Canton, Massachusetts · Saved source text
1-21-04 Mins
Saved text from 2 of 5 source pages. Transcription and OCR may contain errors; verify figures and wording against the original.
Source page 1
Canton Conservation Commission Pequitside Farm 79 Pleasant Street Canton, MA. 02021 Public Hearing Meeting Date: January 21, 2004 — Public Meeting FINAL Attendance: Ed Lynch — Chairman, John Friel - Vice Chairman, Dave McLelland, Bob Burr, Jan Hagan — Clerk, Bob Doe Jr.- Treasurer Conservation Agent: Robert Murphy Recording Secretary: Heather Cahill Chairman Ed Lynch called meeting to order @ 7:00 P.M. at Pequitsid Canton, Massachusetts.e Farm, 7:10 P.M. Petition of Notice of Intent From Blue Hills Country Club 23 Pecunit St. Canton, MA DEP File # 124-900 For Mitigation and Restoration of disturbed resource areas (installation of well, concrete Pad and chemical storage building, and the irrigation pipes) due to site improvements. for Kathryn Nadeau and Arthur Borden. Kathy is on route. public Hearing Blue Hill C.C. (notice of intent) Attorney Paul Schneider's asked to go to next matter waiting CONTINUATIONS: DEP # 124 895 Jodi Matt Village Gate Road Hearing closed two weeks ago January 7, 2004. Attorney Comeau sent letter representing abutters Murphy received letter Attorney Nilan representing Applicant. Plan of reference of driveway not roadway. Motion: Standard of condition Of" Appendix A" Stake out of Construction — Land Disturbance Permit 002 disturbance be executed. Motion made by Bob Burr 2 by Jan Hagan Unanimous - all in favor Opposed none PUBLIC HEARING CONTINUED Attorney Paul Schneider representing Blue Hill Country Club. st Notice of Intent issued date 12/31/03 - target dates are 3/3/2004, 4/5 /2004, 7/14/2004 & 9/15/2004 fast as responsibly can be done, but not done poorly with guidance of this commission. Damage done wasn't intentional. Blue Hill Country Club will help in any way for this to go smoothly.
Source page 2
KATHRYN NADEAU of Water Works ARTHUR BORDEN of Arthur F.Borden Associates Drawings Presented outlining trouble area that will be worked on. Site being worked on in 5 areas. Notices of intent, 5 notices. 1st Notice of Intent will consist of Map color coded, for identification purposes, 4 areas - Installation Well, Irrigation Pipe, Chemical Storage, and Wood Pile. 2nd Notice of Intent areas include: areas 5-8 along maintenance building, includes wetland 3rd Notice of Intent: areas 9 & 10 behind 6th and 7th green includes stream channel. 4th Notice of Intent: areas enforcement order issued upon which is the pond. 5th Notice of Intent: exits of stream channel and sedimentation problems WOOD PILE Impact area is a large pile of logs, stumps and branches. Access of machinery impacts 100ft in Buffer zone — Tub grinder will chip logs, Hydraulic arm which will take the logs to adjacent tractor trailer which will exit Dedham St. area. Area to be brought back to restoration to original with grade all, and greenery will be replaced during planting season/Spring time. Added 3 species ink berries raspberry and blueberry to add diversity and rood and shelter for wildlife. John Friel questions (Wood Pile) how long will chipping take? Answer hard to say, depends on weather, frozen wood doesn't chip well Ed lynch asks do these logs belong to the town? Kathryn Nadeau answer to both questions unsure, Mr. Borden will check into and let Canton Conservation Commission know. Jan Hagan asked Bob Doe Jr. — question about elevations are they listed ? Bob Murphy asked — How much river front on property? How much river front is currently is developed? how much river front is being restored?, how much river front in new development? Numbers are needed or they can be run out of percentage for the right to use, needs to pay attention. Excavation will be taken away — Bob Murphy request that this be in the plans and needs to be in writing or it doesn't get done. One plan in the end for everything to be done by. IRRIGATION PIPE Maintenance area. Irrigation pipe crosses Pecunit Brook area placed along shoulder of existing roadway. Continues thru PVC irrigation pipe lies across and with in Pecunit Brook. Ripraf was placed in the bed which dissipates the 'vet- and probably supports the pipe. Rifraf need to be removed. Two things for culvert are mitigation and restoration. First thing is to take the pipe out of the and above the culvert and restore area. 2