TOWN OF CANTON 
PLANNING BOARD MEETING 
WEDNESDAY, JANUARY 8, 2020 
SALAH MEETING ROOM 
8oi WASHINGTON STREET 
TOWN HALL 
7'.00 P.M. 
Present- Thomas C. Sully, Chairman 
RobevY Panico, Nice Chairman 
Patricia McDermott, Clerk 
David McCarthy, Member 
Kathy Gibbs McCormack, rack, Member 
Also Present.- Thomas Houston, Pkofessional Services Corporation 
Laura Smead, Town Planner 
Karen Lawvlorr°, Administrative Assistant 
Acting Chairman Panico called to order the Planning Board meeting of 
December 4, 20i9 at 7.00 p.m. 
A motion was made by Ms. McDermott and seconded by Mr. McCarthy to open the public 
meeting. Motion Approved 4-0. 
A motion was made by Ms. McDermott and seconded by Mr. McCarthy to open Item #1. 
Motion Approved 5-0. 
First Item on the Agenda (1) COPPERWORKS LOTS 4 & 5 (Modification 
Request) (Paul Schneider, Attorney; Bernie Plante, Melton Associates; Lloyd Geisinger, 
Thorndike Development; David Eastridge, Thorndike Development; Ken Staffier, VHB 
Attorney Schneiders introduced himself and Lloyd Geisinger of Thorndike Development. He 
explained they have done a lot of work and Mr. Houston had thirty-six (36) outstanding 
issues and twenty-four (24) have been resolved. They have a letter from the Fire Chief and 
he is requesting that the Board take a vote tonight, with conditions, and they are going 
before the Zoning Board next week. 
Mr. Houston went through some of the outstanding comments, including:

Source page 2

Planning Board Minutes 
January 8, 2020 
Page 2 of 8 
2. The area of disturbance will exceed 20,000 square feet and a full Permit will be required 
by the Conservation Commission. Information should provide: 
a. Delineation of total land to be distributed; 
b. Delineation of the loo -year flood plain; 
c. Location of erosion control practices; 
d. Sequence of construction activities; including anticipated dates of soil stabilization 
and completion; and 
e. Temporary and permanent soil erosion and sediment control measures, including 
seeding and other vegetative controls. 
3. Comparing predevelopment to post development impervious cover, there is an overall 
reduction in impervious cover in the 3o -foot buffer. Comparing the existing conditions 
measurably decreases from 32% to 52% which is significantly improved. 
4. Pipes located within the proposed right-of-way will be revised to be Reinforced Concrete 
Pipe per the Town of Canton Subdivision Standards. The applicant requests a waiver from 
Section 8.H.6.a to allow the use of high-density polyethylene pipe within areas privately 
owned. The 12 -inch diameter pipe from Infiltration i to OCS-2 is slightly overcapacity; 
correct as practicable. HDPE pipe is proposed within private sites (and has been granted for 
other projects.) 
io. Recommend that the Applicant complete soils tests during the permit process. Lots 4A 
and 5A are relatively intensively developed and therefore opportunities to resize the 
infiltration structures in order to accommodate changes in soil or groundwater data are 
limited. To be more consistent, four (4) or more test pits should be should be completed 
before construction. 
13. The Rules and Regulations require infiltration of one (i) inch of roof runoff in a separate 
infiltration structure. Limiting infiltration to 0.6 inches is provided by the current permit 
and should be regarded as sufficient for the modified permit. Due to space limitations, it 
may not be practicable to provide a separate roof water infiltration facility. Reconfiguring 
the collection pipes routing only the catch basin flows through the isolator row and routing 
roof water directly into the Storm Tech units without passing could be provided in lieu of a 
separate roof water infiltration facility. To not overtax the system, a separate facility is 
needed, and a dual pipe would work. The roof water would go into a separate pipe and 
meets the intent. 
17. The Stormwater Management Plan should be updated and resubmitted to include the 
submission requirements in the Rules & Regulations. 
2