04-10-2019 MINUTES

Planning · Source meeting date: 2019-04-10 · Record 64252

Open original municipal record ↗Open interactive reader

Saved text from 2 of 9 source pages. Transcription and OCR may contain errors; verify figures and wording against the original.

Source page 1

TOVM OF CANTON 
PLA1\1N11\TG BOLD MEETING 
1ING 
WEDN1-ESDAY9APRA L i1®9 ,(Gv9 
TOV\71\\T HALL 
Present- Thomas C. Scully, Chairman 
Robert Panico, Vice Chairman 
Patricia McDermott, Clerk 
David McCarthy, Member 
Kathy McCormack, Member 
Also Present: Thomas Houston, Professional Services 
Corporation 
Laura Snead, Town Planner 
Daren ]Lardor, (Administrative Assistant 
Chairman Scully called to order the Planning Board meeting of April 
710, 2019 at /000 P.M. 
A motion was made by Mr. Scully and seconded by Ms. McDermott to open the 
public meeting. Motion Approved 5-0. 
Mr. Scully introduced the new Planning Board member, Ms. Kathy McCormack. 
First item was taken out of order from on the on the Agenda (i) 290 
PINE STREET (Sunrise Erectors) Informal Discussion (Paul 
Schneiders, Attorney and Paul Brodmerkle, Engineer) 
Paul Schneiders and Paul Brodmerlde explained that the Building Commissioner 
has found some violations and requested that they be remedied. Violations 
include an access road around the property was less than 24 feet, which is not 
adequate for the Fire Department due to outdoor storage. The other concern was 
the parking was disparate from what was originally allowed, since the outdoor 
area was being used for storage not parking. Finally, there was no special permit 
sought for outdoor storage. They are going before the Zoning Board soon to 
approve the site plan modification to bring it into conformance and to get a 
special permit for reduced parking. 
The total required spaces for the building square footage includes 283 spaces, 
which is much more than the use has ever needed. They are providing 149. The 
Fire Department has no problems with the fire access proposed. The bulk of the 
outdoor storage will largely move to a new facility in Mansfield, which will be 
closing towards the end of April. 
Ms. McDermott: There were staff parking on the street before, and the new plan 
will alleviate staff parking on the street.

Source page 2

Tom Scully suggested knowing the number of full-time employees before going 
before the Zoning Board. 
Paul Brodmerkle is confirming that there is no peer review and no 
recommendation from Planning Board needed. Planning Board confirmed this. 
Next item on the Agenda ( 2 ) wo ROYALL STREET (Trillium 
Brewing) — Site Plan Review (Brian S. Grossman, Bowditch & Dewey, LLP) 
Proposed plan will relocate the Trillium Operations from Shawmut Road to loo 
Royall Street. 
Mr. Grossman: Special permits will be needed for the mix of uses: light 
manufacturing for brewing/storage/warehousing, a retail space, and a Soo -seat 
restaurant and tap room. An outdoor patio is proposed (200 seats) and an 
outdoor event space. The total number of people "seats" at any time will be 500 - 
seats. If the patio is open, only 300 indoor seats of the tap room will be used. 
The proposed project is mostly a reuse and repurposing of the existing building 
and existing parking, without minimal exterior changes to the exterior of the 
building and existing parking. The parking lot will be restriped to meet current 
ADA codes for width and handicapped spaces. They have provided a land bank 
parking plan to show that 726 spaces be provided on site if needed. This is not 
expected to be needed for the proposed uses. Just over 400 spaces are provided 
in the proposed plan. 
Mr. Scully asked about the staging and phasing of construction. 
Trillium: The first phase will be to open the tap room and front of house 
operations. There will be a smaller production on site, with transitioning the full 
brewing operations to Royall Street over the next five years. 
Mr. Scully: Will there be any additional grain storage outside? 
Trillium: Not in the short-term, but likely in the long-term. 
Mr. Scully: How will construction be handled at the same time as restaurant 
operations? 
Trillium: There is enough buffering with the size and layout of the building and 
parking to be able to have separation. 
Mr. Scully: Asks about numbers of expected customers. 
Trillium: Varies a lot, but number of transactions are around 200 to 300 people 
a day today. This is a larger scale, so expecting maybe 500 people on a low day — 
with maybe 3,000 people on a really high event day. 
Ms. McDermott asked about pedestrian and cyclist accommodations.