Canton, Massachusetts · Saved source text
5-17-17 MINUTES
Saved text from 1 of 3 source pages. Transcription and OCR may contain errors; verify figures and wording against the original.
Source page 1
TOWN OF CANTON PLANNING BOARD MEE"I ffN G'r WEDNESDAY, MAY 17, 2017 SA AH MEETING ROOM Bon WASHINGTON STREET 7m00 P.1V\1. TOWN elf ,L MINUTES Present: Thomas Scully, Acting Chairman Michael Mitcheroney, Clerk Patricia McDermott Also Present- Thomas Houston, Professional Services Corporation Laura Smead, Town Planner Daren Lawlor, Administrative Assistant Acting Chairman Thomas Scully called to order the Planning Board meeting of May 17, 2017 at 7. 00 p.m. A motion was made by Mr. Mitcheroney and seconded by Ms. McDermott to open the public meeting. Motion approved -3-0. First Item on the Agenda — Reorganization of the Board. This will be tabled until the next meeting when we have a full Board. Next Item on the Agenda — 28 ELM STREET (Laura Gillespie) - Informal Hearing regarding Columns at the end of a driveway on a Scenic Way Laura Gillespie wanted to thank the Board for seeing her for this informal hearing. She lives at 28 Elm Street and is a longtime Canton Resident. There are two (2) columns at the end of her driveway which are twelve (12) feet apart. This creates a very narrow opening to the driveway and makes it very challenging to pull in and out of the driveway. The would like to move one (1) column in order to make the driveway opening wider to approximately eighteen (18) feet wide. The tree warden has been out to look at the trees and the stonewall and has no problem with this. The stonewall is not being touched, but will fix and reuse any stones that become dislodged or moved. They had someone come out to look at the columns and they can be easy removed and relocated. The Board suggested talking to DPW if the Applicant had not already done so, and go forward with this project with the Board's blessing. Next Item on the Agenda - 85 DAN ROAD (Organogenesis Warehouse) — Site Plan Review for a loading dock addition to an existing office building located in the LI District (Pare Corporation, 8 Blackstone Valley Place, Lincoln, RI 02865)