Skip to content
Search Canton

Canton, Massachusetts · Saved source text

May 01, 2023, Finance Committee Meeting - Virtual Meeting. Minutes

Finance Committee · Record date 2023-05-01 · Record 35e4326ac44a21521d

Open original municipal record ↗Open interactive reader

Saved text from 5 source pages. Transcription and OCR may contain errors; verify figures and wording against the original. Retrieved 2026-10-15.

Source page 1

Canton Finance Committee                  Minutes Voted on: 7/12/23
                                             801 Washington Street                   Vote: 5-0-1
                                               Canton, MA 02021




                                                 Meeting Minutes
                                                   May 1, 2023
Finance Committee Members Present: Karen Foley, Emilio Mauro, Maureen Menconi, Reuki Schutt and Cindy
Thomas.

Finance Committee Members Absent: Dave Clough, Dan Cole, and Tim McKenna.

Guests Present:
Victor Del Vecchio, President, Revere & Son Heritage Trust Corporation
Alan Hines, Revere & Son Heritage Trust Corporation
Ellen Jones, Finance Committee Recording Secretary
Randy Scollins, Finance Director/Treasurer/Collector

Call Meeting to Order: Ms. Thomas called the virtual meeting to order at 7:15 p.m. and stated that the Finance
Committee will discuss significant updates regarding the Library HVAC/Roof Project and will hear a presentation from
the members of the Paul Revere and Son Heritage Trust Corporation. Ms. Thomas turned the meeting over to Mr.
Scollins to discuss motions for reconsideration.

The Finance Committee was presented with two motions for reconsideration. Both of these revised motions were in
conjunction with the Library HVAC/Roof project. The Finance Committee had previously been provided with
estimates for the Library Project. Since that time new information has been received. A contract had been funded
with architects and engineers. RGB had won the bid to provide the Town with more detailed costs and estimates so
that a more accurate number could be provided at Annual Town Meeting (ATM) in order to request the funding at
ATM to do the work

Article 2 Motion 2 – Reconsideration – Non-Residents Listing – Mr. Scollins stated that Mr. McCarthy, Chair of
the Building Renovations Committee, provided three additional names to add to the non-residents listing.

A motion made by Mr. Mauro that the Finance Committee reconsider their previous vote for Article 2 Motion 2
was seconded by Ms. Schutt.

Roll Call Vote:
Ms. Schutt        Aye     Ms. Foley          Aye     Ms. Thomas          Aye
Ms. Menconi       Aye     Mr. Mauro          Aye

Roll Call Vote: 5-0-0.

Mr. Scollins stated that a more efficient way to handle a revised motion at ATM was to treat it as a revised motion
instead of an amended motion so that the revised motion would be the only motion to go forward which eliminates the
need to address the original motion and then address the revised motion. Mr. Scollins further explained that if the
Finance Committee recommended the Revised Motion then it would appear printed on the voting cards that are
distributed to voters checking in for ATM. This would help eliminate any confusion for the voters. The Town
Moderator would ask the voters to refer to the Revised Motion on their voting cards.

A motion made by Mr. Mauro that the Finance Committee approve the revised motion for Article 2 Motion 2 to
add three additional names to the non-residents listing (Andrew Barkley of Robinson, Green and Beretta
(RGB), Dave DeQuattro of RGB and Bruce MacRitchie of MacRitchie Engineering) was seconded by Ms.
Schutt.

Roll Call Vote:
Ms. Schutt        Aye     Ms. Foley          Aye     Ms. Thomas          Aye
Ms. Menconi       Aye     Mr. Mauro          Aye

Roll Call Vote: 5-0-0.




FINCOM 20230501 minutes WRS CT MM.docx          Page 1 of 5                                          7/11/23

Source page 2

Article 15 Motion 13 - Reconsideration – Library Roof & HVAC Replacements

Mr. Scollins shared on the Zoom meeting screen a breakdown of the Library Roof & HVAC Capital Project Cost
Estimate as follows:

     RGB Architects Project Cost Estimate                             $4,106,919
     Estimate of Owner’s Project Manager (OPM) required                  165,000 (required for projects > $1.5 million)
     Total Project Cost Estimate                                      $4,271,919

     Existing 2022 ATM Funding                                          $320,000
     Originally Proposed 2023 ATM Funding                              1,300,000
     Sub-Total Funding                                                $1,620,000

     Additional Funding Required                                      $2,651,919 (debt funding required to complete the project)

Mr. Scollins provided additional information on the Zoom screen (see meeting documents): Debt Service Schedule,
Included Debt Service Schedule and RGB’s Probable Cost Estimates for the Roof/HVAC Project (4 pages). Mr.
Scollins reviewed the costs associated with the various categories indicated on RGB’s Probably Cost Estimate
worksheets. An Estimated Contingency cost of $473,999 (20%), a Cost Escalation Fee of $101,656 (3%) and a
Change Order Contingency of $349,020 (10%) are included in the project total of $4,106,919.

Mr. Scollins referred to the Debt Service Schedule exhibit. The reason that Mr. Scollins is proposing $2.66 million in
new debt for the project is because the Town does not have the reserve capacity to put forward. The 1.2 million had
been put forward for the project in reserves. If the $2.66 million were added it would cause the Town to end FY23
below the reserves target of 15%. The better option is to borrow for the $2.66 million. He explained in detail the
$9,110,034 debt service that is paid out of the General Fund budget.

If the New FY24 proposed General Fund borrowing (for 10 projects) and the proposed Library Project borrowing are
approved and included in the Total Included Debt (General Fund & Inside the Levy) the result would be $3.6 million or
2.7% as a percent of the General Fund budget. The Town’s Included Debt Service is currently at 2.6% of the
General Fund Budget. Mr. Scollins stated that the 2.7% would be in a comfortable range for Included Debt Service
for Canton is between 2.0% and 4.0%.

From a borrowing perspective Mr. Scollins stated that it is not particularly healthy to give up the 2.5% to 3% share for
debt service because the Town would be “crowding out” its debt service capacity with other spending. The Town
would not want to do this because the Town would continually need to borrow for a variety of projects. The Town
would not want to “save a buck” on its debt service only to compromise the ability to get capital projects done.

The purpose of Mr. Scollins showing that while the Library Project would add another $239,4000 of debt service
starting in FY25, the $239,400 would decrease with every upcoming fiscal year as well as other debt service being
paid off in future fiscal years keeping Canton’s debt well within the debt as a percentage of the General Fund.

A motion made by Mr. Mauro that the Finance Committee reconsider their previous vote for Article 15 Motion
13 was seconded by Ms. Schutt.

Roll Call Vote:
Ms. Schutt          Aye       Ms. Foley            Aye       Ms. Thomas          Aye
Ms. Menconi         Aye       Mr. Mauro            Aye

Roll Call Vote: 5-0-0. The motion to reopen Article 15 Motion 13 passed.

A revised motion was presented to the Finance Committee as follows:

MOVED: That Three Million Nine Hundred Thirty-One Thousand Two Hundred Ten Dollars ($3,931,210) be appropriated to be
spent by the Finance Director (in his capacity as Chief Procurement Officer) with the approval of the Building Renovations Committee,
the Select Board and the Library Board of Trustees for the purpose of improvements/replacements of the Library Roof and HVAC and
to meet said appropriation the Town Treasurer with the approval of the Select Board be authorized to borrow pursuant to any
applicable statute or any other enabling authority as may be, the sum of Two Million Six Hundred Sixty Thousand Dollars
($2,660,000) and that One Million One Hundred Seventy Three Thousand Seventy Seven Dollars ($1,173,077) be transferred from
Free Cash (Undesignated Fund Balance) in the Treasury of the Town and that Ninety Eight Thousand One Hundred Thirty Three
Dollars ($98,133) also be transferred from surplus funds in the Bolivar Pool Capital Project Fund #43002-58900-BPOOL into the
Library Roof / HVAC capital project account. It is the intent that the bonds and notes issued pursuant to this authority be general
obligations of the Town.




FINCOM 20230501 minutes WRS CT MM.docx                 Page 2 of 5                                                 7/11/23

Source page 3

A motion made by Mr. Mauro that the Finance Committee recommend to Town Meeting the Revised Motion
for Article 15 Motion 13 in the amount of $3,931,210 with borrowing of $2,660,000 to be repaid from the
general fund, $1,173,077 be transferred from Free Cash and $98,133 be transferred from surplus funds in the
Bolivar Pool Capital Project Fund was seconded by Ms. Foley.

Roll Call Vote:
Ms. Schutt        Aye      Ms. Foley           Aye      Ms. Thomas         Aye
Ms. Menconi       Aye      Mr. Mauro           Aye

Roll Call Vote: 5-0-0. The revised motion was approved. Mr. Scollins stated that this Revised Motion will be printed
on the Voter cards so there will be no need to mention the original motion or an amended motion. Mr. Scollins will
work with the Town Clerk and will provide her with the information for the voting card.

Discussion – Revere & Son Heritage Trust Corporation (PRSHTC) (the Trust) – Alan Hines and
Victor Del Vecchio

The purpose of the RSHTC discussion was to allow Mr. Hines and Mr. Del Vecchio present information (see meeting
documents) that will be also presented at Town Meeting and to also allow members of the Finance Committee the
opportunity to ask questions about the Trust. Ms. Thomas stated that this presentation would help to better
understand the rather unique and sometimes complex relationship between the Trust and the Town.

The following are some of the areas that Mr. Del Vecchio discussed:

       The Trust has nine voluntary board members with 6 members appointed by the Select Board and 3
        members appointed by the other Trust members (no salaries are paid to the Trust members). Mr. Scollins
        will be leaving the Trust Board due to his commitments with the Town.
       Matthew MacDonald, the Clerk of the Trust, represents the Simoni Foundation. Mr. MacDonald also
        provides legal services to the Trust, which the Trust has not had to pay for so far.
       The Trust has two part-time support staff: Allison Neff and Kristen Phelps. While these 2 staff positions are
        compensated by the Trust, a majority of their time is volunteer.
        While the Trust may be unique, the organization is essentially a part of the Town.
       The Trust is considered by the IRS as a 501c3 tax-exempt organization with its own Tax ID.
       The Trust is allowed to do things under its special legislation that the Town cannot do such as solicit
        revenue, gifts and donations. The Trust is subject to the Anti-Aid amendment under the Massachusetts
        Constitution, however, the Trust was written and designed to allow the Trust to have some independence.
       Because the Trust is considered a part of the Town, the Trust can borrow, seek appropriations from Town
        meeting, raise funds privately, file for grants,
       The Paul Revere Heritage Commission (created by the Select Board and staffed with constituents) was
        established in 2015 to purchase the Paul Revere Heritage Site. The Commission was to oversee the
        development of the space and the use of the buildings. The Commission has now been disbanded (by
        votes in 2022 of the Commission and the Select Board) and is replaced by the Revere & Son Heritage Trust
        Corporation. The Trust was established by a vote of Annual Town Meeting to petition the legislature to form
        the Trust.
       The Museums are not self-sustaining – a revenue source is needed in order for the two museums to survive.
        A restaurant was proposed to be a recurring revenue source. A 10-year agreement was entered into with
        Northern Spy. The rental money was designed by the legislature and the agreement to mitigate expenses
        for the museum creation and future operation.
       To date the museums have been renovated. The Trust is now tasked with “populating” the museums with
        activities and exhibits that will be regionally attractive to a population of the community and beyond the
        community.
       Mr. Del Vecchio displayed on the Zoom screen a revenue graph depicting the various areas the Trust
        obtains public and private funding – The largest portion is from grants from state (Mass Cultural Council),
        federal (ARPA) and private organizations ($884,400 43%), Community Preservation Fund ($316,000 16%)
        as well as from donations, Revolving Fund 152 controlled by the Trust (private donations), Revolving Fund
        142 controlled by the Select Board (rental revenue), Select Board mitigation funding, Town of Canton capital
        funding, Town of Canton operating funding, and non-monetary donations. Total funding through March
        2023 is $2,034,446.

    Mr. Hines stated that he wanted to make it clear that it is not the Trust’s intention to ask for charitable donations
    to pay for expenses of the Trust or to maintain property that is in his opinion really the Town’s responsibility.

       Expenses through March 2023 total $324,436. The largest expenditure is for the Tax Pledge Mitigation
        Account for PRHS & Museum for $237,363 42%.




FINCOM 20230501 minutes WRS CT MM.docx            Page 3 of 5                                             7/11/23

Source page 4

    Mr. Del Vecchio summarized Trust-Sponsored Exhibits to Date, Community Engagement event and
         Upcoming events.
        The Trust has entered into a contract for the final Design of the Revere Museum of Discovery & Innovation.
         The contract was awarded to EXP Studios. It is expected that the design phase for the museum will take
         one year.

Mr. Del Vecchio’s presentation concluded at approximately 8:23 p.m.


Mr. Hines stated that he had met with Finance Committee member Dave Clough who was under the impression that
all of the development at the site would be funded through taxpayer dollars. Mr. Hines explained to Mr. Clough that
there were “pockets” of money available at the federal level, state level, historical society, various foundations for
which the Trust may access funds. There are also companies that want to sponsor exhibits at the museum. He
further stated that it is important to have community support when they seek donations from other sources.

Mr. Mauro thanked Mr. Del Vecchio and Mr. Hines for their presentation and the Trust as whole for everything they
have done in establishing this site for a place in the community that had not existed before.. Ms. Thomas also
thanked the Trust for the amount of work and commitment towards this site and project.

Public Information Meeting – May 3, 2023 – to discussion Town Meeting Articles

The informational virtual meeting will be held via Zoom. Presenters will be allowed to speak at the meeting. Mr.
Scollins requested that if there are any Finance Committee members that would like to participate that they should
send him an email. Mr. Hines (the Moderator elect) will facilitate the informational meeting.

Next Meeting Date: There is no Finance Committee meeting scheduled before their next meeting which will take
place on May 8, 2023 from 6-7:00 p.m. just prior to the Annual Town Meeting.

Approval of Minutes - A motion made by Ms. Schutt to approve the March 29, 2023 and the April 3, 2023
minutes as written was seconded by Ms. Foley.

Roll Call Vote:
Ms. Schutt        Aye      Ms. Foley          Aye      Ms. Thomas        Aye
Ms. Menconi       Aye      Mr. Mauro          Aye

Roll Call Vote: 5-0-0. The March 29, 2023 and April 3, 2023 minutes were approved.

A motion made by Mr. Mauro to adjourn the meeting at 8:37 p.m. was seconded by Ms. Schutt.

Roll Call Vote:
Ms. Schutt        Aye      Ms. Foley          Aye      Ms. Thomas        Aye
Ms. Menconi       Aye      Mr. Mauro          Aye

Roll Call Vote: 5-0-0. The meeting adjourned.


Minutes reviewed by: Maureen Menconi
Respectfully submitted,




Cindy Thomas
Chair, Canton Finance Committee
Sub-Committee to Review Compensation of Elected Officials




FINCOM 20230501 minutes WRS CT MM.docx           Page 4 of 5                                           7/11/23

Source page 5

Finance Committee
                                              Meeting Documents
                                                  May 1, 2023



Please note: Some meeting documents may be found on the Town’s website under the Posted Minutes
section (Laser Fiche).

Agenda for May 1, 2023.

Library Roof & HVAC Capital Project Cost Estimate, Randy Scollins, dated 4/25/23 (1 page).

Debt Service Schedule – Town of Canton, Randy Scollins, dated 4/25/23 (1 page).

Included Debt Service Schedule – Town of Canton, Randy Scollins, dated 4/25/23 (1 page).

RGB – Canton Public Library – Roof HVAC Renovation Project, Probably Cost Estimate dated 4/18/23 (3 pages).

Revere & Son Heritage Trust Corporation Presentation, Alan Hines and Victor Del Vecchio (14 pages).




FINCOM 20230501 minutes WRS CT MM.docx         Page 5 of 5                                        7/11/23