mr. Comeau to close the Public Hearing, the Board voted 4-0 in favor. Upon a motion made by Mr. Miller and seconded by Comeau, the Board voted 4-0 to defer the motion to Monday night April 24, 2005 at 6:30 P.M. prior to STM when the full Board would be available to vote. Post the 6:30 P.M. Cafeteria meeting prior to STM.
Source page 4
Overlook Road- any complaint calls will be take by Mr. Jenkins. Winchester Rd. and Stratford Rd. Update: Mr. Houston reported that he met with Mr. Flanagan on site and have the areas marked out. Curbing will arrive next week. He reviewed the driveways again. Three of the four driveways will be cut at the ends. He reports that they are moving along at a good pace. Upon a motion made by Mr. Miller and seconded by Mr. Comeau, the Board voted 4-0 in favor of adjourning at 9:30 P.M. Voted 4-0 in favoar. George Jenkins, Clerk