Canton, Massachusetts · Saved source text
12-18-19 MINUTES
Saved text from 1 of 3 source pages. Transcription and OCR may contain errors; verify figures and wording against the original.
Source page 1
TOW -14, OF CC A1\\J 0 IP A\\JNII\\JG BOARD M EIETII�T WED14IESDAY9 DECEMBER ER ji89 z q SJU AH MEETING DOOM Bo7_ WASHINGTON STRI ,IET TOWN HALL i:00 hoM- Present: Thomas C. Sully, Chairman Patricia McDermott, Clerk David McCarthy, Member Kathy Gibbs McCormack, Member Jso Present: Thomas Houston, professional Services Corporation Laura Smead, Town planner IZaren Lawlor, Administrative Assistant Chairman Scully called to order the Planning Board meeting of December 18, 2o19 at 7:00 p.m. A motion was made by Ms. McDermott and seconded by Mr. McCarthy to open the public meeting. Motion Approved 4-0. A motion was made by Ms. McDermott, and seconded by Mr. McCarthy to open Item #i. Motion Approved 4-0. First Item on the Agenda (1) 72 JACKSON ROAD - Site Plan Review for the construction of a 2,88o square foot garage (Applicant/Owner: 72 Jackson Street Realty Trust c/o Michael McHugo) (Chris Cabral, PE, Project Engineer, Crossman Engineering, North Attleboro, MA) Attorney Bob Burr introduced himself as representing the Applicant, Mike McHugo. He explained that Chris Cabral, Crossman Engineering, has worked on the plans for several weeks. The proposed garage is located southwest of the Canton Junction train station. They had obtained a 2003 Survey Plan, and had the property resurveyed. They had test pits done and new drainage, all in accordance with state rules. Further, they moved the building slightly back to make this conforming; having complied with all commercial and industrial standards; and decreasing the runoff to the neighbor's property. Mr. Houston explained that all technical issues have been resolved; the drainage system is in accordance with the Stormwater Handbook; and the drainage design is up to current standards. In conclusion, there are no outstanding issues.