Skip to content
Search Canton

Canton, Massachusetts · Saved source text

Zoning-Min-20210312100324

Zoning · Date not identified · Record 69716

Open original municipal record ↗Open interactive reader

Saved text from 1 of 4 source pages. Transcription and OCR may contain errors; verify figures and wording against the original.

Source page 1

CANTON, MA 02021 
TEL: (781) 575-6589 FAX: (781) 575-6574 
Minutes of the meeting of September 10, 2020 
PRESENT: Gregory L. Pando, Chairman 
Charles J. Armando 
John R. McCourt 
Mike Khoury, Alternate 
Also Present: Amanda Smith, Recording Secretary 
Not Present: Paul B. Carroll, Alternate 
Meeting Held virtually in Zoom 
Chairman Pando opens the meeting at 6:00 pm and reads the agenda. 
ECA Solar — 28 Draper Lane 
Chairman Pando opens the meeting and states this is an informal hearing. Engineer Paul 
Brodmerkle states he is representing ECA Solar on the meeting. They would like to make 
a minor modification to the site plan that the Zoning Board had previously approved. One 
of the carports is located on top of a major gas line servicing the facility. They don't want 
to disturb it by putting the footings in for the carport. It will be moved to the north by 
about130 feet. He describes which carport needs to be moved. Chairman Pando asks if 
there will be the same number of modules. Mr. Brodmerkle states it has 150 fewer 
modules. Chairman Pando asks if Mr. McCourt has any questions. Mr. McCourt states he 
thinks it is a very reasonable request. Chairman Pando states he would like to vote on 
whether it is a minor modification. 
Mr. McCourt makes a motion on behalf of ECA Solar of 28 Draper Lane to consider this a 
Minor Modification to the Site Plan. Mr. Khoury seconds. Vote 3-0 approve. 
Chairman Pando states they can now speak about the merits of this Minor Modification. 
Mr. McCourt states he thinks it is a reasonable request. Mr. Khoury frilly supports the 
request. Chairman Pando states he would entertain a motion to accept the Modification of 
the Site Layout Plan by Site Design Professionals, LLC. 
Mr. McCourt makes a motion on behalf of ECA Solar of 28 Draper Lane to accept the Site 
Layout plan showing the relocation of carport -mounted solar modules based on the plan by 
Site Design Professions, LLC, 1 Merchant Street, Suite 110, Sharon, MA, with the last 
revision date of August 19, 2020. Mr. Khoury seconds. Vote 3-0 approve.