Canton Conservation Commission Pequiteside Farm Tavern Room 79 Pleasant Street Canton, Ma. 02021 PUBLIC HEARING December 1, 2004 Attendance: James Sims- Vice-Chairman, Robert Doe- Treasurer, Jan Hagan- Clerk, Scott Staiti, Dave McLelland, and Ed Lynch Also in Attendance: Conservation Agent: Robert Murphy Recording Secretary: Scott Staiti & Jan Hagan 7:10 P.M. Public Hearing opened by James Sims Minutes of November 17, 2004 accepted with Bob Doe abstaining PUBLIC HEARINGS 7:12 p.m. Amended Notice of Intent for Richard Donovan, 5 Emerson Road. DEP# 124-728 Paul Brodmerkle of Toomey & Munson representing Mr. Donovan explained to the commission a discrepancy between the topographic plans presented in initial Notice of Intent and topology found on site. Mr. Brodmerkle would also like to relocate the proposed barrier wall up gradient of the 30' No Build Zone and note that the deck has been elevated at the 30' No Build Zone. He noted that the retaining walls along the driveway will be 3 1/2' to 4' tall. Motion Made by Bob Doe to Close the Hearing for DEP# 124-728 Seconded by Scott Staiti Vote - Unanimous with Ed Lynch abstaining Motion Made by Bob Doe to approve the Amended Notice of Intent Seconded by Dave McLelland Vote- Unanimous with Ed Lynch abstaining Notice of Intent for Douglas Solomon, 31 Pleasant Garden Road, DEP# 124-932 Mr. Solomon presented his plans for adding to the east side of his existing house an addition. Motion Made by Bob Doe to Close the Hearing for DEP# 124-932 Seconded by Dave McLelland Vote - Unanimous 1
Source page 2
Motion Made by Bob Doe to issue a Standard Order of Conditions for DEP# 124-932. Seconded by Scott Staiti Vote — Unanimous A presentation of the trails and projected completion cost and time for Pequitside Farm discussed. John Friel will work on estimates for the materials needed to winterize the Barn and a schedule will be determined at a meeting on 12/2/04 with Mr. Fallon, the DPW and the Building Sub Committee. CONTINUATIONS Blue Hill Country Club, 23 Pecunit Street Paul Gorsky and Mr Moll presented a current draft of an Intergraded Long-Range Maintenance Plan for the Commissions' review prior to the formal filing. Mr. Moll made mention of a pre construction meeting this week and projected that the Pond reconstruction will start on 12/06/04. BHCC intends to file the Maintenance Plan and the NOI for the 5th (resource) area after the first of the year. Bob Murphy attended the pre construction meeting and explained that the contractor, Podgurski Construction, intended to start the dewatering process on Monday the 6th and move equipment into work area over fiberglass pads. The excavating is projected to start on 12/10/04 with completion in two to three weeks. Mr. Murphy also commented on the Maintenance Plan and explained that the plan being submitted is for five years. MWRA, Northern Fowl Meadow, Certificate of Completion for DEP# 124-408 Lauren Sloat and Steve Ivas requesting a Certificate of Completion for work done in Fowl Meadow. Motion Made by Ed Lynch to issue a Certificate of Completion for DEP# 124-408 Seconded by Dave McLelland Vote — Unanimous Theodore M. Vozzella — 2 Feldman Way Technical errors by DEP Motion Made by Ed Lynch to continue hearing for Mr. Vozzella until 12/15/04 Seconded by Dave McLelland Vote — Unanimous 2