FY26 Municipal Capital Requests - January 2025 - Part 3 of 3 pdf file

Budgets & Finance · Record year 2025 · Record 9f72514b510f958342

Open original municipal record ↗Open interactive reader

Saved text from 158 source pages. Transcription and OCR may contain errors; verify figures and wording against the original. Retrieved 2026-10-15.

Source page 1

Name

£4} Copy of PW Work Sheets,XLSX

ae DPW - Sub Tab 01 - $27,000 - Phase! Dam Inspection and Report - Priority 1 of 7,pdF

spl DPW - Sub Tab 02 - $18,490 - Survey GPS Receiver Netowrk Data Collector - Priority 2 of 7, pdf

‘BY DPW - Sub Tab 03 - $34,000 - Public Works Share - GIS - Asset Mgmt Sofware Upgrade Water ~ Pricrity 3 of Yypalf
be DPW - Sub Tab 04 - $330,100 - Truck No 35 Street Sweeper - Priority 4 of 7.pdf

‘ DPW - Sub Tab 05 - $257,100 - Truck No 16 Large Construction Dump Truck - Priority 5 of 7,pdf

‘BY DPW - Sub Tab 06 - $424,000 - Truck No 19 Dump Sander - Priority 6 of 7.pdf

‘By DPW - Sub Tab 07 - $13,400 - Truck No 52 WANCO Sign Board - Priority 7 of 7.pdf

By DPW - Sub Tab 08 - $35,000 - Water Ent Share - GIS - Asst Mgmt Software Upgrade Water - Piio tity’l wf Sycg
‘y DPW - Sub Tab 09 - $125,000 - Satellite Well at Moran Water Treatment Facility PWTP - Priority 2 of Spdf

‘BY DPW - SUB Tab 10 - $80,000 - CAT 305 CR Mini Excavator - Priority 3 of S.pdf

hy DPW - SUB Tab 11 - $15,400 - MAXX-D Equipment Tilt Trailer - Priority 4 of 5.pdf

ap DPW - SUB Tab 12 - $34,000 - Sewer Ent Share - GIS - Assest Mgmt Software Upgrade Water - Priority’ of naif
BL] DPW - SUB Tab 13 - $59,000 - CUES CCTV Sewer Main Inspection Camera - Priroity2 of 3, pdf

‘BL DPW - Sub Tab 14 - $2,300,000 - Year 2 5-Year Sewer Capital Improvement Plan CIP - Priority 3 of 3ypcf

‘By DPW - Sub Tab 15- $4,500,000 - Water System Improvement Construction Contract 4 - Priority 5 of Sspalt

‘Gy DPW 6 Year Plan - Copy of PW Work Sheets.pdf

Source page 2

Name

£4} Copy of PW Work Sheets,XLSX

ae DPW - Sub Tab 01 - $27,000 - Phase! Dam Inspection and Report - Priority 1 of 7,pdF

spl DPW - Sub Tab 02 - $18,490 - Survey GPS Receiver Netowrk Data Collector - Priority 2 of 7, pdf

‘BY DPW - Sub Tab 03 - $34,000 - Public Works Share - GIS - Asset Mgmt Sofware Upgrade Water ~ Pricrity 3 of Yypalf
be DPW - Sub Tab 04 - $330,100 - Truck No 35 Street Sweeper - Priority 4 of 7.pdf

‘ DPW - Sub Tab 05 - $257,100 - Truck No 16 Large Construction Dump Truck - Priority 5 of 7,pdf

‘BY DPW - Sub Tab 06 - $424,000 - Truck No 19 Dump Sander - Priority 6 of 7.pdf

‘By DPW - Sub Tab 07 - $13,400 - Truck No 52 WANCO Sign Board - Priority 7 of 7.pdf

By DPW - Sub Tab 08 - $35,000 - Water Ent Share - GIS - Asst Mgmt Software Upgrade Water - Piio tity’l wf Sycg
‘y DPW - Sub Tab 09 - $125,000 - Satellite Well at Moran Water Treatment Facility PWTP - Priority 2 of Spdf

‘BY DPW - SUB Tab 10 - $80,000 - CAT 305 CR Mini Excavator - Priority 3 of S.pdf

hy DPW - SUB Tab 11 - $15,400 - MAXX-D Equipment Tilt Trailer - Priority 4 of 5.pdf

ap DPW - SUB Tab 12 - $34,000 - Sewer Ent Share - GIS - Assest Mgmt Software Upgrade Water - Priority’ of naif
BL] DPW - SUB Tab 13 - $59,000 - CUES CCTV Sewer Main Inspection Camera - Priroity2 of 3, pdf

‘BL DPW - Sub Tab 14 - $2,300,000 - Year 2 5-Year Sewer Capital Improvement Plan CIP - Priority 3 of 3ypcf

‘By DPW - Sub Tab 15- $4,500,000 - Water System Improvement Construction Contract 4 - Priority 5 of Sspalt

‘Gy DPW 6 Year Plan - Copy of PW Work Sheets.pdf

Source page 3

FORM A
                              TOWN OF CANTON
                              CAPITAL PLANNING COMMITTEE
                              SIX-YEAR PLAN                                                      FY2025                                                                            5-Year                  6-Year
                                Beginning with Fiscal Year 2025 and ending with 2030             VOTED            FY2026    FY2027     FY2028    FY2029     FY2030                 TOTAL          FY2031   TOTAL
                                (000's omitted)
                              DEPARTMENT PUBLIC WORKS

CASH CAPITAL
VEHICLES
Automobile                    2016 Ford Explorer                        #1                                                       55                                                        55                      55
Automobile                    2024 Chevrolet Tahoe                      #2                            75                                                                                    0                       0
Pickup                        2008 Ford F550                            #3             M48022                                    85                                                        85                      85
Pickup                        2009 Ford F 250                           #4             M45159                                              80                                              80                      80
Pickup 4x4                    2023 Ford F 350                           #5                                                                                                                  0                       0
Automobile                    2017 Ford Explorer                        # E1                                                               55
Automobile                    2023 Ford Hyb Explorer                    # E2                                                                                                              0                      0
Dump-Sander                   2006 Intl 7300                            # 11                                                   260                                                      260                    260
Truck                         2006 Intl. 400SER 4300 Truck              # 12                                                                                                              0                      0
Utility 4 x4                  2022 Ford F 350                           # 13                                                                                                              0                      0
Dump-Sander                   2000 Sterling                             # 15                        245                                                                                   0                      0
Dump-Sander                   2000 Sterling                             # 16                                         257                                                                257                    257
Dump - Sander                 2004 Sterling L8500                       # 21                                                              265                                           265                    265
Truck                         2016 Ford F350                            # 25                                                                                                              0          85         85
Bucket Truck Platform         2021 Freightliner M 2                     # 37                                                                                                              0                      0
Dump                          2006 Intl 4300                            # 30                                                                        270                                 270                    270
                                                                                                                                                                                          0                      0

                              TOTAL - VEHICLES                                                      320              257       400        400       270          0                    1,272          85      1,357
TECHNOLOGY
Mobile Radio Upgrade                                                                                                                                                                          0                     0
Survey Equipment                                                                                                      19
Town GPS Base Engineering                                                                                                        45                                                        45                      45
Hydraulic Design Software                                                                                                                  35                                              35                      35
Document Plotter/Scanner                                                                                                                                                                    0                       0

                              TOTAL - TECHNOLOGY                                                       0              19         45        35          0         0                         80          0           80

EQUIPMENT                                                                                                                                                                                 0                      0
Sweeper                    2017 Elgin Pelican                           # 33                                                   350                                                      350            0       350
Street Sweeper             2010 Elgin Pelican                           # 35                                                                                                              0                      0
Sidewalk Tractor           2015 MT Trackless                            # 47                                                                                                              0                      0
Sidewalk Tractor           1008 Camoplast                               # 48                                                                                                              0                      0
Sidewalk Tractor/Plow      1992 Bombardier                              # 49                                                                                                              0                      0
Bolivar Garage Security System                                                                                                                                                            0                      0
Bolivar Garage Fuel Cell                                                                                                                                                                  0                      0
Bolivar St. Mobile Garage Truck Lifts (1988 Vintage)                                                  50                                                                                  0                      0
Snowplows                                                                                                                                                                                 0                      0
Lifting Forks                                                                                                                                                                             0                      0
Utility Trailer            1999 Big Tex                                 # T2                                                               18                                            18                     18
Welder                     1988 Lincoln                                 # 40                                                                                                              0                      0
Flat Bed Trailer           1999 Cross                                   # T1                                                                         18                                  18                     18
Hot Box Trailer            2013 Step Utility Trailer                    # 59                                                                                  125                       125                    125
Lawn Mower - Cemetery                                                                                                                                                                     0                      0
                                                                                                                                                                                          0                      0
                                                                                                                                                                                          0                      0
                                                                                                                                                                                          0                      0
Cement Mixer                  1995 Stone                                # 50                                                               20                                            20                     20
Roller                        1989 Dyna Pac                             # 54                                                     46                                                      46                     46
Chipper - Replacement         Replace - 1991 Eager Beaver               # 55                          48                                                                                  0                      0
Chipper                       2012 Terex Chipper                        # 51                                                                                                              0                      0
                              1999 John Deere - gator                   # 58                                                                                                              0                      0
Chipper                       2013 Terex Chipper                        # 58                                                                                                              0                      0
Trailer                       2006 Cronk Utility Flat Trailer           # 59                                                                                                              0                      0
Stump Grinder                 2001 Rayco                                # 51                                                                                                              0                      0
Roller                        1989 Stone Roller                         # 75                                                                                                              0                      0
Roller                        2002 MZ Two Ton                           # 75                                                     35                                                      35                     35
UTE                           1999 John Deere Gator                     # 76
UTE                           2007 John Deere Gator                     # 77
Skidloader                    2017 Kabota                               # 62                                                                                                                0                       0
Skidloader                    2008 Terex PT30                           # 68                                                                                                                0                       0
Message Board                 New Wnaco WTMMB                                                                                                                                               0                       0
Ride-on Leafe Blower                                                                                                                                                                        0                       0
Flail Boom Mower Attachment                                                                                                                                                                 0                       0
Hook Lift Mounted Street Vacuum Attachment                                                                                                                                                  0                       0
Traffic Control Signs - Flashing Cross Walk System - 7 locations                                                                                                                            0                       0
11 Foot Snow Plows                                                                                                                                                                          0                       0
Wet Deicing systems for Sanders                                                                                                                                                             0                       0
Neponset Street Aqueduct Fence                                                                                                                                                              0                       0
Brush Chipper                                                                                                                                                                               0                       0
Enclosed Trailer                                                                                                                                                                            0                       0
Message Board               2010 Wanco Message Board Unit      # 53                                                   14                                                                   14                      14
Cemetery Security Cameras                                                                                                                                                                   0                       0
Trailer                     2013 Cross Utility Trailer         # T6                                                                                                                         0                       0
Grass Mowers                                                                                                                                                                                0                       0
Message Board               2013 Wanco WV73                    # 52                                                                                                                         0                       0
           O:\Ellen\CPC - Capital Planning Committee\CPC FY2026\CPC FY26 - Requests from Departments\FY26 - TAB & - Public Works\Copy of PW Work Sheets.XLSX6-YEAR PLAN FORM A Public Works
           11/4/2024 2:38 PM
                                                                                                                            1

Source page 4

FORM A
                               TOWN OF CANTON
                               CAPITAL PLANNING COMMITTEE
                               SIX-YEAR PLAN                                                      FY2025                                                                            5-Year                  6-Year
                                 Beginning with Fiscal Year 2025 and ending with 2030             VOTED            FY2026    FY2027     FY2028    FY2029     FY2030                 TOTAL          FY2031   TOTAL
                                 (000's omitted)
Trailer                        2012 Terex Utility Trailer                # T3                                                                                                                  0                     0
Stump Grinder                  2001 Stump                                # 60                                                                                                                  0                     0

                               TOTAL - EQUIPMENT                                                       98              14       431         38        18       125                       626            0       626

BUILDING & GROUNDS REPAIR
Forge Pond Dam Inspection                                                                                                                             15                                    15                      15
Old Shepard Street Dam Inspection                                                                                                                     15                                    15                      15
Shepard Pond Dam Inspection                                                                                             9                                                                    9        12            21
Bolivar Pond Dam Inspection                                                                                             9                                                                    9        12            21
Reservoir Pond Dam Inspection                                                                                                     12                                                        12                      12
Revere Street Dam Inspection                                                                                             9                                                                   9         12           21
Wash./Chapman Streets Intersection Improvements                                                                                                                                              0                       0
Cemetery stone preservation                                                                                                                                                                  0                       0
Town Wide Traffic Study (Traffic Revolving Funding)                                                                                                                                          0                       0
Randolph York Intersection Improvements (Randolph St. Mitigation Funds)                              298                                                                                     0                       0
DPW Garage - Paint Exterior                                                                                                                                                                  0                       0
Dedham St Utilitiy Easement                                                                                                                                                                  0                       0

                               TOTAL - BUILDINGS & GROUNDS                                           298               27         12         0        30          0                         69        36        105

TOTAL CASH CAPITAL                                                                                   716              317       888        473       318       125                     2,047         121      2,168



DEBT

VEHICLES
Utility                   2008 Ford F550                   # 10                           D                                       85                                                      85                     85
Utility                   2006 Ford F-250                  #14                            D                                                                                                0                      0
Dump-Sander - Replacement Replace - 1999 Sterling          #15                            D          246                                                                                   0                      0
Dump                      2014 International Dump #7400    # 17                                                                            265                                           265                    265
Dump-Sander               2009 Intl 7400                   # 18                                                                 260                                                      260                    260
Dump 4x4                  2002 Ford F750                   # 19                                                       424                                                                424                    424
Dump                      2013 Intl 7400                   # 22                                                                                      270                                 270                    270
Dump - Sander             2015 International 7400 SFA      # 23                                                                                                275                       275                    275
Dump-Sander - Replacement Replace - 1999 Sterling          # 24                           D          246                                                                                   0                      0
Dump 4x4                  2016 Ford F550                   # 25                                                                                                                            0          90         90
Dump 4x4                  2012 Ford F550                   # 26                                                                             90                                            90                     90
Dump-Sander               2011 Intl 7400 SFA               # 28                                                                                                                            0         280        280
Bucket Truck              2000 Ford F-750 Forestry         # 37                                                                                                                            0                      0
Dump                      10 Wheel 18 c.y. Dump            NEW                            D                                                                                                0                      0
Box Truck                 Freightliner M2 106                                                                                                                                              0                      0
Dump                      6 Wheel 5 c.y. Dump                                             D                                                                                                0                      0
New - Ford Explorer Hybrid - Stormwater Manager/Engineering                               D                                                                                                0                      0
Loader                    2008 CAT 928H                    # 70                                                                 250                                                      250                    250

                               TOTAL - VEHICLES                                                      492              424       595        355       270       275                     1,919         370      2,289

SPACE NEEDS
Cemetery Garage                                                                                                                 275          0          0         0                      275            0       275

                               TOTAL - SPACE NEEDS                                                      0               0       275          0          0         0                      275            0       275


TECHNOLOGY
Asset Management Software                                                                                              34                                                                   34                      34
available for use                                                                                                                                                                            0                       0
available for use                                                                                                                                                                            0                       0

                               TOTAL - TECHNOLOGY                                                       0              34          0         0          0         0                         34          0           34



EQUIPMENT
Street Sweeper             2010 Elgin Pelican                            # 35                                         330                                                                330                    330
Sidewalk Tractor           2015 MT Trackless                             # 47                                                                        125                                 125                    125
Sidewalk Tractor           2008 Camoplast                                # 48                                                              125                                           125                    125
Sidewalk Tractor/Plow      1992 Bombardier                               # 49                                                   125                                                      125                    125
Chipper                    2024 Vermer Chipper                           # 55                          60                                                                                  0                      0
Bolivar Garage Security System                                                                                                                                                             0                      0
Bolivar St. Garage 6,000 Gallon Fuel Cell Replacement                                     D          162                                                                                   0                      0
Bolivar Garage - Mobile Truck Lifts                                                       D                                                                                                0                      0
Sidewalk Tractor           2022 Multihog                                 # 95             D                                                                                                0                      0

                               TOTAL - EQUIPMENT                                                     222              330       125        125       125          0                      705            0       705

BUILDING & GROUNDS REPAIR
5 Year Roadway Maintenance Program (Prop. 2 1/2 Debt Exclusion)                                    1,000                        400        400       400       400                     1,600       20,000    21,600
Randolph York Intersection Improvements (Randolph St. Mitigation Fund)                    D          102                                                                                       0    3,000     3,000
Sidewalk Program (Prop. 2 1/2 Debt Exclusion)                                                                                                                                                  0        0         0
            O:\Ellen\CPC - Capital Planning Committee\CPC FY2026\CPC FY26 - Requests from Departments\FY26 - TAB & - Public Works\Copy of PW Work Sheets.XLSX6-YEAR PLAN FORM A Public Works
            11/4/2024 2:38 PM
                                                                                                                             2

Source page 5

FORM A
                                   TOWN OF CANTON
                                   CAPITAL PLANNING COMMITTEE
                                   SIX-YEAR PLAN                                                     FY2025                                                                         5-Year                  6-Year
                                     Beginning with Fiscal Year 2025 and ending with 2030            VOTED         FY2026    FY2027     FY2028    FY2029     FY2030                 TOTAL          FY2031   TOTAL
                                     (000's omitted)
Randolph Street Improvements - Paving and Sidewalks                                                                                                                                        0        2,845     2,845
East-West Road (Prop. 2 1/2 Debt Exclusion)                                                                                                                                                0       15,000    15,000
Town Wide Traffic Study                                                                                                                                                                    0          450       450
Washington/Randolph Streets Intersection Improvements                                                                                                                                      0            0         0
Massapoag Brook Study                                                                                                                      265                                           265          300       565
Memorial Field Study                                                                                                                                 270                                 270            0       270
Greenlodge Street Drainage                                                                                                                                                                 0            0         0
Old Shepard St. Pond Dam Repair Design                                                        D                                                                                            0            0         0
Downtown Streetscape - Downtown Crosswalk Rehabilitation                                                                                   300                                           300          640       940
Cemetery Roads                                                                                                                  325                                                      325          150       475
Rockland St. Culvert                                                                                                                                                                       0          230       230
Mechanic St. Culvert                                                                                                                                                                       0          200       200
Drainage Repairs/Culverts - Elm St. Culvert Downstream Retaining Wall                         ARPA                                                                                         0            0         0
Road Improvements Sherman/Angela/Pleasant (Bridge in '22)                                                                                                                                  0            0         0
Bailey Street Reconstruction                                                                                                                                                               0        3,500     3,500
Stormwater Management Program                                                                                                                                                              0          650       650
Canton River/East Branch Drainage Basin                                                                                                                                                    0            0         0
Stabilize Bolivar Street Dam Walls & Main Spillway - Phase 1                                                                                                                               0                      0
Increase capacity of Bolivar Street Main Spillway and Culvert - Phase 2                                                                                                                    0                      0
Pleasant Circle Storm Drain                                                                   D                                                                                            0                      0
Stormwater BPM - Galvin School                                                                D                                 210                                                      210                    210
Stormwater BMP - Hansen School                                                                                                             240                                           240                    240
Stormwater BMP - Ponkapoag                                                                                                                           400                                 400                    400
York at Ledgewood Drain                                                                                                         750                                                      750                    750

                                   TOTAL BUILDINGS, ETC.                                             1,102              0     1,685     1,205      1,070       400                     4,360       46,965    51,325


TOTAL DEBT                                                                                           1,816            788     2,680     1,685      1,465       675                     7,293       47,335    54,628

TOTAL - DEPARTMENT PUBLIC WORKS                                                                      2,532         1,105      3,568     2,158      1,783       800                     9,340       47,456    56,796



ENTERPRISE FUNDS


                                   WATER ENTERPRISE FUND

WATER IMPROVEMENT PROJECTS
Water Towers/Tank - Maintenance                                                               D                                                                                            0                      0
Year 0 Water System Improv. - Design Main Replace Various Streets                             S                                                                                            0                      0
Year 1 Water System Improv. - Design Main replace Various Streets                             D                                                                                            0                      0
Year 2 Water System Improv. - Const Design Main Various Streets                               D                    4,500                                                               4,500                  4,500
Year 3 Water System Improv. - Const Design Main Various Streets                               D                               3,538                                                    3,538                  3,538
Year 4 Water System Improv. - Const Design Main Various Streets                               D        280                              3,255                                          3,255                  3,255
Year 5 Water System Improv. - Const Design Main Various Streets                               D                                                    3,395                               3,395                  3,395
Year 6 Water System Improvements - Randolph St. Tank                                          D                                                                                            0        3,878     3,878
Year 7 Water System Improvements - Ponkapoag Area Pipe                                        D                                                                                            0                      0
Lead Service Line (LSL) Inventory & Replacement Planning                                      D        215                                                                                 0                      0
Water System Improvements - Update 5 Year CIP                                                 S                                                                                            0                      0
Comprehensive Water Resource Management Plan (Water Component)                                S                                                                                            0                      0
Contract 3 - Replace water mains, etc. Randolph St, Randolph Terrace, Old Randolph, Bolivar   D                                                                                            0                      0
Replaced 6" water main with 8" water main on Revere Court                                     D                                                                                            0                      0
Repair to Neponset S. Water Treatment Facility - Replace Filtration Unit                      D                                 500                                                      500                    500
Moran WTP Satellite Well                                                                                              125       350
MWRA Dedham St Valve - Repurpose Control Valve                                                D                                                                                                0                    0



TOTAL - WATER IMPROVEMENT PROJECTS                                                                     495         4,625      4,388     3,255      3,395          0                   15,188        3,878    19,066

VEHICLES
Utility 4x4                        2009 Ford F250                 # 4                         S                                                                                            0                      0
Replace - Pickup                   2008 Ford F150 Supercrew M60589# 2                         S                                                                                            0                      0
Pickup                             2021 Ford F350                 # 7                         S                                                                                            0                      0
Automobile                         2020 Ford Hyb Escape           #12                         S                                                                  65                       65                     65
Trailer - Sign Board               2013 WANCO Sign Board/Trailer # 7                          S                                                                                            0                      0
Pickup                             2012 Ford F350                 # 71                        S                                                                                            0                      0
Pickup                             2022 Ford F 350                #9                          S                                                                                            0                      0
Pickup                             2022 Ford F 150                # 72                                                                                                                     0                      0
Pickup                             2006 Ford F250                 # 39                        S                                   80                                                      80                     80
Dump                               2010 International 7400        # 20                        D                                                                270                       270                    270
Utility 4x4                        2022 Ford F 350                # 31                        S                                                                                            0                      0
Utility 4x4                        2008 Ford F550                 # 34                        S                                             90                                            90                     90
Pickup                             2006 Ford F350                 # 14                        S                                   85                                                      85                     85
Pickup                             2012 Ford F550                 # 87                        S                                                       90                                  90                     90
Truck                              2016 Freightliner Truck        # 91                        S                                                                                            0         275        275

                                   TOTAL - VEHICLES                                                       0             0       165         90        90       335                       680         275        955


            O:\Ellen\CPC - Capital Planning Committee\CPC FY2026\CPC FY26 - Requests from Departments\FY26 - TAB & - Public Works\Copy of PW Work Sheets.XLSX6-YEAR PLAN FORM A Public Works
            11/4/2024 2:38 PM
                                                                                                                             3

Source page 6

FORM A
                               TOWN OF CANTON
                               CAPITAL PLANNING COMMITTEE
                               SIX-YEAR PLAN                                                      FY2025                                                                            5-Year                  6-Year
                                 Beginning with Fiscal Year 2025 and ending with 2030             VOTED            FY2026    FY2027     FY2028    FY2029     FY2030                 TOTAL          FY2031   TOTAL
                                 (000's omitted)


Equipment
Loader                    2009 Cat 928h                                   # 27            D                                                          220                                 220                    220
Backhoe/Loader            2014 Cat 420                                    # 29            S                                                          160                                 160                    160
Backhoe/Loader            2003 JCB                                        # 32            S                                     160                                                      160                    160
Compressor                2023 Doosan                                     # 38            S                                                                                                0                      0
Tamper Wacker             1986 Tamper Wacker                              # 41                                                                                                             0                      0
Compressor                1995 Sul,Air Comp                               # 56      66                                                                                                     0                      0
Generator                 89 Homelite Generator                                     27                                                                                                     0                      0
Loader                    92 Mich Loader L50                                        32                                                                                                     0                      0
Compressor                2002 Sul Air Compressor                         # 56                                                                                                             0                      0
Hot Box Infrared Paver/Trailer - New                                                      S            98                                                                                  0                      0
Mixer                     2012 MQ Cement Mixer                            # 66                                                                                                             0                      0
Skidloader                2018 AVS Skidsteer                              # 67                                                                                                             0          65         65
Backhoe/Loader            2008 Cat 420eit                                 # 69            S                                                160                                           160                    160
Loader                    2008 CAT 928                                    # 70                                                             220                                           220                    220
Excavator                 New CAT 305 Mini                                                                             80
Trailer                   New MAXX-D Tilt Trailer                                                                      16
Cargo Trailer             Enclosed Cargo Trailer                                          S                                                                                                    0                     0
Cat 27 Loader Attachments - Forks & Booms                                                 S            13                                                                                      0                     0
Equipment Replacements                                                                                                                                                                         0                     0
One Ton Roller            2013 Wacker                                     # 63            S                                                                                                    0                     0
Water Storage Containers (2)                                                              S                                                                                                    0                     0

                                                                                                     111               96         0        380         0          0                      380          65        445
                               TOTAL - EQUIPMENT                                                     111               96       160        380       380          0                      920          65        985

BUILDING & GROUNDS REPAIR
Demolish Storage Buildings at Pine Street                                                 S                                                                                                    0                     0
                                                                                                                                                                                               0                     0

                                TOTAL- BUILDINGS, ETC                                                   0               0          0         0          0         0                            0        0            0


TECHNOLOGY
SCADA Upgrade                                                                             S                                                                                                  0                       0
Asset Management Software                                                                 S                            35                                                                   35                      35
Ciopier                                                                                   S                                                                                                  0                       0
Meter Readers - Handheld                                                                  S                                                                                                  0                       0

                               TOTAL - TECHNOLOGY                                                       0              35          0         0          0         0                         35          0           35

                               WATER ENTERPRISE ACCOUNT                                              606           4,756      4,713     3,725      3,865       335                    16,823        4,218    21,041

                               WATER ENTERPRISE ACCOUNT SUMMARY - FUNDING

                               SURPLUS REVENUE                                            S          111              35        325       250        250        65                       925          275     1,200
                               DEBT                                                       D          495           4,500      4,038     3,255      3,615       270                    15,678        3,878    19,556

TOTAL - WATER ENTERPRISE ACCOUNT - FUNDING                                                           606           4,535      4,363     3,505      3,865       335                    16,603        4,153    20,756

                               SEWER ENTERPRISE FUND

SEWER IMPROVEMENT PROJECTS
Year 0 - FY 24 Infiltration - Inflow Project                                              D                                                                                                    0                     0
Year 1 - Sewer System Capital Improvement Plan                                            D        1,700                                                                                       0                     0
Year 2 - FY 26 Infiltration - Inflow Project                                              D                        2,300                                                               2,300                  2,300
Year 3 - FY 27 Infiltration - Inflow Project                                              D                                   1,800                                                    1,800                  1,800
Year 4 - FY 28 Infiltration - Inflow Project                                              D                                             1,800                                          1,800                  1,800
Year 5 - FY 29 Infiltration - Inflow Project                                              D                                                        1,800                               1,800                  1,800
Sewer System Extension - Palmer Street Area - A&E                                         D                                                                    350                       350                    350
Sewer System Extension - Palmer Street Area - Construction                                D                                                                                                0        3,200     3,200
Sewer System Extension - Grand Street                                                     D                                                                                                0          700       700
Sewer System Extension - Wayside Lane                                                     D                                                                                                0        4,800     4,800
Sewer System Extension - Green Lodge Street                                               D                                                                                                0            0         0
Sewer System Extension - Ledgewood Drive                                                  D                                                                                                0        5,600     5,600
Sewer System Extension - York Street                                                      D                                                                                                0        4,100     4,100
Sewer System Extension - Westdale Road                                                    D                                                                                                0        1,500     1,500
Sewer System Extension - Glen Echo Pond - A&E                                             D                                                                                                0        2,100     2,100
Sewer System Extension - Glen Echo Pond - Construction                                    D                                                                                                0       12,500    12,500
Comprehensive Water Resource Management Plan (Sewer Component)                            S                                                                                                0                      0
Sewer Replacement - Estey Way                                                             D                                                                                                0                      0
                                                                                          S                                                                                                0                      0
                                                                                          D                                                                                                0                      0
                                                                                          S                                                                                                0                      0

TOTAL - SEWER IMPROVEMENT PROJECTS                                                                 1,700           2,300      1,800     1,800      1,800       350                     8,050       34,500    42,550

            O:\Ellen\CPC - Capital Planning Committee\CPC FY2026\CPC FY26 - Requests from Departments\FY26 - TAB & - Public Works\Copy of PW Work Sheets.XLSX6-YEAR PLAN FORM A Public Works
            11/4/2024 2:38 PM
                                                                                                                             4

Source page 7

FORM A
                                 TOWN OF CANTON
                                 CAPITAL PLANNING COMMITTEE
                                 SIX-YEAR PLAN                                                      FY2025                                                                            5-Year                  6-Year
                                   Beginning with Fiscal Year 2025 and ending with 2030             VOTED            FY2026    FY2027     FY2028    FY2029     FY2030                 TOTAL          FY2031   TOTAL
                                   (000's omitted)
VEHICLES
Utility 4x4                      2008 Ford F550                            # 36             S                                                           90                                    90                      90
Utility 4x4                      2006 Ford F550                            # 45             S                                                 90                                              90                      90
Pickup                           2016 Ford Explorer                        #9               S                                                                                                  0                       0
Utility 4x4                      2005 Ford F550                            #31              S                                       90                                                        90                      90
Utility 4x4                      2011 Ford F350                            # 8              S                                                                      85                         85                      85

                                 TOTAL - VEHICLES                                                         0               0         90        90        90         85                      355            0       355

EQUIPMENT
Flush Truck              2008 International 7300                           # 71             D                                     275                                                      275                    275
TV Truck                 2001 Cues                                         # 73             S                                                          200                                 200                    200
Excavator                2015 Cat 303.5E                                   # 46             S                                                                    120                       120                    120
Sewer Pump Station Generator - Forest Avenue                                                S                                                                                                0                      0
Pickup                   2023 Ford F 150                                   # 72             S                                                                                                0                      0
Skid Steer Loader w/Brush Attachment & Snow Plow                                            S          110                                                                                   0                      0
Tilt Deck Trailer                                                                           S           14                                                                                   0                      0

                                 TOTAL - EQUIPMENT                                                     124                0       275          0       200       120                       595            0       595
TECHNOLOGY
Asset Management                                                                            S                            34                                                                   34                      34
CCTV Camera                      Cues OZIII-S CCTV Camera                                                                59
Meter Replacement                                                                           D                                                                                                    0                     0

                                 TOTAL - TECHNOLOGY                                                       0              93          0         0          0         0                         34          0           34

                                 SEWER ENTERPRISE ACCOUNT                                            1,824           2,393      2,165     1,890      2,090       555                     9,034       34,500    43,534

                                 SEWER ENTERPRISE ACCOUNT SUMMARY - FUNDING

                                 SURPLUS REVENUE                                                       124              34         90        90        290                                 504                    504
                                 DEBT                                                                1,700           2,300      2,075     1,800      1,800       555                     8,530       34,500    43,030

TOTAL - SEWER ENTERPRISE ACCOUNT - FUNDING                                                           1,824           2,334      2,165     1,890      2,090       555                     9,034       34,500    43,534




              O:\Ellen\CPC - Capital Planning Committee\CPC FY2026\CPC FY26 - Requests from Departments\FY26 - TAB & - Public Works\Copy of PW Work Sheets.XLSX6-YEAR PLAN FORM A Public Works
              11/4/2024 2:38 PM
                                                                                                                               5

Source page 8

TOWN OF CANTON
FORM B - FISCAL 2026

CAPITAL PROJECT / EQUIPMENT REQUEST

DEPARTMENT:
Public Works

SUBMITTED BY:
Michael Trotta

PROJECT / EQUIPMENT TITLE:

Water System Improvement Construction Contract 4

TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
$4,500,000

DESCRIPTION:

Sanford Street, Fuller Street.

Replace water mains, house service connections, hydrants, and valves on Sherman Street,

PURPOSE AND JUSTIFICATION:

This request is for funding the construction of design work approved at ATM 2025. Contract 4
is estimated at $4,458,965. Contract 4 will consist of replacing approximately 8,500 feet
undersized aged pipe to improve fire flow and water pressure. The funding request includes
traffic control, on-site construction inspection, and full width pavement restoration.

NEED CLASSIFICATION: (Check all that apply)
Required for Safety

“~~ Required by Law or Mandate

__ Improve/Expand Service or Increase Efficiency

x Planned Project or Replacement
Unplanned Project or Replacement
New Project/Item (not on last year's 5-Yr. Plan)

Departmental Priority Ranking:
Please rank this request out of your total
requests for this year: (#1 as top priority)
5 (#) OF          5 (#)

Expected Useful Life: (Check one)
_x 20 or More Yrs       5 to 9 Years
___10 to 19 Years       3 to 4 Years

Impact to Dept. Operating Budget: (Check one)
Will Reduce Cost by $

“x No Impact

~~ Will Increase Cost by $

Revenue Impact: (Check one)
Will Produce Add! Revenue by $

“X_ Revenue Neutral (no impact)

~_ Will Decrease Revenue by $

OR

OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

TTSCALZUL0

Source page 9

Can
KLE/INFELDEFR

Bright People. Right Solutions.
SS

November 4, 2024
Kleinfelder Project No.: 20201065.006A

Mr. Michael Trotta
Superintendent of Public Works
Town of Canton

801 Washington Street
Canton, MA 02021

SUBJECT:

Water Main Improvements Program

Contract 4 — Sherman, Sanford, Fuller
Opinion of Probable Construction Cost for Capital Request

Dear Mr. Trotta:

We have completed an Opinion of Probable Construction Cost (OPCC) for the Canton Contract
4 Water Main Project for Capital Appropriations. Contract 4 is partially from the 2023 Water
Master Plan, a 5-year capital improvement program (CIP) of water main improvements and a
recommended street, Sherman Street, to replace aging water mains with frequent break history
and/or that have outlived their estimated service life.

SCOPE OF WATER MAIN IMPROVEMENTS — CONTRACT 4

The next phase of improvements to the Canton Water Main Improvements program in Contract
4 includes water main replacement on Sherman Street (Beaumont to Pleasant), Sanford Street

in its entirety, and Fuller Street in its entirety.

Surface restoration shall be temporary and permanent trench repairs with sidewalks, curbs,
driveways and grass areas restored in-kind on all streets.

Table 1: Summary of Water Main Improvements Contract 4

Location

Proposed Scope

Sherman Street between Beaumont St. and
Pleasant St.

Replacement of 6,400 ft of 10-inch diameter
water main with 8-inch water main

Sanford Street from Sherman to the end of
Sanford St.

Replacement of 320 ft of 1941 6-inch water
main with 8-inch water main

Fuller Street from Neponset St. to Sunnyside
Ave.

Replacement of 940 feet of 1920 6-inch main
with 8-inch water main

KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p| 617.497.7800

Page 1 of 2

f | 617.498.4630

Source page 10

CAPITAL BUDGET ESTIMATE

We have developed the following Engineer's opinion of probable capital costs (OPCC) for FY25
Water Main Improvements Contract 4 based on the median unit prices for recent bids for
Contract 3 and early preliminary estimated quantities. A 10% contingency is included. We have
assumed a construction duration of 24 weeks of active construction, utilizing one mainline crew
and one service crew.

Contract 4 will consist of approximately 8,500 feet of aging water main replacements and
improvements to fire flow. This project also includes pavement overlay curb to curb. The
Contract 4 water main improvements consist of:

Item                                                  Opinion of Probable Cost

Water System Improvements                                                                 $2,795,687
Pavement / Surface Restoration                                                           $644,281
Subtotal                                                                                   $3,439,969
10% Contingency                                                                          $343,997
Police Details                                                                               $300,000
Construction Phase Engineering Services                                              $375,000
Total                                                                                       4,458,965

If you have any questions or need additional information, please don’t hesitate to contact me.

Sincerely,
KLEINFELDER

SS

Tyson Ross
Senior Project Professional / Project Manager

Page 2 of 2

KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p|617.497.7800 f| 617.498.4630

Source page 11

TOWN OF CANTON
FORM B - FISCAL 2026

CAPITAL PROJECT / EQUIPMENT REQUEST

DEPARTMENT:                                                            SUBMITTED BY:
Public Works                                                         Michael Trotta

PROJECT / EQUIPMENT TITLE:
Year 2 5-year Sewer Capital Improvement Plan (CIP)

TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
$2,300,000

DESCRIPTION:
Year 2 of the 5-year Sewer CIP for the inspection, evaluation, rehabilitation of Canton's
wastewater collection system. The works includes pipe rehab / replacement, CCTV pipe
inspection, flow metering, asset management plan updates.

PURPOSE AND JUSTIFICATION:
In 2023 Public Works completed a 5-year Sewer CIP. Phase I was funded at ATM 2023, Phase
II at 2024. Phase III / Year 2 work includes design and construction of rehab work in
Subareas 18 and 24, Sherman St., Bolivar St., Lawrence St., Neponset St. The purpose of the
project is to continue Town's commitment to reduce inflow / infiltration and build climate
resiliency into the wastewater system.

NEED CLASSIFICATION: (Check all that apply)       Departmental Priority Ranking:

Required for Safety                                              Please rank this request out of your total
~~ Required by Law or Mandate                             requests for this year: (#1 as top priority)
~__ Improve/Expand Service or Increase Efficiency               3 (#) OF          3 (#)

x Planned Project or Replacement                    Expected Useful Life: (Check one)
“Unplanned Project or Replacement                  _x 200rMore Yrs ___5 to 9 Years
~~ New Project/Item (not on last year's 5-Yr. Plan) | — 10 to 19 Years __3 to 4 Years

Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)

___Will Reduce Cost by $                               ___ Will Produce Addl Revenue by $
_x_No Impact                                         _x_ Revenue Neutral (no impact)
___ Will Increase Cost by $                              ___ Will Decrease Revenue by $

OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

The I/I Rehab work is eligible for MWRA I/I Local Funding Assistance Program. The program
provides 75% grant and 25% loan. To be eligible the total project amount must be voted and
approved at Annual Town Meeting.

Intel
TORTIE TTSCAL 2UZ0

Source page 12

(ad
KLEINFELDEFR

Bright People. Right Solutions.
a

TO:                Mike Trotta, Town of Canton DPW

FROM:          Jill Rossini, Courtney Eaton, Kleinfelder

DATE:             October 29, 2024

SUBJECT:        Sewer Capital Improvement Plan (CIP) - 2024 Update
eG               Chris Sykes, Kelsey Quinlan, Town of Canton

Kristen Ryan, Kleinfelder

Starting with the recommended phased rehabilitation plan proposed in the 2023 Sewer Asset
Management Plan (AMP), Kleinfelder revised and updated the 5-year Sewer Capital Improvement Plan
(CIP) for the continuation of inspection and rehabilitation of the system. These efforts include continuing
the sewer rehabilitation/replacement projects, CCTV inspections (Contractor conducted), routine CCTV
audits, as needed, and Asset Management Planning updates. Additionally, The Town is underway with an
SRF-Funded Asset Management Grant to inventory and evaluate the condition of the six (6) sewer pump
stations that the Town owns and operates; an estimated cost for repair and rehabilitation is included as a
line item to be carried forward in the Sewer CIP but will be verified upon findings of the sewer pump
station evaluation effort. The CIP also include two permit driven efforts: development of an Operations &
Maintenance (O&M) Plan and a Climate Resiliency Study for the system. Finally, Kleinfelder recommends
including post-rehabilitation subarea flow metering as a way to monitor and measure the success of the
rehabilitation efforts related to I/] removal as well as flow isolation to more accurately determine pipes
with high infiltration in potential rehabilitation areas.

The updated 5-year CIP for the Town’s Sewer System considers updated unit and engineering costs
learned through the Phase 1 (Year 0) work that the Town just completed in Sub-Areas 27 and 7. The 2024
Update of the 5-Year Sewer CIP is shown in Table 1, which is a revised version of Table 9 of the 2023 AMP.
Table 2 shows the proposed schedule for Phases II through VI. Depending upon construction and market
conditions, the actual pace of rehabilitation work able to be completed each year can vary but it is
generally expected that the work will follow this proposed schedule.

Project 20235346.001A                                    Page 1 of 4                                                October 2024
© 2023 Kleinfelder                                                                                                                    www.kleinfelder.com
KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p | 617.497.7800 f | 617.498.4630

Source page 13

Ce
KLE, INF 1 Ei LDER
Qo Bright People. Right Solutions,

Table 1 2024 Update - 5-Year Sewer CIP Summary

FY25                  FY26                    FY27          |        FY28                  FyY29
(Jul 2024 -—        (Jul 2025-Jun © (Jul 2026 -Jun         (Jul 2027 -        (Jul 2028 -—Jun
i                           Jun 2025) 2026)                  2027) Jun 2028)              2029)
Inspection Plan (Contractor Provided)             |         ;             |                       |                         i

CIP Item

Easements
|                                                                                                                           near Bolivar             East Branch
i                                                                                    Pond, Beaver      Neponset River,
Meadow            Neponset Street,                                            Remaining
Easements in Brook, Pequid        Washington        Ponkapoag       Easements of

os    Inspected Area      | SAI    | BrookEast _ Street     XC Easement _Lesser Priority
|       Subcontractor CCTV? $52,900  | $34,400   | $164,600 |    $48,400    | $129,100 = = $161,500    $598,500
Sewer Rehabilitation     oe ee     _     ss
|          :    Phse = || la    WV    |    Vv    |     vl
I                                                    Subarea27&  Subarea22&  Subarea18&           Dedham &          Randolph &
|                                     Focus Area »                            i                                           24                    Pleasant Sts          Chapman Sts _ Ponkapoag XC                 :
|      —_   Design? | $339,000 _      ) | $368,200 | $298,800 | $263,500 | $179,300 | _—‘$1,739,100

____ Flow Isolation*    -    aS         -    7    $2,000 —S—- $5,800    $4,000 _      $11,800
___ Construction’ | $1,015,000 | $1,213,000 | $1,339,000 | $1,062,600     $937,000 $637,600 = $6,204,200

'         Post-Rehabilitation Flow           -                   -          i      $50,000                  -                $50,000                -                   $100,000
Se a     bss            ———
| Sewer Pump Stations’ |     TE preacaeusnull           |             |
     Pump Station Evaluation === - 988,140           a           =           $88,140
Pump S               as      - | $150,000 $150,000 ___-$150,000_| $150,000       $600,000
Planning / Permit             gf         hae; aay
| €CTV Audit /AM Planning?) |         _| $50,000 | _ $50,000 | $50,000 $50,000        $274,375 |
i       ____ Software Fees? -   = t       $86,005 $88,585      $91,243      $93,980       $443,313
|      — O&MPlan?) =     | $75,000.     -     ee    |     -        $75,000

Climate Resiliency Plan” = -        ae ae     as    :     $75,000 _     nS           $75,000
oe       _Total| $14,       | $1,783,715 | $2,282,805 | $4,700,385 | $1,751,643 | $1,276,380 | $10,201,828
Project 20235346.001A                                                                                Page 2 of 6                                                                                October 2024
© 2023 Kleinfelder                                                                                                                                                                                                    www. kleinfelder.com

KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p | 617.497.7800 f | 617.498.4630

Source page 14

ps,

KLEINFELDEFR

Mca, Bright People. Right Solutions.

Notes

*Year 0 values are based on actual contract costs.

?Estimated based on a day rate of $5,000 multiplied by an estimate of days to complete based on estimated completed linear footage per day plus engineer oversight and review.
3Design costs are based on an assumed percentage of the construction estimates as follows: 10% for design fee, 18% for Engineering Services During Construction (ESDC) + Resident
Engineering, and 5% for permitting.

‘Used unit cost value ($ per LF) derived based on Subarea 27 bid results, applied to the estimated length of pipe within scoped rehab. subarea.

‘Rehabilitation construction estimate is based on relative location, pipe size, and linear footage of subarea scope including 5% mobilization/demobilization, and 15% contingency.
‘Estimate based on prior projects quote applied to temporary flow meter three rehabilitated subareas for a 10-week period.

7.81011Based on high level engineering cost estimates.

° Based on Year 1 actual fee from the Town and incurring a 3% increase annually.

Project 20235346.001A                                                                          Page 3 of 6                                                                         October 2024
© 2023 Kleinfelder                                                                                                                                                                      www kleinfelder.com

KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p | 617.497.7800 f | 617.498.4630

Source page 15

‘
KLEINFELDER
a Bright People. Right Solutions.

Table 2 2024 Update - 5-Year Sewer CIP Schedule

Fy202a_ | _—ry2025_—s«|_~—sv2026—s|~—srv2027,—s«||~—Ssrv2028 =| ~——sFv2029

2024                  2025                             2026                             2027                            2028                             2029                   2030

a |2@/8/Qla;alasal/asasasaya/a;as/a/a/a/a/a/asaysa
AT 2y STAT 28 AA aT at ata ays} atyaly2;3i4i4/2

Subareas 22+16

CCTV Inspections /
Precleaning

Engineering

Bidding

Construction

Subareas 18+24

CCTV Inspections /
Precleaning

Engineering

Bidding

Construction

leasant & Dedham
treet

nov

CCTV Inspections /
Precleaning

Engineering

Bidding

Construction

Project 20235346.001A                                                                               Page 4 of 6                                                                               October 2024
© 2023 Kleinfelder                                                                                                                                                                      www. kleinfelder.com
KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p | 617.497.7800 f | 617.498.4630

Source page 16

fos
KLEINFELDER
wees Bright People. Right Solutions.

_rv202a__-{| __—Fy2025_—s«|_~—srvz0z6—s|~—sv2027_—s«||_~—SsFv2028~=—S | ~—_—=sFv2029

2024                  2025                             2026                             2027                             202:                               2029                    2030

8
as  Qala; a;sa;a;a;aq/aqia/aq;a;aq;aja;a;asajsa
4/1  4/1/2/3/)4}/4/2/3/4)1/2/)3/4

=)
D
2

Randolph & Chapman
Street

CCTV Inspections /
Precleaning

Engineering

Bidding

Construction

lonkapoag Cross-
ountry

ou

CCTV Inspections /

Precleaning
Engineering

Bidding

Construction

Phase / Project Element
Duration

Project 20235346.001A                                                                                  Page 5 of 6                                                                                 October 2024
© 2023 Kleinfelder                                                                                                                                                                                                           www.kleinfelder.com

KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p | 617.497.7800 f | 617.498.4630

Source page 17

pide
KLEINFELDEF

Bright People. Right Solutions.
‘eer

MWRA FUNDING

The Massachusetts Water Resources Authority (MWRA) |/I Local Financial Assistance Program continues
to provide funding for Canton as a member community. This funding is specifically available for |/I related
work including engineering and construction and is available in the form of grants (up to 75%) and zero
interest loans. Canton has already used its Phase 9 and 10 funding for Phase | of the sewer rehabilitation
work. Canton continues to be eligible for funding for the remaining phases, as shown in Table 3 below.
Since the 2023 AMP Update, MWRA has added a Phase 15 — Loan Only funding allocation for Canton as
noted in Table 3. Based upon the 2024 Updated CIP estimates and the Phase 15 funding allocation, the
Town could rely on MWRA funds through Phase Ill of the proposed I/I work (as noted in Table 1).
Kleinfelder will continue to work with MWRA to understand the availability of funds for I/I related work
beyond the phases shown here.

Table 3 MWRA Funding Opportunities

Funding Phase       Funds Available            Funds            Grant Funding          Loan (25%)4°

Allocated               Available                (75%)

(Remaining)

9?        $645,000    |     -
[AOR 8685000 |            |
41 $890,000 $391,650 $293,738 $97,912
| 42% |___ $890,000 | __—«$890,000 | $667,500 | $222,500
| 13 (Loan Only)      $890,000        $890,000           -            $890,000
|    14?    $930,000    | $930,000 = = $697,500 |= $232,500
'45(LoanOnly) $951,000   $951,000    a   $951,000
[ Total | ‘$5,841,000 =» $4,052,650 | $1,658,738 ~=| ~—s«$2,393,913

Phase 9 and 10 funds have been fully distributed.

Phase 12 funds will become available in the fiscal year following distribution of % of Phase 11 funds.
3Phase 14 funds will become available in the fiscal year that Phase 12 funds are allocated.
4Zero-interest loan is repayable over 10 years.

5Town borrowing article must be in place for the full amount of these loan funds before application.

Project 20235346.001A                                Page 6 of 6                                                        October 2024
© 2023 Kleinfelder                                                                                                                    www.kleinfelder.com
KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p | 617.497.7800 f | 617.498.4630

Source page 18

TOWN OF CANTON
FORM B - FISCAL 2026

CAPITAL PROJECT / EQUIPMENT REQUEST

DEPARTMENT:                                                            SUBMITTED BY:
Public Works                                                   Michael Trotta

PROJECT / EQUIPMENT TITLE:
CUES CCTV Sewer Main Inspection Camera

TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
$59,000

DESCRIPTION:

Replace 2001 CUES CCTV Sewer Main Inspection Camera with a current model year CUES
OZIII-S CCTV Camera and Transport System.

PURPOSE AND JUSTIFICATION:

The Sewer Division is working with a technology dated camera and transport system. The
camera is limited in field of vision, image brightness, contrast, and focal distance. The camera
can no longer be supported locally. The camera must be shipped to CUES in Florida for
repairs. This has been done several times since 2020 causing delays in I/I survey work and
trouble spot inspections.

NEED CLASSIFICATION: (Check all that apply)       Departmental Priority Ranking:

Required for Safety                                            Please rank this request out of your total
~ Required by Law or Mandate                            requests for this year: (#1 as top priority)
____ Improve/Expand Service or Increase Efficiency                2 (#) OF           3 (#)

Planned Project or Replacement                      Expected Useful Life: (Check one)
~~ Unplanned Project or Replacement                  ___20 or More Yrs       5 to 9 Years
~x_ New Project/Item (not on last year's 5-Yr. Plan) | “x 10 to 19 Years _ 3 to 4 Years

Impact_to Dept. Operating Budget: (Check one} Revenue Impact: (Check one)

___ Will Reduce Cost by $                               ___ Will Produce Add! Revenue by $.
_x_No Impact                                       _x Revenue Neutral (no impact)
___Will Increase Cost by $                                   Will Decrease Revenue by $.

OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

TORTI TUM CULO

Source page 19

QUOTE 1029241

BARR SALES, INC.                                                                       DATE: OCTOBER 29, 2024
1185 SOUTH BROAD STREET
WALLINGFORD CT 06492                                                EXPIRATION DATE November 29, 2024

TO Town of Canton MA

SHIPPING SHIPPING DELIVERY       PAYMENT

SALESPERSON = JOB METHOD-—sTERMS     DATE      TERMS     RUE DATE
/             | Prepay and
ne a
ory. EM# DESCRIPTION         UNIT         LINE TOTAL
.     ooo RRPSRITION.        PRICE          a
          | TRANSPORTER ASSY,CPR,60        po
4        W360       _ VOLT,BRASS                © $23,220.00          $23,220.00
r         M350         CAMERA ASSY,OZIII-S, EC3044        $28,690.00                $28,690.00
r       | woe      _KITWHEELRUBBERG.CPRIVTRSILM2 64 4p7 op             51407 00
           -               KIT, WHEEL, RUBBER, 10-
4          w3io         15,CPRIWTRGILM2                 $1,472.00                 $1,472.00
pt     KIT. WHEEL,PNEUM,12-        a
4        | wi3t2       | 18 CPRIWTRGILM2              $1,849.00           $1,849.00
                         ~ SPACER, 5" QUICK
8        WMO058        CHANGE, CPR, BRASS               $111.00                 $666.00
                         SPACER,1",QUICK                  po
6      / WMO6t      | CHANGE,CPR,BRASS         | 9133.00)         $798.00

Source page 20

[
.
Mm
S.
r

Use the OZIII-S camera with the CUES steerable Compact Pipe Ranger (CPR) to inspect 6” (152 mm) relined
through 48” (1219 mm) sanitary and storm sewers. OZIII-S connects directly to the CPR transporter with no
exterior wires or cables. The OZIII-S camera includes a sonde to accurately locate the camera in metallic and
non-metallic pipes! An optional inclinometer is also available for inclination surveys.

www.cuesinc.com | salesinfo@cuesinc.com

Source page 21

&€8CUES 4

OZIII-S Camera Features & Benefits

 10X optical zoom and 12X digital zoom; total 120:1        ® Gamepad control of focus, iris, and shutter allows
zoom capability enhances image details from                   the operator to compensate for pipe conditions.
faraway distances.
® Pan, rotate, zoom, and focus homing feature; quick
© 0.4 MP; higher image resolution means sharper               and easy to reorient to the current location.
pictures with maximum detail.
Optical-grade sapphire camera window helps

® 360 x 285 degree pan and rotate viewing capability;          prevent image distortion.

pan and tilt simultaneously while the transporter

moves!                                                                     Includes an internal diagnostic system.
® Field-replaceable cool white LED lighting for              ® Includes a 512 Hz sonde for locating and

6”-72” (152-1829 mm) lines with optional external            inclinometer for inclination surveys.

lightheads; internal lights are directional with the

moving camera head for optimum illumination in          © Can be used in pipelines as small as 5” (127 mm)
© various pipeline conditions.                                        in diameter.

10X optical zoom and 12X digital zoom; total 120:1
zoom capability.

360 x 285 degree pan and rotate viewing capability.

Can be used in pipelines as small as 5” (127 mm) in
diameter.

|     Auto-focus to quickly focus on an area of interest.

800.327.7791

www.cuesinc.com | salesinfo@cuesinc.com

Source page 22

TOWN OF CANTON
FORM B - FISCAL 2026

CAPITAL PROJECT / EQUIPMENT REQUEST

DEPARTMENT:                                              SUBMITTED BY:
Public Works Department - GIS Division                              Michael Trotta

PROJECT / EQUIPMENT TITLE:
Asset Management Software Upgrade Assistance + Water Treatment Digital Report
Development and Implementation

TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
$34,000 (Sewer Enterprise Share)

DESCRIPTION:

The Town of Canton is looking to upgrade its Asset Management System (AMS) , Cityworks to
the latest version. This upgrade requires all integrated software to be upgraded and a new
site to be created. Active Reports templates will be built to enable digital reporting for the
Neponset Water Treatment Plant reports within. the Cityworks Asset Management System.

PURPOSE AND JUSTIFICATION:

The Public Works Department manages its workload, regulatory inspections, personnel, and
record keeping through its Asset Management System, Cityworks. This program has been
invested in the past 6 years to support operation, construction and maintenance of the Town's
infrastructure. The latest upgrade requires software - specific upgrading experience to ensure
the integral AMS does not experience downtime. Additionally, incorporating digital reporting
templates within the existing AMS will benefit the Water Treatment and Distribution divisions.
It will reduce time and efforts by staff and assist in meeting EPA and DEP regulatory
reporting requirements.

NEED CLASSIFICATION: (Check all that apply)       Departmental Priority Ranking:

Required for Safety                                              Please rank this request out of your total
~~ Required by Law or Mandate                              requests for this year: (#1 as top priority)
“X_Improve/Expand Service or Increase Efficiency               1(#) OF           3 (#)

X Planned Project or Replacement                     Expected Useful Life: (Check one)
“~~ Unplanned Project or Replacement                   ___ 20 or More Yrs       5 to 9 Years
~__New Project/Item (not on last year's 5-Yr. Plan) | X10 to 19 Years ~ 3 to 4 Years

Impact _to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)

___ Will Reduce Cost by $                              ___Will Produce Addl Revenue by $
_X_No Impact                                            _X Revenue Neutral (no impact)
___ Will Increase Cost by $.                              ___ Will Decrease Revenue by $

OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

alaN nV 0 =O TY OAV OY
TOT TSO LE

Source page 23

TOWN OF CANTON
FORM B - FISCAL 2026

CAPITAL PROJECT / EQUIPMENT REQUEST

DEPARTMENT:
Public Works

SUBMITTED BY:
Michael Trotta

PROJECT / EQUIPMENT TITLE:

MAXX-D Equipment Tilt Trailer

TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
$15,400

DESCRIPTION:

New or current model year MAXX-D G8x8324 24' x 83" Gravity Tilt Equipment Trailer.

PURPOSE AND JUSTIFICATION:

Needed to haul CAT 305 CR mini excavator to the job site. The operating weight of the mini
13,000 Lbs. The MAXX-D trailer haul capacity is 17,500 Lbs.

NEED CLASSIFICATION: (Check all that apply)
Required for Safety

“Required by Law or Mandate

~___Improve/Expand Service or Increase Efficiency

Planned Project or Replacement
Unplanned Project or Replacement
x New Project/Item (not on last year's 5-Yr. Plan)

Departmental Priority Ranking:
Please rank this request out of your total

requests for this year: (#1 as top priority)
4 (#) OF          5 (#)

Expected Useful Life: (Check one)
20 or More Yrs       5 to 9 Years

“x_ 10 to 19 Years       3 to 4 Years

Impact_to Dept. Operating Budget: (Check one)
will Reduce Cost by $

“x_No Impact

~_Will Increase Cost by $

Revenue Impact: (Check one)

___ Will Produce Addl Revenue by $.
x Revenue Neutral (no impact)

~~ will Decrease Revenue by $

OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

OR Cm POO

Source page 24

IN STORE PICKUP                                 01 - WRENTHAM

10/30/2024

CANTO025

TOWN OF CANTON
801 WASHINGTON ST
CANTON MA 02021

MATT REARDON

Description           ** QUOTE **

COMMONWEALTH OF MA STATE BID FAC116

New MAXX-D G8X8324 24' x 83" GRAVITY TILT EQUIP. TRAILER
****TNCLUDING THE FOLLOWING OPTIONS****

GVWR G13 - 17,500 LB GVWR

COUPLER C10 - 2 5/16" ADJUSTABLE COUPLER

JACK J04 - 1-10K DROP-LEG JACK

TONGUE/NECK N16 - 8" CHANNEL WRAP TONGUE WITH TOOLBOX
FRAME F73 - 6X2 3/16" TUBE FRAME

CROSSMEMBERS X07 - 3" CHANNEL ON 12" CENTERS

SIDES R03 - STAKE POCKETS AND RUBRAIL

DOVETAIL D51 - 8' STATIONARY/KNIFE EDGE REAR

AXLES A74 - 2-8K ELECTRIC BRAKE AXLES LIPPERT
SUSPENSION S11 - TORSION SPRING SUSPENSION 22.5* UP ON 2
AXLES

WHEEL/TIRE T29 - $1215/75R17.5 H RADIAL TIRES SINGLES FOR
2-B8K

FENDER P06 - DOUBLE BROKE DIAMOND PLATE FENDERS

FLOOR E04 - 2X8 TREATED WOOD FLOOR

LIGHTS/WIRING LO3 - FLUSHMOUNT LED'S / STANDARD SEALED
WIRING HARNESS

COLOR 001 - WET BLACK & PRIMER

SPARE MOUNT Y03 - SPARE MOUNT

D-RINGS 209 4X EXTRA D RINGS

SPARE H49 SPARE WHEEL ASSEMBLY

Subtotal:
Quote Total:

Authorization:

EXPIRY DATE: 11/29/2024

7:56:27 (0)      4
00
7813891813    Q20933

Amount

15388 .00

15388.00
15388.00

Source page 25

PULL
TYPE
Bumperpull /
Gooseneck

LENGTH
22’ - 30'

\3

GVWR
16,000 -
17,500 Ib

WIDTH
83” - 102"

TILT
ANGLE

13°

COUPLERS

21K ADJUSTABLE PINTLE EYE
2 Bie. 30K ROUND GN
COUPLER

_ ROUND GN COUPLER KING

TONGUE/NECKS
8” CHANNEL WRAP TONGUE
WITH TOOLBOX OR TOOL TRAY

STND HEIGHT I-BEAM NECK
(ADD RISER BOX OR DECK-
OVER)

6” EXTENDED HEIGHT RISERS

NECK (ADD RISER BOX OR
DECK-OVER)

DOVETAILS
8’ STATIONARY/KNIFE EDGE
REAR

10’ STATIONARY/KNIFE EDGE
REAR
12’ STATIONARY/KNIFE EDGE
REAR
14’ STATIONARY/KNIFE EDGE
REAR

This 16k split-deck gravity tilt trailer can be ordered with a 102” wide deck, has an 18’ tilt bed, and is super simple and easy to use. Witha
GVWR of up to 17,500 pounds great for hauling heavy equipment like mulchers, stump grinders, or skidsteers.

FENDERS
TANDEM AXLE DRIVE-OVER
FENDERS

FLOORS

2X8 OAK WOOD FLOOR

1/8” DIAMOND PLATE STEEL
FLOOR

BLACKWOOD LUMBER

LIGHTS/WIRING
FLUSHMOUNT LED'S;
STANDARD WIRING/ BATTERY
POWER PACK

D-RINGS
EXTRA 5/8” BULL-NOSE D-
RINGS

MAXX-D

SPARES

SPARE ST215/75R17.5 H RADIAL
TIRE ON SINGLE

OTHER OPTIONS

WINCH ROLLER

WINCH PLATE IN FRONT w/
WINCH ROLLER

WINCH PLATE IN NECK w/
WINCH ROLLER

WARRIOR 9.5K, 12K OR 17.5K
WINCH MOUNTED w/WINCH
ROLLER

WARRIOR 9.5K, 12K OR 17.5K
WINCH IN NECK w/WINCH
ROLLER

FORK POCKETS

WET BLACK(STND) INDIGO BLUE METALLIC RUBY RED METALLIC

MAXX-D GRAY METALLIC

DESERT TAN

25/16” ADJUSTABLE COUPLER

8” CHANNEL WRAP TONGUE

6X2 3/16” TUBE FRAME

3” CHANNEL ON 12” CENTERS
STAKE POCKETS AND RUBRAIL
6’ STATIONARY/KNIFE EDGE REAR
2-8K ELECTRIC BRAKE AXLES

TORSION SPRING SUSPENSION 22.5* UP ON
2 AXLES

$T215/75R17.5 H RADIAL TIRES ON SINGLES
DOUBLE BROKE DIAMOND PLATE FENDERS
2X8 TREATED WOOD FLOOR

FLUSHMOUNT LED'S/STANDARD WIRING

ARMY GREEN

SIGNAL BLUE      FLAME RED    KAWASAKI GREEN

a Mee

Source page 26

TOWN OF CANTON
FORM B ~ FISCAL 2026

CAPITAL PROJECT / EQUIPMENT REQUEST

DEPARTMENT:                                                            SUBMITTED BY:
Public Works                                                         Michael Trotta

PROJECT / EQUIPMENT TITLE:
CAT 305 CR Mini Excavator

TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
$80,000

DESCRIPTION:
A new or current model year CAT 305 CR Mini Excavator equipped with a Wain-Roy manual
coupler and accessory attachments.

PURPOSE AND JUSTIFICATION:
The CAT 305 mini excavator will be used on Water Sewer Division water service and main
jeaks and break repairs. The machine's maneuverability, turning radius, digging depth, and
boom reach will increase the efficiency of repair work and safety of the Digging Crew. The
mini excavator will be fitted with a coupler that will accept purchased attachment of a
hydraulic thumb, 16" and 24" digging buckets and a 48" trenching bucket.

NEED CLASSIFICATION: (Check ail that apply)        Departmental Priority Ranking:

Required for Safety                                            Please rank this request out of your total
~~ Required by Law or Mandate                            requests for this year: (#1 as top priority)
“x_Improve/Expand Service or Increase Efficiency                3 (#) OF           5 (#)

Planned Project or Replacement                     Expected Useful Life: (Check one)

“~~ Unplanned Project or Replacement                   __200rMore Yrs ___5 to 9 Years
_X_New Project/Item (not on last year's 5-Yr. Plan) | _x 10 to 19 Years _ 3 to 4 Years

Impact_to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)

____ Will Reduce Cost by $.                               ___ Will Produce Addl Revenue by $
_x_No Impact                                        ___ Revenue Neutral (no impact)
___Will Increase Cost by $                                  Will Decrease Revenue by $

OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

OR PS OPO DE

Source page 27

Massachusetts & RI Locations:

100 Quarry Dr.              84 Concord St.
Milford, Ma. 01757 —_N. Reading, Ma. 01864

14 Kendrick Rd., Rte 28       2158 Plainfield Pike
Wareham, Ma. 02571      Cranston, RI. 02920

Southworth-Milton, Inc.
www.miltoncat.com

DATE: October 16, 2024
Canton DPW
150 Bolivar St, Canton MA                                                    State Contract:          VEH111
William Walsh
Quote expires: June 30th, 2025

Qty                                     Description                                    List Price | State Contract Price

1        New CAT 305 mini excavator                                  $ 135,000.00 | $           80,000.00
C1.7T final tier 4 engine with auto idle control & block heater
Enclosed cab with heat & AC, adjustable suspension seat

LCD color monitor with pattern changer, rear camera, machine
monitoring, programmable numeric security code, BT radio,
Worktool selector and adjustable aux. hyd. flow in monitor

Long stick w/aux. hyd. lines for single & two way flow (combined)
LED work light package and roof mounted beacon

Hydraulic front blade with dozer mode (enabled via stick steer)
16" wide rubber tracks with tensioner

2 year full factory warranty

Operator training and complimentary delivery included

Worktools included with machine

1         Wain-Roy manual coupler

1          Hydraulic thumb

1        16" Digging (trenching) bucket
1         24" Heavy duty digging bucket
1         48" Grading bucket

Total State Contract Delivered Price: $ 80,000.00

Ryan Boudreau

Governmental and State Sales

Mobile Phone: 774-737-3275
Fax: 774-907-3062
ryan_boudreau@miltoncat.com

Source page 28

FEATURES:

The Cat® 305 CR Mini Excavator delivers power and performance
in a compact size to help you work in a wide range of applications.

ALL DAY COMFORT

= Choose either a canopy or a sealed and pressurized cab which can be
equipped with air conditioning, adjustable wrist rests, and a suspension
seat to help keep you working comfortably all day long.

EASY TO OPERATE

= Controls are easy to use and the intuitive Next Generation LCD monitor
provides easy to read machine information. An advanced touchscreen
monitor can also be equipped as an upgrade option.

STICK STEER TRAVEL MODE

= Moving around the job site is even easier with the Cat Stick Steer
option. Easily switch from traditional travel controls with levers and
pedals to joystick controls to move the machine and to operate the
blade. The benefit of less effort and improved control is in your hands!

BIG PERFORMANCE IN A COMPACT DESIGN

@ Strong lift and dig performance helps you get the job done faster.
The compact radius design lets you access and work in the tightest
areas. Dozer float allows for easy clean up. An angle blade is also an
option for finished grading and easier backfilling applications.

SAFETY ON THE JOB SITE

a Your safety is our top priority. The Cat mini excavator is designed to
help keep you safe on the job. Courtesy work lights and a fluorescent
retractable seat belt are just a couple of the safety features we've built
into the machine.

SIMPLE SERVICE FOR LESS DOWNTIME

@ Maintenance is quick and easy on the Cat mini excavator. Routine
check points are easy to access at ground level through the side doors.

LOWER OPERATING COSTS

= Equipped with features such as auto idle, auto engine shutdown,
and efficient hydraulics with a variable displacement pump, the
Cat mini excavator was designed with reducing your operating
costs in mind.

UNMATCHED DEALER SUPPORT

= Your Cat dealer is here to help you reach your business goals.
From providing equipment solutions to operator training to service
needs and beyond, your Cat dealer is ready to help.

Specifications
Engine                                                                                   Weights
Engine Model                                   C1.7 Turbo                          Minimum Operating Weight with Canopy* 4996 kg         11,016 Ib
Net Power @ 2,400 rpm                                                          Maximum Operating Weight with Canopy** 5655 kg         12,469 Ib
ISO 9249, 80/1269/EEC                      33.6 kW        45.0 hp            Minimum Operating Weight with Cab*        5095 kg         11,234 Ib

Gross Power @ 2,400 rpm                                                          Maximum Operating Weight with Cab**     5754 kg         12,688 Ib
bon u1Bes.20t4                                ato ww         onl               *Minimum Weight is based on rubber tracks, operator, full fuel tank,
Stake                                              100.0 mm       39in                  standard stick, straight blade, no bucket and no extra counterweight.

i                                                    .              pany             **Maximum Weight is based on steel tracks with pads, operator, full fuel
Displacement                                    1.662 L          101 in                 tank, long stick, straight blade, extra counterweight and no bucket.

* Meets U.S. EPA Tier 4 Final emission standards.

¢ Net power advertised is the power available at the flywheel when
the engine is at rated speed and rated power when the engine
is installed with the factory configured fan, air intake system,
exhaust system, and alternator with a minimum alternator load.

CAT

Source page 29

Weight Increase from Minimum Configuration

Sound

Counterweight                                         242 kg            534 Ib
Long Stick                                         34 kg            75 Ib
Steel Tracks with Pads                        375 kg          827 |b
Angle Blade                                          102 kg            225 Ib
Travel System

Travel Speed — High                                 5.0 km/h         3.1 mph
Travel Speed — Low                                2.8 km/h         1.7 mph
Maximum Traction Force — High Speed       24.7 KN          5,553 Ibf
Maximum Traction Force — Low Speed       50.5 kN          11,353 Ibf
Ground Pressure — Minimum Weight          27.3 kPa         4.0 psi
Ground Pressure — Maximum Weight        32.2 kPa        4.7 psi
Gradeability (maximum)              30 degrees

Service Refill Capacities

Cooling System                                 11.0L           2.9 gal
Engine Oil                                        6.0L            1.6 gal
Fuel Tank                                          63.0L            17.0 gal
Hydraulic Tank                                     60.0 L            16.0 gal
Hydraulic System                               75.0 L           20.0 gal

Hydraulic System

Load Sensing Hydraulics with Variable Displacement Piston Pump

Pump Flow @ 2,400 rpm
Operating Pressure — Equipment
Operating Pressure — Travel
Operating Pressure — Swing
Auxiliary Circuit — Primary
Flow*
Pressure*
Auxiliary Circuit - Secondary
Flow*
Pressure*
Digging Force — Stick (standard)
Digging Force — Stick (long)
Digging Force — Bucket

133 L/min        35 gal/min
265 bar          3,843 psi
265 bar          3,843 psi
200 bar        2,901 psi
80 L/min         21 gal/min
265 bar         3,843 psi
28 L/min         7.0 gal/min
265 bar         3,843 psi
28.3 KN          6,362 Ibf
25.2 kN          5,665 Ibf
49.2 kN        11,061 Ibf

*Flow and pressure are not combinable. Under load, as flow rises

Operator Sound Pressure Level

(ISO 6396:2008)

Exterior Sound Power Level

(ISO 6395:2008)

76 dB(A)

97 dB(A)

¢ European Union Directive “2000/14/EC”

Dimensions

Standard Stick

Long Stick

Dig Depth

3420 mm (134.6 in)

3670 mm (144.5 in)

Vertical Wall

2335 mm (91.9 in)

2560 mm (100.8 in)

Maximum Reach
at Ground Level

5590 mm (220.1 in)

5835 mm (229.7 in)

Maximum Reach

5755 mm (226.6 in)

5990 mm (235.8 in)

Maximum Dig Height

5215 mm (205.3 in)

5355 mm (210.8 in)

Maximum Dump Clearance

3700 mm (145.7 in)

3845 mm (151.4 in)

Boom in Reach

2570 mm (101.2 in)

2580 mm (101.6 in)

Tail Swing

without Counterweight

1095 mm (43.1 in)

1095 mm (43.1 in)

with Counterweight

1200 mm (47.2 in)

1200 mm (47.2 in)

9

Maximum Blade Height

385 mm (15.2 in)

385 mm (15.2 in)

10

Maximum Blade Depth

595 mm (23.4 in)

595 mm (23.4 in)

pressure goes down.                                                               11 Boom Height in                    1820 mm (71.7 in) 1895 mm (74.6 in)
Shipping Position
Swing System                                                                12. Overall Shipping Height         2550 mm (100.4 in) 2550 mm (100.4 in)
Machine Swing Speed                        9.0 rpm                             13 Swing Bearing Height            619 mm (24.4 in) 619 mm (24.4 in)
Boom Swing — Left                            72 Degrees                       14 Overall Undercarriage Length 2585 mm (101.8 in) 2585 mm (101.8 in)
Boom Swing — Right                              50 Degrees                           15 Overall Shipping Lengtht 5305 mm/(208.9in) 5340 mm (210.2 in)
Blade                                                                            16  Boom Swing Right                865 mm (34.1 in) 865 mm (34.1 in)
Width (Straight)                                  1980 mm        78.0in              17 Boom Swing Left                   615mm (24.2in) 615 mm (24.2 in)
Height (Straight)                                   390 mm          15.4 in              18 Track Belt/Shoe Width             400 mm (15.7 in) 400 mm (15,7 in)
Width (Angle)                         1980 mm     78.0 in          19 Track Width                 1980 mm (78.0 in) 1980 mm (78.0 in)
Height (Angle)                                     400 mm          15.7 in              20 Ground Clearance                  335mm (13.2in) 335 mm (13.2 in)
ara ae                           em toes                        21 Stick Length                      1351 mm (632 in) 1601 mm (63.0 in)

Certification — Cab and Canopy

Roll Over Protective Structure (ROPS)
Tip Over Protective Structure (TOPS)
Top Guard

ISO 12117-2:2008
ISO 12117:1997
ISO 10262:1998 Level |

Overall Shipping Length depends on blade position during shipment.

Source page 30

Cab

Lift Capacities —              Lift Point Radius—3 m (98 ft)           Lift Point Radius — 45 m(148h)               Lift Point Radius (Maximum)
Minimum Configuration                                  Over Front                                                        Over Front                                                        Over Front                                               =
Lift Point Height                         Blade Down         Blade Up           Over Side         Blade Down         Blade Up           Over Side         Blade Down         Blade Up _         Over Side            (ft)
ran              Standard Stick              tt
(14.8 ft)                         .                    kt                                                                                                                                                          *949                 #949                 *949               3.63
Long Stick                 (i)                                                                                                                                                      (2,093)              (+2,093)              (2,093)            (119)
Standard Stick              kg                                                                                  *1206                 908                   72                   *953                  *953                  707                455
3m      Hansa SHe      (ib)                               (*2,659)      (2,002)      (1,590)      (*2,101)     ("2,101)     (1,559)     (149)
(9.8 ft)           Long Stick           kg                                                       "1249            ‘903             m4            *778            *718            634          4.81
ong Stic       Alb)                               {*2,754)      (1,931)      (1,574)      (1,715)     (*1,715)     (1,398)     (15.8)
Standard Stick            kg           *2587              1641               1257              “1615,               882                696               *975               759                599.             4.96
15m                                               (Ib)           {*5,704)              (3,618)               (2,772)              ("3,581)               (1,945)               (1,535)              (*2,150)              (1,674)               (1,321)             (16.3)
asf)                Lapse                 kg             *2036                 1641                  1255                 71508                  868                   682                  "758                  "798                  541                5.19
ong ot                  (Ib)           (*4,930)              (3,618)               (2,767)              {*3,325)              (1,914)               (1,504)              (*1.751)              (11,751)              (1,193)             (17.0)
Standard Stick           kg          *3260             1559             1183            *1825             855              670             *1190             787              619            477
om                                                (ib)           (7.188)              (3,438)               (2,609)              (*4,024)               (1,885)               (47)              (*2,624)               (1,735)               (1,365)             (15.8)
(oft)             Long Stick             kg          *3193             1534              1158             “1781              833              648              953              mt               ‘555            5.02
nose                  (ib)           (*7,041)              (3,382)               (2,553)              (*3,927)               (1,837)               (1,429)              (*2,101)              (1,568)               (1,224)             (16.5)
Minimum Weight includes cab, rubber tracks, no counterweight, operator, full fuel tank and straight blade.
Lift Capacities —                                      LiftPoint Radius -3m (9.8 ft)                               Lift Point Radius —45 m (148 ft)                                        Lift Point Radius (Maximum)
Maximum Configuration                                  Over Front                                                        Over Front                                                        Over Front                                               m
Lift Point Height                        Blade Down         Blade Up          Over Side        Blade Down         Blade Up          Over Side        Blade Down         Blade Up          Over Side            (ft)
aS              Standard Stick              ny
(14.8 ft)                         -                     ky                                                                                                                                                          *849                 *949                 “949               3.63
Long Stiek                 (i)                                                                                                                                                      (2093)              (12,093)              (2,093)            (119)
‘                  ki                                                                                    *1206                *1206                 git                  *953                  *953                 *953               4.55
3m              a              (i)                                                                                (2.559)              (2,659)              (2,008)              (2,101              (2,101)              (12,101)            (149)
(at)                ion Sak                 kg                                                                                  71249                71249                 904                  *718                  "718                 “778               481
9                        (ib)                                                                                (2,754)              (12,754)              (1,993)              (1,715)              (11,715)              (*1,715)            (15.8)
Standard Stick         kg        *2587          1953           1573          “1615          1059           886           “975           “975           768          4.96
15m                                              (ib)           (°5,204)              (4,306)               (3,482)              (°3561)              (2335)               (1,954)              (12,150)              (*2,150)              (1,593)             (163)
(4.9 ft)                Long Stick                 kg             *2236                 1953                  1577                 *1508                 1045                  872                  *794                  *794                 *794               5.19
:                        (lb)           (*4,30)              (4,306)               (3477)              (*3,325)              (2304)               (1,923)              (*1751)              (11,751)              (*1,751)            (17.0)
Standard Stick           kg          "3260             1871              1505             "1825             1032              860             *1190              951               795            477
om                                                (tb)           (*7,188)              (4,126)               (3,319)              (*4,024)              (2,276)               (1,898)              (+2624)              (2,097)               (1,783)             (15.6)
(oft)                 Long Stick                 kg             #3193                 1847                  1480                 *1781                 1010                  838                  "953                 7953                  721                5.02
9                        (ib)           (*7,081)              (4,073)               (3,263)              (+3327)              (2227)               (1,848)              (2,101)              (*2,101)              (1,590)             (16.5)
Maximum Weight includes cab, steel tracks with pads, counterweight, operator, full fuel tank and angle blade.
Canopy
Lift Capacities —              LiftPoint Radius—3m (98 ft)           Lift Point Radius —45 m (148)               Lift Point Radius (Maximum)
Minimum Configuration                                  Over Front                                                        Over Front                                                        Over Front                                                m
Lift Point Height                       BladeDown | BladeUp | OverSide | BladeDown | Blade Up          OverSide | BladeDown | Blade Up          Over Side           (ft)
ish              Standard Stick              ig
(14.8 ft)               "            k                                                                                              *949           *949           *949         3.63
oe                 i)                                                                                                                                                      (*2,093)              (2,093)              (2093)            1)
i           ki                                                   "1206           887           705           *953           *953           691          455
am               eemdece Sae              to)                                                                                 (12,559)              (1356)               (1555)               (2,01)              (2,01)              (1.524)             (149)
(9.8 ft)                Long Stick                 kg                                                                                   "1249                  881                   698                  “718                  “718                  619                481
s                        (ib)                                                                                 (*2,754)              (1,943)               (1,539)               (*1,715)              (1,715)              (1,365)             (15.2)
Standard Stick           kg          *2587             1603              1230             *1615              861               680              *975              740               585            4.96
15m                                          (ib)              704)             (3,535)              (2,712)             (#3561)             (1,899)             (1,499)             (2,150)             (1,832)             (1,230)            (18.3)
(4.9 ft)              Long Stick                kg               236               1603                1228               *1508                847                 665                 *794                 672                 528               5.19
8             (ib)      (*4,930)        (3,535)        (2,708)        (*3,325)        (1,868)        (1488)        (*1751)        (1,482)        (1,164)       (17.0)
Standard Stick            kg           *3260              1521               1155              "1825               833                654               *1190               ‘167                603             4.27
om                                                iby           (*7,188)              (3354)               (2,547)              (°4,024)              (1,837)               1442)              (12,624)              (1881)               (1,330)             (18.6)
(oft)                 ong ick                 kg             73193                 1497                  1131                 “1781                  B12                   632                  "953                  692                   541                502
ong Ste                  (Ib)           (7,041)              (3,301)               (2,494)              (3,927)              (1,780)               (1,394)              (2,101)              (1,526)               (1,193),             (16.5)
Minimum Weight includes canopy, rubber tracks, no counterweight, operator, full fuel tank and straight blade.
Lift Copacities -                                      LiftPoint Radius —3m (98M)                               LiftPoint Radius — 4.5m (148 f)                                        Lift Point Radius (Maximum)
Maximum Configuration                      Over Front                                      Over Front                                     Over Front                                ia
LiftPoint Height                          Blade Down | Blade Up           Over Side [| BladeDown | Blade Up           OverSide | BladeDown | Blade Up           Over Side            (tt)
8                  ke
cn             Standard Stick              (i)
(148)                         ;                     ki                                                                                                                                                          "349                 +919                 739               369
Long Stick                 ti)                                                                                                                                                      (2,093)              (2,093)              (12,093)            (119)
Standard Stick              ka                                                                                   26                "1206                 895                  *353                  *953                 7953               4.55
3m                                                (ib)                                                                                (2,659)              (*2,859)              (1973)              (*2,101)              (2,101)             (*2,101)            (143)
(9.8 ft)                Long Stick                 kg                                                                                  *1249                 1059                  888                  “7718                 “7718                 “7718               4.81
(ib)                                                                                 (°2,754)              (2,335)               (1,958)              (1715)              (*1,715)              (11,715)            (158)
ey Tr            kg          07              1315              1552             *1615              1038               870               *975              “975               75             4.96
15m                                              {lb)           (*5,704)              (4,223)               (3,422)              (+3561)              (2,289)               (1318)              (*2,150)              (*2,150)              (1,563)             (18.3)
(4.9 ft)            Long Stick             kg          *2236             1915              1550             *1508             1024              855.              *794             *794             $794            5.19
ang Stic                  ib)           (*4,930)              (4,223)               (3,418)              (*3,325)              (2,258)               (1,885)              (*1,751)              (*1,751)             (*1,751)            (17.0)
.                  kg             *3260                 1833                  1477                 *1825                 1010                  B44                  “1190                  931                   780                477
om               Standard Stick              (ib)           (*7,188)              (4,042)               (3,257)              (*4,024)              (2,227)               (1,881)              (*2,624)              (2,053)               (1,720)             (15.6)
(Oft)             Long Stick             kg          #3193             1809              1453             “1781              ‘989              822              *953              *953              707            5.02
Seiad                  (Ib)           (°7,041)              (3,989)               (3,204)              (*3,927)               (2,181)               (1813)              (:2,101)              ("2,101)              (1,559)             (16.5)

Maximum Weight includes canopy, steel tracks with pads, counterweight, operator, full fuel tank and angle blade.
*The above loads are in compliance with hydraulic excavator lift capacity rating standard ISO 10567:2007 and they do not exceed 87% of hydraulic lifting capacity or 75% of tipping capacity. The excavator bucket weight is not

included on this chart.

3

Source page 31

305 CR Mini Excavator

 ‘Standard and Optional Equipment
Standard and optional equipment may vary. Consult your r Cat dealer for details.

Standard         Optional                                                                                              Standard          Optional
ERS TEY BS                          2            Mere                                        [OPERATOR ENVIRONMENT (continued)                                                   Pear ae
at® C1.7 Turbo Engine (U.S. EPA Tier 4 Final)                         v                                        Next Generation Color LCD Monitor (IP66)_                            v
Automatic Engine Idle                                                         v                                           —Fuel Level and Coolant Temperature Gauges                         v
Automatic Engine Shutdown                                          v                                     — Maintenance and Machine Monitoring                            v
Automatic Two Speed Travel                                             v                                        — Performance and Machine Adjustments                             v
Fuel Water Separator                                                         v                                           —Numeric Security Code                                                     v
Power on Demand (not available in all regions]                      v                                      — Multiple Languages                                                   v
Variable Displacement Piston Pump                                   v                                       — Hour Meter with Wake Up Switch                                   v
Load Sensing/Flow Sharing Hydraulics                                 v                                        —Jog Dial (cab only)                                                      v
“HYDRAULICS                 ;                                                                          Next Generation Advanced Monitor                                                          v
Smart Tech Electronic Pump                                              v                                          —Touch Screen                                                                                   v
Accumulator                                                                           v                                               — Site Reference System                                                                                  v
Automatic Swing Brake                                                   v                                        —High Definition Camera Capable (IP68 and IPGSK)                                      v
Auxiliary Hydraulic Lines                                                       v                                             —Numeric Security Code                                                                             v
One and Two Way Auxiliary Flow                                          v                                       (UNDERCARRIAGE             =
Continuous Auxiliary Flow                                                           v                                                  Rubber Belt (400 mm/18.7 in)                                                        v
Auxiliary Line Quick Disconnects _                                      v                                            Steel Track (400 mm/15.7 in)                                                                        v
OPERATOR ENVIRONMENT            i         ae                                                                  Steel Track with Rubber Pads                                                                 v
Canopy or Cab                                                      v                                    Dozer Straight Blade                                                4
Cab with Air Conditioning                                                                         v                      Dozer Blade Float                                                              v
Cab with Heater                                                                              v                    Angle Blade                                                                                    v
Top Guard ISO 10262:1998 Level |                                         v                                         Tie Downs on Track Frame                                                 v
ROPS — ISO 12117-2:2008                                               v                                  “BOOM, STICK AND LINKAGES ~                  fe                 Tye
TOPS -1SO 12117:1997                                                      v                                          One Piece Boom (2716 mm/106.9 in)                                      v7
Stick Steer Mode                                                    v                                    Standard Stick (1351 mm/53.2 in)                                   v
Travel Cruise Control                                                v                                    Long Stick (1601 mm/63.0 in)                                                          v
Control Pattern Changer (optional in some regions)                v                                   Front Shovel Capable                                               v
Adjustable Wrist Rests                                              v                                       Pin-On                                                           v
Washable Floor Mat                                                           v                                               Dual Lock Manual Coupler                                                                    v
Travel Pedals and Hand Levers                                         v                                           Hydraulic Coupler                                                                        v
No Travel Pedals and Hand Levers                                                        v                    Thumb Ready                                                             v
(optional in some regions)                                                                                      Certified Lifting Eye                                                     v
Machine Security                                                   v                                   Attachments including Couplers, Thumbs, Buckets,                                 v
Standard Key with Pass Code                                       v                                        Augers and Hammers
Push to Start with Key Fob/Pass Code                                                       v                       2nd Auxiliary Hydraulic Lines                                                                       v
Fabric Suspension Seat (Cab only)                                         v                                            Bucket Divert Lines                                                                                   v
Vinyl Suspension Seat (Canopy only)                                   v                                        Boom Lowering Check Valve                                                                 v
Hydraulic Lockout — All Controls                                      v                                      Stick Lowering Check Valve                                                              v
Retractable High Visibility Seat Belt (75 mmv/3 in)                      v                                          Hydraulic Quick Coupler Lines:                                                                 v
Coat Hook                                                           v                                 {ELECTRICAL   ec
Cup Holder                                                          v                                    12 Volt Battery                                                      v
Storage Pocket                                                          v                                      Software (machine and monitor)                                      v
Skylight                                                              v                                    Maintenance Free Battery                                          v
Mounting Bosses for Front                                                  v                                           Battery Disconnect                                                            v
Signaling/Warning Horn                                            v                                    12 Volt Power Socket                                               v
Interior Light (Cab only)                                                  v                                        Product Link™ PL243 (regulations apply)                                                  v
Boom Light, Halogen (not available in all regions)                     v                                           Product Link PLE643 (regulations apply)                                                        v
LED Front Lights                                                                                       v                      Travel Alarm (optional in some regions)                                   v
LED Front and Rear Lights                                                                v                {GUARDING                                                                                              |
LED Boom Light                                                                            v                    Polycarbonate Half Height Front Guard (Canopy only)                                 v
Utility Space for Mobile Phone                                        v                                      Polycarbonate Front Guard (ISO 10262:1998 Level | and                                v
Mirrors, Left, Right and Rear                                                               v                    EN356 PSA)
Camera                                                                                                 v                      Heavy Duty Front Guard ISO 10262:1998 Level II                                              v
Radio — Bluetooth®, Auxiliary, Microphone,                                                    v                       Heavy Duty Top Guard 10262:1998 Level Il (Cab only)                                      1
USB (charging only) (Cab only)                                                                                   {OTHER               BRE                                                                                3]
Bio Oil Capable                                                                       v
Eco Drain                                                                             v
Water Jacket Heater                                                                                           v
Counterweight (242 kg/534 Ib)                                                        v

Source page 32

TOWN OF CANTON
FORM B - FISCAL 2026

CAPITAL PROJECT / EQUIPMENT REQUEST

DEPARTMENT:
Public Works

SUBMITTED BY:
Michael Trotta

PROJECT / EQUIPMENT TITLE:

Satellite Well at the Moran Water Treatment Facility (PWTP) - Phase I

TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
$125,000

DESCRIPTION:

Initial investigation and design to add a Satellite Water Well at PWTP.

PURPOSE AND JUSTIFICATION:

Wells 11, 12, 14 provide source water to the PWTP. Over the past 20 years the wells have
yielded sufficient water amounts to ensure PWTP was operated at capacity. Well 11 has
begun to see its capacity decline and in need of more frequent cleaning. Well 14 is plagued by
plugging and at times needs to be shut off. As such it is appropriated to consider installing a
satellite well at PWTP. The project will be completed in 2 phases; Phase I initial site
investigation and design - $125,000, Phase 2 construction - estimated $350,000.

NEED CLASSIFICATION: (Check all that apply)
____Required for Safety

____ Required by Law or Mandate

___ Improve/Expand Service or Increase Efficiency

Planned Project or Replacement
Unplanned Project or Replacement
x New Project/Item (not on last year's 5-Yr. Plan)

Departmental Priority Ranking:
Please rank this request out of your total

requests for this year: (#1 as top priority)
2 (#) OF          5 (#)

Expected Useful Life: (Check one)
_x 20 or More Yrs       5 to 9 Years
___10 to 19 Years        3 to 4 Years

Impact _to Dept. Operating Budget: (Check one)
Will Reduce Cost by $

“Xx No Impact

~_ Will Increase Cost by $

Revenue Impact: (Check one)
___ Will Produce Addl Revenue by $
_x Revenue Neutral (no impact)
___ Will Decrease Revenue by $

OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

OR Om BOaG

Source page 33

BRISTOL ENGINEERING ADVISORS, INC.
Infrastructure and Water Resources Engineering

October 28, 2024

Mr. Michael Trotta

Superintendent of Public Works, Town of Canton
801 Washington Street

Canton, Massachusetts 02021

Re:      New Well at Pecunit Site

Dear Mr. Trotta:

Bristol Engineering Advisors, Inc. (Bristol) is pleased to present you with this brief scope and
estimated project cost to add a satellite well at the Pecunit station. Wells 11 and 12 were
installed in 2004 to replace Well No. 4, which had failed due to corrosion of the well

screen. Over the past 20 years, the wells have yielded sufficient water to ensure the Pecunit
WTF was operated at capacity. In 2009, Well No. 14 was installed to provide redundant
capacity, but has, however, been plagued by high levels of iron and frequent plugging.

Well No. 11 has recently seen its capacity decline and cleanings have become more

frequent. As such, it is appropriate to consider the installation of a satellite well to restore lost
capacity. The process involves the advancement of three exploratory borings, followed by the
design, permitting and construction of a public water supply well that will tie into the existing
infrastructure at the site. The project can be completed in two phases, with initial investigation
and design in Phase 1, and construction and construction administration in Phase 2.

e Total estimated Phase 1 costs: $125,000.00
e Total estimated Phase 2 costs: $350,000.00

If you have any questions, please do not hesitate to contact me (508)758-8270 or at
peter.newton@bristolea.com.

Respectfully,

BRISTOL ENGINEERING ADVISORS, INC.

GE Nato

Peter Newton

C:\PROJECT FILES\CANTON\ON-CALL SERVICES\CONTRACTS\2024-10-28 PECUNIIT NEW WELL WARRANT REQUEST.DOCK

BRISTOL ENGINEERING ADVISORS, INC.
MATTAPOISETT                                WWW.BRISTOLEA.COM                                    BOSTON

Source page 34

\
\

* Potential New Well                            x
1 New Well 400ft Buffer —— Sewer Service Line    A  New Well at Moran Water Treatment Plant

‘                                                                                                           0         300 Feet
Easement Lines

Water Supply Wells                                                  (PY u TI )                          :    f       oe oe oe |     |

Source page 35

TOWN OF CANTON
FORM B - FISCAL 2026

CAPITAL PROJECT / EQUIPMENT REQUEST

DEPARTMENT:                                                  SUBMITTED BY:
Public Works Department - GIS Division                             Michael Trotta

PROJECT / EQUIPMENT TITLE:
Asset Management Software Upgrade Assistance + Water Treatment Digital Report

Development and Implementation

TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
$35,000 (Water Enterprise Share)

DESCRIPTION:
The Town of Canton is looking to upgrade its Asset Management System (AMS) , Cityworks to
the latest version. This upgrade requires all integrated software to be upgraded and a new
site to be created. Active Reports templates will be built to enable digital reporting for the
Neponset Water Treatment Plant reports within the Cityworks Asset Management System.

PURPOSE AND JUSTIFICATION:

The Public Works Department manages its workload, regulatory inspections, personnel, and
record keeping through its Asset Management System, Cityworks. This program has been
invested in the past 6 years to support operation, construction and maintenance of the Town's
infrastructure. The latest upgrade requires software - specific upgrading experience to ensure
the integral AMS does not experience downtime. Additionally, incorporating digital reporting
templates within the existing AMS will benefit the Water Treatment and Distribution divisions.
It will reduce time and efforts by staff and assist in meeting EPA and DEP regulatory
reporting requirements.

NEED CLASSIFICATION: (Check all that apply)       Departmental Priority Ranking:

Required for Safety                                             Please rank this request out of your total
“Required by Law or Mandate                             requests for this year: (#1 as top priority)
“X_Improve/Expand Service or Increase Efficiency                1 (#) OF           5 (#)

X Planned Project or Replacement                   Expected Useful Life: (Check one)
“~~ Unplanned Project or Replacement                   ___200rMore Yrs ___5 to 9 Years
__ New Project/Item (not on last year's 5-Yr. Plan) |X 10to19 Years _ 3 to 4 Years

Impact _to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)

___Will Reduce Cost by $                               ___ Will Produce Addl Revenue by $
_X_No Impact                                          _X Revenue Neutral (no impact)
____ Will Increase Cost by $                                  Will Decrease Revenue by $

OTHER COMMENTS OR INFORMATION: (Aitach supporting documentation)

Source page 36

TOWN OF CANTON
FORM B - FISCAL 2026

CAPITAL PROJECT / EQUIPMENT REQUEST

DEPARTMENT:
Public Works

SUBMITTED BY:
Michael Trotta

PROJECT / EQUIPMENT TITLE:

Truck No. 52 WANCO Sign Board

TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
$13,400

DESCRIPTION:

Update Tr. 52 WANCO Sign Board electronic with a current model year WANCO Full Size Matrix

Message Board Conversation Kit.

PURPOSE AND JUSTIFICATION:

Tr. 52 is a 2013 WANCO Message Board. The steel trailer frame and tires and in good
condition. The message board wiring and control panel need to be replaced. The conversion
kit will update the control panel, wiring, and increase the message area to a full size board.

NEED CLASSIFICATION: (Check ail that apply)
Required for Safety

~~ Required by Law or Mandate

"__ Improve/Expand Service or Increase Efficiency

___ Planned Project or Replacement
___ Unplanned Project or Replacement
_x_ New Project/Item (not on last year's 5-Yr. Plan)

Departmental Priority Ranking:
Please rank this request out of your total

requests for this year: (#1 as top priority)
7 (#) OF           7 (#)

Expected Useful Life: (Check one)
___20 or More Yrs        5 to 9 Years
_x 10 to 19 Years       3 to 4 Years

Impact _to Dept. Operating Budget: (Check one)
Will Reduce Cost by $

“ x_No Impact

~__ Will Increase Cost by $

Revenue Impact: (Check one)
Will Produce Addl Revenue by $

“x Revenue Neutral (no impact)

~_ will Decrease Revenue by $

OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

Sdhehenl eee   4.
PORTIS EP TSCA LOLS

Source page 37

Visi Flash Rentals Eastern Inc.                                                                                     O       VISI-E LASH

31 Pleasant Street

West Bridgewater, MA 02379 US                              4M  EL ENE SSN INE:
AR@visiflash.com

ADDRESS                                SHIP TO                                    Estimate 2106

Canton Public Works                   Canton Public Works

801 Washington St.                  801 Washington St.

Canton, MA 02021              Canton, MA 02021               DATE 10/15/2024

DATE                                 DESCRIPTION                               QTY        RATE      AMOUNT

T.C. Equipment Sales = Wanco Full Size Full Matrix Message              1 12,400.00      12,400.00
Board conversion kit (Display Size:
138in 75 in) Full matrix display

T.C. Equipment Sales      (OPTION) Wanco Modem for Fleet                  1      1,000.00        1,000.00
Manager Including 10 years of
service
Contact Visi Flash Rentals Eastern Inc. to pay.                      SUBTOTAL                                 13,400.00

Leadtime is 5-6 weeks. ARO                                                  TAX                                                         0.00

TOTAL                                     $13,400.00

Accepted By                                                            Accepted Date

Source page 38

(W/ANCO

Message Sign Conversion Kit

Full-Matrix and Three-Line

na
ryt
11       t
{    atets   RRR EE   pee EE
Tee    ith
nity      He
|   .         ’
theeaee        T

In-Cabinet Controller

& Capacitive touch screen controller
i Easiest programming in the industry
Bi Intuitive interface with larger buttons
@ Multi-level password protection

& Simple installation or replacement

H Requires minimum installation time

@ Durable powder-coat finish

@ Low power consumption and more uptime

& Cooling fans provide overheating protection

@ Energy efficient and superior performance

H Preprogrammed, custom and MUTCD graphics

® Contact factory for optional GPS tracker and modem

’
.
eee
’
’
ones

—-—* —
ca
wwnaeee

Source page 39

Versatile, easy to install kit for any application.

Three-Line Signs
Display
Resolution                       Four amber LEDs form each pixel
Font                                      1 font, 5 x7 pixels

3 lines of 8 characters per line max.
Font size                              12x 18 in, (30% 45 cm)
12V power system

Solar panels not included

130W- 350 W suggested

Wanco Message Sigh replacement/conversion kits are the ideal choice when you
need to upgrade/restore your old fleet with the latest production model. Full-size
signs provide versatility and great performance,

Full-matrix signs provide the greatest flexibility for displaying any type of
message—large or small letters, symbols, graphics. Graphics and text can be
combined in the same message.

Three-line message signs are capable of displaying three rows of alphanumeric
characters. The ultra-bright, highly legible LEDs display your message clearly.

Changing the message is simple, as Wanco signs feature the easiest programming
in the industry, The in-cabinet controller has a 7-inch LCD capacitive touch screen.

Meets NEMA TS 4-2005 Section 2 for ambient temperature, vibration, shock,

Matrix Signs                                                                         electro-static discharge (ESD), and radio interference. NTCIP compliant.
._ , 39in                     i 24in ;

.                                                                                                                                                                                                                                 Bi
Display                                                                                          @ Kit includes:                                                                    {somm]                          mm    [
Resolution                           Four amber LEDs form each pixel                       Message sign board, controller                                                                                b
Matrix                                48 pixels wide, 27 pixels high                           @ Hydraul                   itch housi

raulic pump switch housin
Fonts          T2fonts selectable              sera Pump       5 SS
Defautt font                         5x7 pixels, 3 lines of 8 characters max.               ig Hydraulic pump switch, 4ft wire                                                                              b
Default fant size                      11x16 in. (28x42 cm)                                      @ Mounting hardware                                                               Q                                         eI
12V power system                                                                   2ft solar panel wires                                        Hydraulic switch housing
Solar panelsnotincluided  130W- 390 Wsuggested                           @ 10ft battery box wire                                    To be mounted on the battery box,
left side if Wanco box is used
437.9in
{3802mm]
|  72.5in  '                                      [ 327in ;
4 slots for 1/2"-13                                  1842mm_                                         830mm                                                                         13.6in
f                                                                                                                                                                                                +!
Mounting pankenid                                                     Optional GPS tracker and                                                                                                                                                   {344mm]
locationfdimensions                                   cellular modem 2it wires                                                                                                      A47in
contact factory                                                  U7 Solar panels 2ft wires                       young fans                                                                                                  (297mm]
iL.       .                            .     H     {=F                                                              4      iH
:                     £ oa                                          :
oe
to  it  .                                 74.8in
b                                  [1899mm]}
fk                     69.0in
an         :         .               {1763mm]

In-Cabinet

Controller                                                                                                      !                                                                                         tn-Cabinet,

t                          :         .                                                                                     :                  :                                                                    Controller
44.7in                                       "hI                                                                      ;

on     i                               o     i                                                              ;          .                                                                                                               !
                                     5.2in
3.3i                                                                                                                                                                fF atin                                             .|     Le
{eamm]                16.9!n                      12.2In              Neate box 10ft wire                                              [sama]                              {189mm}
[429mm]                  [30mm]                                                                                                                                                          [142mm] 7
WANCO INC,
5870 Tennyson Street
;                                          ;            ;                                 ;                                                  Arvada, Colorado 80003
Due to Wanco’s commitment to continuous improvement of our products, all information is subject to change without notice.                                                              800-972-0755
Wanco and the Wanco logo are registered trademarks of Wenco Inc, All other trademarks are property of theit respective owners:                                                         303-427-5700
#% Printed on recycled paper ©2022 Wanco Inc. All rights reserved, Printed in the USA. | WPB0064 February 2022                                                            303-427-5725 fax
ae                                                                                                       7                                                                                                www.wanco.com

Source page 40

(W/ANCO

Mini Message Sign Conversion Kit
|  Full-Matrix and Three-Line

® Simple installation or replacement

B Requires minimum installation time

@ Durable powder-coat finish

@ Low power consumption and more uptime
B® Cooling fans provide overheating protection
ibd  Thee eee               B® Energy efficient and superior performance

| Pade! |
ye   hb                     & Preprogrammed, custom and MUTCD graphics

'
feet                 B® Contact factory for optional GPS tracker and modem

In-Cabi     roller
in-Cabinet Controle                                                ’     qreeh when

@ Capacitive touch screen controller
@ Easiest programming in the industry
Bi Intuitive interface with larger buttons
@ Multi-level password protection