Skip to content
Search Canton

Canton, Massachusetts · Saved source text

9-25-13 Mins

Conservation · Source meeting date: 2013-09-25 · Record 47423

Open original municipal record ↗Open interactive reader

Saved text from 1 of 7 source pages. Transcription and OCR may contain errors; verify figures and wording against the original.

Source page 1

1 
hc/9-25-mins 
 
Meeting Minutes 
September 25, 2013 
Attendance: Debra Sundin – Chairman, Thomas Liddy – Vice Chairman, 
James Fitzpatrick – Clerk, Steve Landry – Treasurer, Ed Jastrem, Jerald Carmichael 
Absent: Robert MacDonald 
 
Conservation Agent: Cynthia O’Connell Recording Secretary: Heather Cahill 
 
Hearing called to order at 7:02 P.M. 
 
Minutes of August 14, August 28, and September 11, 2013 – 
 To be reviewed and approved at October 9, 2013 hearing 
 
NO PUBLIC HEARINGS 
CONTINUATIONS 
Matt Young/Cumberland Farms 777 Dedham Street 124-1105 
(continued to October 9, 2013) 
Petition for Notice of intent from matt young/Cumberland farms, Inc. 100 Crossing Rd., Framingham, 
Ma. 01702 for property located at 777 Dedham St., Canton, Ma. 02021… For proposed removal of 
existing gasoline and diesel underground storage tanks including associated piping, dispenser canopy 
within in an area of land subject to flooding and an Area of Critical Environmental Concern (Fowl 
Meadow and Ponkapog Bog ACEC) 
Canton Holdings, LLC 0 Revere St. SW-075/LDP-0136 
Presented by Ken Staffier, VHB – Lisa Eggelston, Eggelston LLC. – ConCom peer 
reviewer for Storm water drainage and land disturbance. Mr. Staffier explained 
that final drainage calculations, design plans were submitted to Lisa Eggelston for 
review and need further input from ConCom. 
DRAFT – sketch submitted explaining infiltration run-off, use of infiltration, plan 
shows (3) collection inlets, (3) catch basins, and area drains along road (entrance 
from Revere Street) to Paul Revere Village. Proposing to install shallow drainage to 
hold and infiltrate, requires minimum of 2’ of clearance. Mr. Staffier further 
explained that proposed redevelopment of existing parking lot has to be designed