Canton, Massachusetts · Saved source text
ZB03-24-2016
Saved text from 1 of 6 source pages. Transcription and OCR may contain errors; verify figures and wording against the original.
Source page 1
(781) 575-6589 Minutes of the meeting of March 24, 2016 PRESENT: Gregory L. Pando, Chairman Gary E. Vinciguerra John R. McCourt Also Present: James A. Fitzpatrick, Jr. Adrienne Borges, Recording Secretary Chairman Pando opened the meeting at 7:00 pm and reads the agenda. Kelly McGowan —11 Walnut Knoll — 5-16-ENCB-SP-V (GP, JRM, JF) Chairman Pando reads the petition requesting to construct a second floor addition with front covered entry and overhang in rear on a pre-existing non -conforming corner lot in a Single Residence `B' district. Chairman Pando states it is a corner lot so the Applicant needs to be 30' from Walnut Knoll and Spring Terrace. Chairman Pando states a Variance would be required since it is pre-existing non -conforming and with the addition, the Applicant would be 20' from Walnut Knoll and 19' from Spring Terrace. Chairman Pando believes it is appropriate and keeping with the neighborhood. Mr. McCourt and Mr. Fitzpatrick agree with Chairman Pando. Mr. McCourt makes a motion to grant a Variance for Kelly McGowan of 11 Walnut Knoll to be within 20' from Walnut Knoll and 19' from Spring Terrace per plan by GEV Design Inc. of Canton, MA dated January 25, 2016 and plot plan by Charette Land Surveying of Mansfield, MA dated February 1, 2016. Mr. Fitzpatrick seconds. Vote 3-0 approve Diamantis & Anastasia Zervos / Donahue Real Estate / Dorchester Awnine Co. —12 Revere Street—12-16-SP-V (GP, Gv, JRM) Chairman Pando reads the petition requesting to install a new awning with lettering. Mr. Tom Cebula from Dorchester Awning Co. and Ms. Alissa Cusack from Donahue Real Estate appear before the Board. Mr. Cebula states the awning will be red in color with white lettering. Chairman Pando asks if the Applicant has been to the Design Review Board. Mr. Cebula states they have not since he had a family emergency when their last meeting was. Chairman Pando states recommendation from Design Review should be done before Zoning Board of Appeals issues a Special Permit. Mr. Cebula states Donahue Real Estate is already operating out of the building and would like to have the sign done as soon as possible so customers know where to go. Mr. Vinciguerra asks if the Applicant has reviewed the standards set by the Design Review Board. Mr. Cebula states he has. Mr. Vinciguerra points to page 13 of standards saying 15% of face of awning should only be covered and Mr. Vinciguerra states it looks like more than 15%. Chairman Pando states a waiver can be issued from the guidelines.