Skip to content
Search Canton

Canton, Massachusetts · Saved source text

04-07-2021 Minutes

Planning · Source meeting date: 2021-04-07 · Record 70562

Open original municipal record ↗Open interactive reader

Saved text from 2 of 7 source pages. Transcription and OCR may contain errors; verify figures and wording against the original.

Source page 1

TOWN OF CANTOfT 
, a .;#,..�.1 D_ i M, Z`r 
A :1 ' M)i . APRIL 7, 2021 
Virtual "Zoom" , 
r0 P.M. 
Present: Robert E. Panto, Chairman 
David McCarthy, Vice Chairman 
Patricia McDermott, Clerk 
Kathy Gibbs McCormack, Member 
Joseph Amrhein, Member 
Also Present: Thomas Houston, Professional Services Corporation 
Laura Smead, To-,vn Planner 
Chairman Panico called to order the Planning Board "Zoom" meeting of April 
9, 2021 at 7:oo p.m. 
Chairman Panico welcomed and introduced the new Planning Board member, Joe Amrhein 
to the Board. 
A motion was made by Chairman Panico seconded by Ms. McDermott to open the public 
meeting of April 7, 2021. A roll call was taken of each member, Mr. McCarthy, Ms. 
McDermott, Ms. McCormack, Mr. Amrhein and Chairman Panico. Motion Approved 5-o. 
A motion was made by Chairman Panico and seconded by Ms. McDermott to open Item #1, 
10 Albert Street. Roll Call Taken, all in favor, Motion Approved 5-0 
Ida W 10 Albert Street (White Tail Estates) — Requesting a 
eliminating the paver strips (Stephanie Lopilato, Owner) 
The Applicant was not in attendance so this hearing will be continued. 
Next Item on the Agenda (2) So & go Shawmut Road — Emergent BioSolutions 
(EBS -Canton) — Site Plan Review; (Michael Bush, AIA, Principal BushWang, LLC; 
Richard Zolla, EBS; Attorney Paul Schneiders; and Nicholas Skoly, VHB, Engineer) 
Attorney Schneiders introduced himself and explained that at the last meeting they went 
through and discussed all the issues. A memo addressing the issues was sent and Mr. 
Houston has stated that almost everything has substantially been resolved.

Source page 2

Planning Board Agenda 
April 7, 2021 
Page 2 of i 
Mr. Houston explained that he has a laundry list with about a dozen outstanding issues 
remaining, which include: 
3.f. Further information regarding the existing drainage system is requested. Pipe °P6" is 
believed to be a roof drain connection from go Shawmut Road to the municipal drain 
system. Further investigation is required to confirm this understanding This is general 
information and will be resolved during construction; 
6. Due to increased truck traffic PSC requested that a water quality unit (WQU) be added at 
the rear loading dock, which required additional specifications. The site plans now show the 
model number; invert elevations; and performance data has been supplied. This has been 
resolved; 
ro. The outlet control structures (OCS) for System i showed an invert elevation on the plan 
that differed by o.l feet from the invert elevation used in the HydroCAD calcs. This has been 
corrected and the inconsistencies resolved; 
ii. Requested design information be added for the infiltration systems. The elevation of 
seasonal high groundwater data has been added, and is now on the drawings; 
12. Requested that design detail information be added for the infiltration systems. As a 
result of design changes, Infiltration System 3 was added to provide the required water 
quality volume. Test pit excavation have now been deferred until the start of construction; 
18. Requested that test pits be excavated at the infiltration basins. Test pits were excavated 
but were not shown on the plan. The test pit locations for Systems 21 and 2 have been added 
and are now shown on the site plans; 
32. Requested the requirement for a mounding analysis because the separation between the 
bottom elevation of the subsurface structures and ESHGW is less than 4 feet. There was a 
lack of information, and recent borings were taken and mounding calculations are 
satisfactory; 
38. The owner must conduct additional investigation of the building to remain. The Illicit 
Discharge compliance Statement is to be submitted when construction is underway and 
before the time of the Certificate of Occupancy; 
44. Requested an analysis of the peak period parking demand. The submitted analysis 
quantifies peak parking demand and has been resolved; 
48. All three site drives shown now have a minimum width of 30 feet and this has been 
solved; 