PB April 4 2012

Planning · Source meeting date: 2012-04-04 · Record 39740

Open original municipal record ↗Open interactive reader

Saved text from 2 of 4 source pages. Transcription and OCR may contain errors; verify figures and wording against the original.

Source page 1

TOWN OF CANTON
PLANNING BOARD MEETING
WEDNESDAY, APRIL 4, 2012
SALAH MEETING ROOM
7:00 P.M.
TOWN HALL
MINUTES
Present: Kristin Mirliani, Chairwoman; Jeremy Comeau, Vice Chairman,
Christopher Connolly
Also present: Tom Houston, Professional Services Corporation
Karen Lawlor, Planning Board Administrative Assistant
Meeting came to order at 7:00 p.m.
Chairwoman Kristin Mirliani called to order the Planning Board meeting of April
4, 2012.
1 St Item on the Agenda — 41 Plymouth Street ANR
Mr. Comeau - Made a Motion to Approve and Sign the ANR for 41 Plymouth Street
dated March 7, 2012, seconded by Mr. Connolly. All those in favor, Motion passes 3 -0.
2nd Item on the Agenda — Knob Hill — Cost to Complete — Paul Brodmerkle,
Engineer.
The Board welcomed Mr. Brodmerkle back to the Planning Board.
Paul Brodmerkle, P.E., Managing Partner of Site Design Professions, LLC — He
stated for the record he is representing the developer of Knob Hill Estates, Endriunas
Construction. He has worked with Tom Houston and the Department of Public Works on
the completion of all items on the DPW punch list. This is a proposal and not cast in
stone. They are sensitive to the needs of the DPW and without certainty there is not
enough money to cover the costs of the outstanding work to be completed within the
subdivision. They propose to swap out the sewer covers and only replace the damaged
ones in order to save money since some of them are 15 years old. They presented a list of
their proposals to the Board. Those proposals were:

Source page 2

Planning Board
Minutes of April 4, 2012
Letter dated April 4, 2012 on Endriunas Bros. letterhead.
1. Do all items on DPW list.
Replace DMH covers only that are broken, remainder stay.
Remove and reset frames and covers that have riser rings.
2. Do all items on Sewer Department list except replace frames and covers.
Replace only broken frames or covers, remainder stay.
Remove and reset frames and covers that have riser rings.
3. Eliminate ground water flow onto pavement Skyline Circle Sta. 0 +25.
4. Crack seal all roadways.
5. Replace hydrant end of Fern Brook Circle.
6. Remove sidewalk and replace loam and seed end of Fern Brook Road.
7. Remove and replace alligated pavement 3 1 /2 " asphalt not to exceed 5,000 sq. ft.
8. Clean, adjust and replace all necessary all water gate boxes.
They will also be asking for a waiver to remove the sidewalks which will then not require
ADA compliance and maintenance. This is an initial proposal and doesn't need to be
done this way. This is their first pass at this, and not sure if it can be done this way. The
Board should look it the proposal and think it over.
Ms. Mirliani asked what would the time frame "for construction and completion" be if
we agreed to this proposal.
Paul Brodmerkle replied that it would be 60 days.
Mr. Houston stated that he obviously hasn't had a chance to review this. And how the
town gets the biggest bang for the buck which is about $115,000.00. Typically a private
contractor gets more done than the town process. He plans to sit down with Jim
Donovan, the Town Engineer and compare the proposal with what the town feels is best.
He will look at the value of the proposal, crosscheck it, and then do a report to the Board
for the next meeting which will be April 18, 2012.
2