Canton, Massachusetts · Saved source text
FY27 Municipal Capital Requests - January 2026 - Part 1 of 3 pdf file
Saved text from 219 source pages. Transcription and OCR may contain errors; verify figures and wording against the original. Retrieved 2026-10-15.
Source page 41
CHROMEDATA An Autodata Solutions Brand _ehicle: [Fleet] 2026 Ford Super Duty F-350 SRW (F3F) XL 4WD Reg Cab 145" WB 60" CA ( * Complete ) Chassis Suspension Shock Absorber Diameter - Front Stabilizer Bar Diameter - Front Tires! Front Tire Order Code Spare Tire Order Code Rear Tire Size Front Tire Capacity Spare Tire Capacity Revolutions/Mile @ 45 mph - Rear Wheels Front Wheel Size Spare Wheel Size Rear Wheel Material Steering Steering Type Steering Ratio (:1), On Center Turning Diameter - Curb to Curb Brakes Brake Type Brake ABS System (Second Line) Disc - Rear (Yes or ) Rear Brake Rotor Diam x Thickness Rear Drum Diam x Width Fuel Tank Fuel Tank Capacity, Approx Fuel Tank Location N/A N/A TDX 512 LT275/70SR18 7180 Ibs N/A 628 18 X Bin Full-Size in Steel Re-Circulating Ball N/A 48.6 ft 4-Wheel Disc 4-Wheel Yes 14.3 in N/A 40 gal N/A Shock Absorber Diameter - Rear Stabilizer Bar Diameter - Rear Rear Tire Order Code Front Tire Size Spare Tire Size Rear Tire Capacity Revolutions/Mile @ 45 mph - Front Revolutions/Mile @ 45 mph - Spare Rear Wheel Size Front Wheel Material Spare Wheel Material Steering Ratio (:1), Overall Steering Ratio (:1), At Lock Turning Diameter - Wall to Wall Brake ABS System Disc - Front (Yes or ) Front Brake Rotor Diam x Thickness Drum - Rear (Yes or ) Aux Fuel Tank Capacity, Approx Aux Fuel Tank Location N/A N/A TDX LT275/70SR18 Full-Size 7180 Ibs 628 N/A 18X 8 in Steel Steel N/A N/A N/A 4-Wheel Yes 14.3 in N/A N/A N/A Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region, Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer's input is subject to the accuracy of the input provided. Data Version: 27039, Data updated Nov 20, 2025 6:47:00 PM PST Nov 22, 2025 Page 5
Source page 42
CHROMEDAITA An Autodata Solutions Brand ehicle: [Fleet] 2026 Ford Super Duty F-350 SRW (F3F) XL 4WD Reg Cab 145" WB 60" CA (+ Complete ) Dimensions Interior Dimensions Passenger Capacity 3 Front Head Room 40.8 in Front Leg Room 43.9 in Front Shoulder Room 66.7 in Front Hip Room 62.5 in Second Head Room N/A Second Leg Room N/A Second Shoulder Room NIA Second Hip Room N/A Exterior Dimensions Wheelbase 145 in Length, Overall w/o rear bumper N/A Length, Overall w/rear bumper N/A Length, Overall 230.7 in Width, Max w/o mirrors 80 in Height, Overall 81.9 in Overhang, Front 38.3 in Overhang, Rear w/o bumper 47.2 in Front Bumper to Back of Cab N/A Cab to Axle 60 in Cab to End of Frame 107.2 in Ground to Top of Load Floor N/A Ground to Top of Frame N/A Frame Width, Rear 34.1 in Ground Clearance, Front 8.9 in Ground Clearance, Rear 8.9 in Body Length 0.00 ft Cab to Body N/A Cargo Area Dimensions Cargo Box Width @ Top, Rear N/A Cargo Box Width @ Floor N/A Cargo Box Width @ Wheelhousings NIA Cargo Box (Area) Height N/A Tailgate Width N/A Cargo Volume N/A Ext'd Cab Cargo Volume N/A Prices, specifications, and availability are subject to change without notice, and do not include certain fees, faxes and charges that may be required by law or vary by manufacturer or region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer's input is subject to the accuracy of the input provided. Data Version: 27039, Data updated Nov 20, 2025 6:47:00 PM PST Nov 22, 2025 Page 6
Source page 43
CHROMEDATA An Autodata Solutions Brand _ehicle: [Fleet] 2026 Ford Super Duty F-350 SRW (F3F) XL 4WD Reg Cab 145" WB 60" CA ( » Complete ) Selected Model and Options MODEL CODE MODEL F3F 2026 Ford Super Duty F-350 SRW XL 4WD Reg Cab 145" WB 60" CA COLORS CODE DESCRIPTION W6 Green Gem ENGINE CODE DESCRIPTION 99N Engine: 7.3L 2V DEVCT NA PFI V8 Gas (STD) TRANSMISSION CODE DESCRIPTION 44G Transmission: TorgShift 10-Speed Automatic -inc: SelectShift, selectable drive modes: normal, tow/haul, eco, slippery roads and off-road and transmission power take-off provision (STD) OPTION PACKAGE CODE DESCRIPTION 630A Order Code 630A AXLE RATIO CODE DESCRIPTION X4M Electronic-Locking w/4.30 Axle Ratio (STD) TIRES CODE DESCRIPTION TDX Tires: LT275/70Rx18E BSW AT -inc: Spare may not be the same as road tire PRIMARY PAINT CODE DESCRIPTION W6 Green Gem Prices, specifications, and availability are subject 1o change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided. Data Version: 27039, Data updated Nov 20, 2025 6:47:00 PM PST Nov 22, 2025 Page 7
Source page 44
CHROMEDAITA An Autodata Solutions Brand vehicle: [Fleet] 2026 Ford Super Duty F-350 SRW (F3F) XL 4WD Reg Cab 145" WB 60" CA ( Complete ) SEAT TYPE CODE DESCRIPTION AS Medium Dark Slate, HD Vinyl 40/20/40 Split Bench Seat -inc: center armrest, cupholder, storage, 2-way adjustable driver/passenger headrests and driver's side manual lumbar ADDITIONAL EQUIPMENT - MECHANICAL CODE DESCRIPTION 473 Snow Plow Prep Package -inc: pre-selected springs (see order guide supplemental reference for springs/FGAWR of specific vehicle configurations), Note 1: Restrictions apply; see supplemental reference or body builders layout book for details, Note 2: Also allows for the attachment of a winch, Note 3: Highly recommended to add (86M) dual battery on 7.3L gas engine, Adding (67B) 410 amp dual alternators for diesel engine is highly recommended for max power output 52B Trailer Brake Controller 67B 410 Amp Dual Alternators -inc: 250 Amp + 160 Amp 86M Dual 68 AH/65 AGM Battery ADDITIONAL EQUIPMENT - EXTERIOR CODE DESCRIPTION 18B Platform Running Boards 512 Spare Tire & Wheel -inc: Excludes carrier, 3-Ton Mechanical Jack 59H Center High-Mounted Stop Lamp (CHMSL) 61J 3-Ton Mechanical Jack 61L Front Wheel Well Liner (Pre-Installed) 61S Front Splash Guards/Mud Flaps (Pre-Installed) ADDITIONAL EQUIPMENT - INTERIOR CODE DESCRIPTION 76C Exterior Backup Alarm (Pre-Installed) 872 Rear View Camera & Prep Kit -inc: Pre-installed content includes cab wiring and frame wiring to the rear most cross member, Upfitters kit includes camera w/mounting bracket, 20' jumper wire and camera mounting/aiming instructions Options Total Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report Preparer's input is subject to the accuracy of the input provided. Data Version: 27039, Data updated Nov 20, 2025 6:47:00 PM PST Nov 22, 2025 Page 8
Source page 45
CHROMEDATA An Autodata Solutions Brand vehicle: [Fleet] 2026 Ford Super Duty F-350 SRW (F3F) XL 4WD Reg Cab 145" WB 60" CA ( © Complete ) Standard Equipment Mechanical Engine: 7.3L 2V DEVCT NA PFI V8 Gas (STD) Transmission: TorgShift 10-Speed Automatic -inc: SelectShift, selectable drive modes: normal, tow/haul, eco, slippery roads and off-road and transmission power take-off provision (STD) Electronic-Locking w/4.30 Axle Ratio (STD) 50-State Emissions System Transmission w/Driver Selectable Mode and Oil Cooler Electronic Transfer Case Part-Time Four-Wheel Drive 68-Amp/Hr 750CCA Maintenance-Free Battery w/Run Down Protection 190 Amp Alternator 190 Amp Alternator Towing Equipment -inc: Trailer Sway Control Trailer Wiring Harness 4890# Maximum Payload GVWR: 10,900 Ib Payload Package HD Gas-Pressurized Shock Absorbers Front And Rear Anti-Roll Bars Firm Suspension Hydraulic Power-Assist Steering 40 Gal. Fuel Tank Single Stainless Steel Exhaust Auto Locking Hubs Front Suspension w/Coil Springs Solid Axle Rear Suspension w/Leaf Springs 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist and Hill Hold Control Upfitter Switches Exterior Tires: LT275/65Rx18E BSW A/S -inc: Spare may not be the same as the road tire (STD) Wheels w/Hub Covers Wheels: 18" Argent Painted Steel -inc: painted hub covers/center ornaments Black Front Bumper w/Black Rub Strip/Fascia Accent and 2 Tow Hooks Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer's input is subject to the accuracy of the input provided. Data Version: 27039, Data updated Nov 20, 2025 6:47:00 PM PST Nov 22, 2025 Page 9
Source page 46
CHROMEDATA An Autodata Solutions Brand .ehicle: [Fleet] 2026 Ford Super Duty F-350 SRW (F3F) XL 4WD Reg Cab 145" WB 60" CA ( Complete ) Exterior Entertainment Interior Black Side Windows Trim and Black Front Windshield Trim Black Door Handles Black Power Heated Side Mirrors w/Convex Spotter, Manual Folding and Turn Signal Indicator Manual Extendable Trailer Style Mirrors Fixed Rear Window Light Tinted Glass Variable Intermittent Wipers Aluminum Panels Black Grille Autolamp Auto On/Off Reflector Halogen Daytime Running Lights Preference Setting Headlamps w/Delay-Off Cab Clearance Lights Perimeter/Approach Lights Radio w/Seek-Scan, Clock, Speed Compensated Volume Control, Steering Wheel Controls, Voice Activation and External Memory Control Radio: AM/FM Stereo w/MP3 Player -inc: 4 speakers 4 Speakers Fixed Antenna 2 LCD Monitors In The Front 4-Way Driver Seat -inc: Manual Recline and Fore/Aft Movement 4-Way Passenger Seat -inc: Manual Recline and Fore/Aft Movement Manual Tilt/Telescoping Steering Column Gauges -inc: Speedometer, Odometer, Oil Pressure, Engine Coolant Temp, Tachometer, Transmission Fluid Temp, Engine Hour Meter, Trip Odometer and Trip Computer Front Cupholder Compass Remote Keyless Entry w/Integrated Key Transmitter, Illuminated Entry and Panic Button Cruise Control w/Steering Wheel Controls Manual Air Conditioning Locking Glove Box Interior Trim -inc: Chrome Interior Accents Full Cloth Headliner Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region, Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer's input is subject to the accuracy of the input provided. Data Version: 27039, Data updated Nov 20, 2025 6:47:00 PM PST Nov 22, 2025 Page 10
Source page 47
CHROMEDATA An Autodata Solutions Brand vehicle: [Fleet] 2026 Ford Super Duty F-350 SRW (F3F) XL 4WD Reg Cab 145" WB 60" CA (</ Complete ) Interior afety-Mechanical Urethane Gear Shifter Material HD Vinyl 40/20/40 Split Bench Seat -inc: center armrest, cupholder, storage, 2-way adjustable driver/passenger headrests and driver's side manual lumbar Day-Night Rearview Mirror Passenger Visor Vanity Mirror Full Overhead Console w/Storage and 2 12V DC Power Outlets Front Map Lights Fade-To-Off Interior Lighting Full Vinyl/Rubber Floor Covering Smart Device Remote Engine Start SYNC 4 Communication & Entertainment System -inc: enhanced voice recognition, 911 Assist, 8" center display, AppLink and 1 smart-charging USB port Ford Connectivity Package (1-Year Included) -inc: unlimited Wi-Fi hotspot, Included for 1-year from warranty start date, Requires activation via Ford app w/credit card authorization; customer may cancel at any time, Evolving technology/cellular networks/vehicle capability may limit functionality and prevent operation of connected features, Ford may temporarily slow data speeds if such data usage reaches or exceeds 50GB within a billing cycle or due to network limitations, If a customer uses more than 50% of their data usage in a roaming country during a 60-day period, Ford may remove or limit the customer's data plan Instrument Panel Covered Bin and Dashboard Storage Power 1st Row Windows w/Driver And Passenger 1-Touch Up/Down Delayed Accessory Power Power Door Locks w/Autolock Feature Driver Information Center Trip Computer Outside Temp Gauge Digital/Analog Appearance Seats w/Vinyl Back Material Manual Adjustable Front Head Restraints Front Center Armrest w/Storage Perimeter Alarm Securilock Anti-Theft Ignition (pats) Immobilizer 2 12V DC Power Outlets Air Filtration AdvanceTrac w/Roll Stability Control Electronic Stability Control (ESC) And Roll Stability Control (RSC) Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report Preparer’s input is subject to the accuracy of the input provided. Data Version: 27039, Data updated Nov 20, 2025 6:47:00 PM PST Nov 22, 2025 Page 11
Source page 48
CHROMEDATA An Autodata Solutions Brand vehicle: [Fleet] 2026 Ford Super Duty F-350 SRW (F3F) XL 4WD Reg Cab 145" WB 60" CA ( Complete ) Safety-Mechanical Safety-Exterior Safety-Interior WARRANTY ABS And Driveline Traction Control Side Impact Beams Dual Stage Driver And Passenger Seat-Mounted Side Airbags Pre-Collision Assist with Automatic Emergency Braking (AEB) Lane Departure Warning Collision Mitigation-Front Tire Specific Low Tire Pressure Warning Dual Stage Driver And Passenger Front Airbags w/Passenger Off Switch Safety Canopy System Curtain 1st Row Airbags Outboard Front Lap And Shoulder Safety Beits -inc: Height Adjusters Basic Years: 3 Basic Miles/km: 36,000 Drivetrain Years: 5 Drivetrain Miles/km: 60,000 Corrosion Years: 5 Corrosion Miles/km: Unlimited Roadside Assistance Years: 5 Roadside Assistance Miles/km: 60,000 Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer's input is subject fo the accuracy of the input provided. Data Version: 27039, Data updated Nov 20, 2025 6:47:00 PM PST Nov 22, 2025 Page 12
Source page 49
TOWN OF CANTON FORM B — FISCAL 2027 CAPITAL PROJECT / EQUIPMENT REQUEST DEPARTMENT: SUBMITTED BY: Sewer Enterprise / S$ Ww prise/ Spor MWat er W.WALSH PROJECT / EQUIPMENT TITLE: TOTAL PROJECT / EQUIPMENT COST: 4 VEHICLE #71 Must be at least $5,000 Any contingency should be explained below § 695,000.00 DESCRIPITION: What is the request for? Example: 4 police cruisers. What are the funding sources (if more than one)? The Vactor will replace the flush truck as the front line piece of sewer maintenance sewer line cleaning equipment. PURPOSE AND JUSTIFICATION: Why the department needs this item. If additional space is needed for justification, please add a second page. Does this further the Town’s Green Policy? Examples: We reviewed the ‘greener’ options; however, the internal combustion engines remain a requirement for patrol vehicles that must run for longer periods without the ability to charge. We do have hybrid vehicles in the fleet where the role is applicable. This versatile piece of equipment will be critical for Public Works daily operations, including: cleaning basins and oil-water separators in compliance with our MS4 permit, maintaining sewer lift stations, supporting hydro excavation operations for the water department. The Vactor 2100i will serve as a key asset, enhancing efficiency, safety, and operational capability across multiple municipal infrastructure tasks. NEED CLASSIFICATION: (Check all that apply) Department Priority Rank: : (Please rank this request out of your total requests for Required for Safety this year: #1 as top priority) Required by Law or Mandate Priority# 1 oft 3 Improve/Expand Service or Increased Efficiency Fa Expected Useful Life: Planning Classification: 10 to 19 Years Planned project or replacement (on the prior year's 5- * If not planned, please explain in justification Impact on Dept. Operating Budget: Impact to Dept. Revenue: No Impact by § 0.00 No Impact by $0.00 For motorized equipment: Was an electric or hybrid option considered? Please explain below OTHER COMMENTS OR INFORMATION: (Attach supporting documentation including quote) Not an option on this vehicle. SUBMIT
Source page 50
me \ |\ fae WOOD co., inc EES ES | MUNICIPAL AND CONTRACTORS' EQUIPMENT Tel. (781) 935 1919 200 Merrimac St QUOTE Fax [781] 937 9809 Woburn MA 01801 To: Date: Town of Canton October 24, 2025 Department of Public Works 147 Bolivar St Canton, MA 02021 ATT; Bill Walsh Operations Manager C.N. Wood Enviro LLC is pleased to offer the following Vactor budget proposal through the Sourcewell contract for your consideration. 1 New Vactor 2100I dual fan combination sewer cleaner with 12-yard hopper,1300 gallons of water tanks, dual fan, 600’ jetting hose, hydro excavation package, single engine, mounted on a Western Star dual axle 10-wheel chassis and all other standard equipment Total Selling Price... $695,000.00 NOTE: due to the current market conditions and the on-going supply chain issues pricing is subject to change. C.N. Wood Co, Inc. is looking forward to providing the Town of Canton with the premium Vactor products and first class service. Please do not hesitate to contact me if you have any questions or need further information. Best Regards, Stephen M. Russell Sales Representative No warranties are made other than those extended by the manufacturer of the equipment, and in the event of alleged breach of warranty, expressed or implied, the liability of C. N. Wood Co., Inc., shall be limited to the liability of the manufacturer to it, and shall be subject to all limitations and conditions imposed by the manufacturer. Seller shall not be liable for any default or delay in delivery, as a result of shipping delays, strikes, fires, lockouts, or inability to procure materials.
Source page 51
ENGINEERED TO PERFORM BUILT TO LAST VACTOR Subsidiary of Federal Signal Corporation
Source page 52
DMnNII RMOVUL IGINEER As a result of Vactor’s unique, trademarked Modul-Flex design, your equipment is engineered and manufactured to meet your specific and most demanding applications. Modul-Flex offers you both accuracy and flexibility, and essential operational advantages: Provides for maximum debris body and water tank capacities while ensuring optimum weight distribution on every truck Helps you meet local axle load distribution standards and safety regulations Center of gravity is calculated for each truck to ensure a safe configuration with optimal weight transfer Includes our aluminum water tanks that are warrantied for 10 years, and are customized to the right sizes, capacities, and locations to meet specific chassis requirements
Source page 53
In all Vactor equipment models you will find rugged and innovative features that deliver
the performance you need to handle your most demanding sewer cleaning tasks.
\
|
| Purpose-designed for sewer system cleaning and refined over 50 years of
proven performance, our unique high pressure water pump gives you the
\ | power to break up even the toughest blockages. The Jet Rodder pump is a
{ positive displacement, high-pressure, double acting, hydraulically operated,
_ single piston pump specifically designed for sewer cleaning operations, whose
| design allows for configurations up to 100 gpm US (378 Ipm) @ 2000 psi.
+ Creates a powerful “jackhammer” action to assist the nozzle in
| breaking up and penetrating obstructions
|
| + Run dry protection for 30 minutes certified by Vactor
\
{
|
Flow and Pressure Power Requirements Hose Size
+ Powered from the chassis engine without the need of auxiliary 40. gpm @ 2500 psi/151Ipm @ 172 bar 73hp /54kW 3/4 in or Lin /19 oF 25.4mm
engine or belt drive 6gpm @ 2000 51/227 pm e138 bar 88 np/66 KW 1in/25.4 mm
60 gpm @ 2500 psi/22? Ipm #72 bar MOhp/e2 kW 1in/25.4 mm
I! + Operates at 14 to 25 cycles per minute (typical configurations in 80 gpm @ 2000 psi/ 303 Ipm @ 138 bar eae MeL)
i . : 80.gpm@2500psi/303Ipm@172bar «46 hp/109KW 1in/25.4 mm
\ continuous duty operations) 100 gm @ 2000 psi/379Ipm@ 138bar 146 Hp/19KW 1.44 in /31.75 mm
+ The pump location provides a flooded suction inlet to eliminate
potential cavitation damage or the need for a charge pump
' + Single moving part reduces wear and tear of pump components
and maintenance costsSource page 54
‘ENHANCED OPERATOR “EXPERIENCE Quieter engine design Lower water fill point Hose reel telescopes ; High id out up to 15” and igh groun clearance rotates up to 270° for optimal positioning Patented twist lock pipe restraints »VACTOR 2100i OFFERS YOU GREATER OPERATING EASE AND EFFICIENCY a oe” ol =e Vactor’s Multiflow system lets operators set the flow at a lower rpm resulting in better fuel economy without sacrificing performance All water valves are located in the same mid-ship control station, reducing the amount of walking back and forth around the truck by the operator
Source page 55
VACTOR 2100i INTUITIVE IN EVERY WAY. NEW INTUITOUCH® ONE-TOUCH IN-CAB CONTROLS REDEFINE SIMPLICITY + 7” touch screen control features back lit tactile buttons + Includes controls and viewing screen for camera, lighting, recirculation and PTO/Transfer case activation + One-Touch engagement to activate PTO and transfer case — allowing operators to gain control of all operational systems + Operator can view the current operating mode, recirculation status, flows, pressures and more NEW INTUITOUCH CONTROL STATION PUTS ALL CLEANING SYSTEM FUNCTIONS INTO A SINGLE, SIMPLE CONTROL PANEL + Articulating controls with up/down adjustment for individualized maximum comfort — articulation allows the control panel to adjust on a 90 degree arc for better access and screen visibility while operating the hose reel and boom + All controls are consolidated into a single control panel including a 7” dashboard screen with glove-friendly tactile buttons featuring at-a- glance data for water pressure and flow, hose footage, chassis RPM, vacuum information, water level’, debris tank level* and more IntuiTouch 2-3 ° + New, reliable touch buttons with back lit feedback enable the operator to know if a selected function is active + The hose reel joystick significantly improves response time and pays in and out in the direction of the hose reel The boom joystick has a telescoping feature built in, giving the operator full mobility with multiple direction boom movement for quicker set up Operators have full control of the water system via a single Multi-Flow control dial — enabling them to precisely match the flow and pressure to the job requirements + E-stops located at all operator control points bring the unit to a safe condition to protect both the operator and the equipment
Source page 56
VACTOR 2100i COMES IN THE CONFIGURATION YOU NEED | OUR POSITIVE DISPLACEMENT (PD) | MODEL IS IDEAL FOR PULLING ; MATERIAL LONG DISTANCES With blower offerings providing inlet volumes in excess of 5000 CFM and 18 Hg vacuum, the Vactor 2100i PD is the machine you need to tackle your deepest pulls. In addition, our multi-stage » blower filtration system is the most productive of its kind, and unique design features make the 2100i the most operator friendly unit available, FOR ALL AROUND SERVICE, CHOOSE A SINGLE ENGINE, SINGLE OR DUAL STAGE FAN MODEL Vactor’s fan system is the right choice for all-around sanitary and storm sewer cleaning. Whether equipped with a single or dual (for greater vacuum) fan system, our lightweight, perfectly balanced aluminum fan provides superior performance to handle your toughest jobs. Our unique system also minimizes energy consumption while maximizing performance. CENTRIFUGAL CYCLONES Designed and located to improve air filtration and permit easier cleaning. The air enters the top side of the cyclone causing a vortex and any airborne particles to drop and be “dumped” with the rest of the load.
Source page 57
CUSTOMIZE YOUR 2100i WITH PERFORMANCE DRIVEN OPTIONS RDB 2 RAPID DEPLOYMENT BOOM Our revolutionary RDB boom telescopes 10 feet out and extends ‘the debris hose down 15 feet speeding work, and, in many cases, eliminating the need for additional tubes, reducing operator fa- tigue. The RDB 1015 offers you: + Dramatic reduction in set-up and tear-down time with boom’s ability to pay-in and pay-out 15 feet of vacuum hose + Reach greater depths without raising the position of the boom to enhance speed and efficiency + The ability to work in areas of low overhead clearance without raising the boom and still reach needed depths WIRELESS CONTROLS Vactor has enhanced its wireless controls with a belly pack and handheld remotes that feature two-way data transmis- sion, including active pressure and flow information for the water and the ability to monitor hose footage being paid out or retracted. Our wireless controls also allow: + Extensive operation with greater control away from the fixed operator station + Multiple control functions including hose reel control, boom control, e-stop and more OVER 100 PRECISION-ENGINEERED ENHANCEMENTS ARE AVAILABLE, INCLUDING: + Cold weather recirculation system + Liquid debris pump-off system + Debris flush-out system + Fail-safe hydraulic door locking system « Water tank capacity up to 1,500 gallons (5,678 L) + Pump delivery system up to 100 gpm + Hose reel capacity up to 1,000 ft. (305 m) + Automatic hose level wind guide + Safety warning lighting packages + Hydro-Excavation Kits
Source page 58
VACTOR WATER RECYCLERS CAN HELP YOU MINIMIZE COSTS AS YOU MAXIMIZE RESOURCES You can maintain and repair sewer lines and save hundreds of thousands of gallons of fresh water every year with a Vactor Water Recycler. Beyond water savings, by eliminating the need to refill water tanks, you drive up productivity, cutting time, effort, and expense. Designed to work exclusively with our 2100i Series combination sewer cleaners, our Water Recyclers offer you: + Continuous operation without stops + 5-step water filtration process combining settling, centrifugal separation, and absolute filtration to 100 microns + No need to enter the debris body for maintenance \ + No moving parts inside the debris body + Ground level access for washing coarse screen filter + Automated back flush every 30 seconds + Self-monitoring filter with low and high pressure shutdowns " ) 5-Step Water Filtration Process + Water source selection—clean water, recycled water or both 4 1. Initial Separation (inside the debris body by the deflector plates) 2. Coarse Screen Filter 3. Centrifugal Separation 4. Classification Filter 5. Final Settling
Source page 59
VACTOR SERVICE AND SUPPORT PERFORMANCE UPGRADES Your equipment represents a significant investment for your community or business. With our Performance Upgrades you can maximize the life, long-term value, versatility and performance of your equipment. Retrofit options include updates to add new safety, productivity and performance features. VACTOR REBUILD PROGRAM This comprehensive service program is designed to keep your Vactor equipment operating at top performance. Including: + An all-points vehicle inspection + Genuine OEM replacement parts + All work done by factory-trained technicians + 10% parts discount + Engineering improvements and retrofit options + Equipment testing to factory specifications OPERATOR, MAINTENANCE & SERVICE TRAINING To help you and your team get the most from all the perfor- mance features we build into our equipment Vactor offers a comprehensive training program that includes hands-on classses on operation, maintenance and service. LEARN MORE
Source page 60
2100i SPECIFICATIONS Model 2100i - FAN 2100i - PD DESIGN Exclusive Vactor Modul-Flex® Exclusive Vactor Modul-Flex® Air Mover Single or Dual Stage Hydrostatic Fan Roots / positive displacement VACUUM RATING - Up to 27 in (685 mm) Hg INLET VOLUME = Up to 5000 CFM DRIVE Chassis driven, direct drive Chassis driven, direct drive OMSI TRANSFER CASE Hydrostatic Direct driven off of chassis FULLY HYDRAULIC BOOM Proportional Boom Controls with 180° rotation Proportional Boom Controls with 180° rotation Multi-Flow system PICKUP HOSE 7 in or 8 in Diameter 7" or 8" Diameter DEBRIS BODY CAPACITY 5 cu yd - 15 cu yd (3.8 m3 - 11.5 m3) 5 cu yd - 15 cu yd (3.8 m? - 11.5 m3) WATER TANK CAPACITY 1,000 gal - 1,500 gal (3,785 L - 5,678 L) 1,000 gal - 1,500 gal (3.785 L - 5,678 L) WATER TANK CONSTRUCTION Aluminum (10-year warranty) Aluminum (10-year warranty) WATER PUMP Vactor Jet Rodder® Vactor Jet Rodder® Multi-Flow system WATER DELIVERY 60 gpm - 100 gpm at 2,000 psi - 3000 psi 60 gpm - 100 gpm at 2,000 psi - 3000 psi PUMP ACTION Continuous flow or Jack Hammer® Continuous flow or Jack Hammer® HOSE REEL 15 in Telescope, 270° rotation 800 ft x 1 in capacity (244 m x 2.5 cm) 15 in Telescope, 270° rotation 800 ft x 1 in capacity (244 m x 2.5 cm) REAR DOOR Flat, hydraulically opening with fail safe locks Flat, hydraulically opening with fail safe locks SMART TRUCK FEATURES E-stops at all operator stations Flow / footage meters Smart messages E-stops at all operator stations Flow / footage meters Smart messages HAND GUN SYSTEM CUSTOM CONFIGURATIONS Hose Reel 35 ft of hose High Pressure Washdown gun Up to 1,000 ft capacity (305 m) 35 ft of hose High Pressure Washdown gun Up to 1,000 ft capacity (305 m) Multiple Boom Options RDB 1015 10 ft Extendable Boom 10 ft Tele Boom RDB 1015 10 ft Extendable Boom 10 ft Tele Boom 5x5 Boom 5 x 5 Boom Axles Single or Tandem Single or Tandem Tri-Drive and Drop axles also available Tri-Drive and Drop axles also available Controls Wireless Belly pack Wireless Belly pack Handheld Wireless Handheld Wireless Corded Pendant Corded Pendant WATER RECYCLING AVAILABLE NO YES 10
Source page 61
OUR COMMITMENT TO QUALITY ONLY BEGINS WITH OUR EQUIPMENT The Vactor 2100i is manufactured in an ISO 9001 certified, advanced industrial plant. We employ the latest technology to build the most reliable equipment, including high-precision laser cutters, robotic welding, efficient, accurate computer numerical controls, and a sophisticated powder coating system. When you build a quality product you can back it up with a full one-year, unlimited hours warranty. Vactor also backs up your investment with superior local service and support. Our goal is to keep your machine—and your entire operation—up and running. The 2100i can be customized to your unique requirements to meet local standards and regulations by means of a broad selection of configurations, options and accessories. Through our international dealer network, we maintain a vast inventory of spare parts and offer fast shipment to any region of the world. Altogether, the rugged, reliable Vactor 2100i is easy to operate, easy to maintain, and an easy choice when you are looking for quality equipment that is built to last. 1
Source page 62
oi VACTOR BRINGING YOU THE POWER YOU NEED TO PERFORM Vactor Manufacturing, the world leader in sewer cleaning equipment, with more than 20,000 specialty vehicles sold worldwide in the last 15 years, is part of Federal Signal, a leader in integrated solutions for governments and industries worldwide. Our mission is to provide you with not only the best equipment, but the best aftermarket service and support in the industry. Together, we can offer you comprehensive operator training and a vast parts inventory to cut downtime and keep your operation up and running. VACTOR Subsidiary of Federal Signal Corporation vactor.com Vactor Manufacturing, LLC + 1621 South Illinois Street + Streator, IL 61364 USA Phone 815.672.3171 * Fax 815.672.2779 Specifications subject to change without notice. Some products shown with optional equipment. Vactor®, JetRodder®, IntuiTouch®, and ParkNClean® are registered trade- marks of Vactor Manufacturing, LLC, Products may be covered by one or more United States Patents and/or pending patent applications. See: www.vactor.conypatents. Vactor Manufacturing, Inc. is a subsidiary of Federal Signal Corp. Federal Signal Corp. is listed in the NYSE by the symbol FSS. Effective Date 05/2025 PIN 00107-6, ©2025 Vactor Manufacturing Printed in the USA
Source page 63
TOWN OF CANTON FORM B -— FISCAL 2027 CAPITAL PROJECT / EQUIPMENT REQUEST DEPARTMENT: SUBMITTED BY: Water Enterprise Michael Trotta PROJECT / EQUIPMENT TITLE: TOTAL PROJECT / EQUIPMENT COST: Must be at least $5,000): Any contingency should be explained below Process Modification at the Sullivan Water Treatment Facility (Neponset WTP) § 2,500,000.00 DESCRIPITION: What is the request for? Example: 4 police cruisers. What are the funding sources (if more than one)? Replace the ultrafiltration (UF) membrane racks at Neponset WTP with a granular media pressure system. PURPOSE AND JUSTIFICATION: Why the department needs this item. If additional space is needed for justification, please add a second page. Does this further the Town’s Green Policy? Examples: We reviewed the ‘greener’ options; however, the internal combustion engines remain a requirement for patrol vehicles that must run for longer periods without the ability to charge. We do have hybrid vehicles in the fleet where the role is applicable. Project was approved for FY 26 at then estimated cost of $4,200,000 for design and construction. Based on 90% design, estimated construction cost is $6,300,000. $4,2000,000 - $280,000 (A&E) = $3,920,000 (Build). $3,920,000 - $6,300,000 (FY27) = $2,380,000 (Build need). NEED CLASSIFICATION: (Check all that apply) Department Priority Rank: ; (Please rank this request out of your total requests for [__] Required for Safety this year: #1 as top priority) [_] Required by Law or Mandate Priority#_ 1 of # 5 Improve/Expand Service or Increased Efficiency i] Expected Useful Life: Planning Classification: 20 + Years Planned project or replacement (on the prior year's 5- * If not planned, please explain in justification Impact on Dept. Operating Budget: Impact to Dept. Revenue: Decrease by $ 1,000,000.00 No Impact by $ 0.00 For motorized equipment: Was an electric or hybrid option considered? Please explain below OTHER COMMENTS OR INFORMATION: (Attach supporting documentation including quote) SUBMIT
Source page 64
The Neponset Water Treatment Facility was designed with a membrane pressure filtration treatment process. The membrane process has been determined to be costly to operate and highly labor intensive. The facility has not been able to meet its design capacity for several years due to failing or inoperative process components, while certain other process components have reached the end of their useful lives. This includes numerous pipes and valves, and the computer software and hardware critical to the operation of the facility. We have determined that for these reasons, the existing membrane treatment process is no longer the appropriate technology to treat the Towns water at this location. We have been working with our consulting engineers to develop plans to restore the capacity lost due to the failing and inoperative components. The recommended action is to remove the membrane treatment process and replace it with granular media pressure filtration, which is the process in use at the Pecunit WTF. The new process components will fit within the footprint of the existing system and will not require expansion of the existing building. This will provide an opportunity to simplify the treatment process, replace aging and failed components, and provide a consistent treatment process across our system. Engineer’s Estimate of Probably Construction Cost: $6,300,000.00
Source page 65
Ison Engineering, Inc DRINKING WATER PROFESSIONALS November 3, 2025 Mr. Michael Trotta, Superintendent Department of Public Works 801 Washington Street Canton, MA 02021 RE: Neponset Street WTP Treatment Facility Modifications Dear Mr. Trotta: At your request, we have reviewed the project scope and developed an updated engineers estimate of probable cost, which is based on the 90-percent design of the proposed upgrades. Based on the experience of H2Olson and a third-party review of the design plans, our revised Estimate for construction and construction administration as of October 2025 is $6.3 million. We greatly appreciate the opportunity to provide you with this proposal and look forward to continuing to work with you and the Town of Canton on this important project. If you have any questions, please feel free to contact me at (508) 965-2037 or via e-mail at pgn@h2olsonengineering.com. Very Truly Yours, H2Olson Engineering, Inc. Peter Newton, PG Principal Hydrogeologist 10 Riverside Drive, Suite 103 Tel: 508-375-7007 Lakeville, MA 02347 www.h2olsonengineering.com
Source page 66
TOWN OF CANTON FORM B — FISCAL 2027 CAPITAL PROJECT / EQUIPMENT REQUEST DEPARTMENT: SUBMITTED BY: Water Enterprise . Michael Trotta PROJECT / EQUIPMENT TITLE: TOTAL PROJECT / EQUIPMENT COST: Must be at least $5,000): Any contingency should be explained below Lead Service Line (LSL) Inventory and Replacement Planning - Phase II § 2,250,000.00 DESCRIPITION: What is the request for? Example: 4 police cruisers. What are the funding sources (if more than one)? Continue efforts to indentify public side and customer side water service types. The effort will include excavation at water service valves, continued public outreach notifications including web based updates of inventory of service types and GIS maps. PURPOSE AND JUSTIFICATION: Why the department needs this item. If additional space is needed for justification, please add a second page. Does this further the Town’s Green Policy? Examples: We reviewed the ‘greener’ options; however, the internal combustion engines remain a requirement for patrol vehicles that must run for longer periods without the ability to charge. We do have hybrid vehicles in the fleet where the role is applicable. The U.S, EPA through MassDEP has revived the 1974 Safe Drinking Water Act Lead and Copper Rule (LCRR). This LCRR requires Canton to inventory and document the material of both Town side and Customer side service line types. Phase | was completed, the report was filed with MassDEP. Phase II requires validation of inventory with on site inspections, inspection results and replacement plan are due November 2027. NEED CLASSIFICATION: (Check all that apply) Department Priority Rank: ; (Please rank this request out of your total requests for [_] Required for Safety this year: #1 as top priority) Required by Law or Mandate Priority # 2 of # 5 CL] Improve/Expand Service or Increased Efficiency Expected Useful Life: Planning Classification: 20 + Years Planned project or replacement (on the prior year's 5- * If not planned, please explain in justification Impact on Dept. Operating Budget: Impact to Dept. Revenue: No Impact by § 0.00 No Impact by $ 0.00 For motorized equipment: Was an electric or hybrid option considered? Please explain below OTHER COMMENTS OR INFORMATION: (Attach supporting documentation including quote) MWRA 10 year no interest loan is available to fund the work. SUBMIT
Source page 67
~~ KLEINFELDEFR Bright People. Right Solutions. ws October 31°, 2025 Kleinfelder Project No.: 24004138.001A Mr. Michael Trotta Superintendent of Public Works Town of Canton 801 Washington Street Canton, MA 02021 SUBJECT: Lead and Copper Rule Compliance Support for FY 2027 Opinion of Probable Engineering Cost for Capital Request Dear Mr. Trotta: Kleinfelder has been supporting the Town of Canton (hereinafter called the “Town”) meet the compliance requirements of both the Lead and Copper Rule Revisions (LCRR) and Lead and Copper Rule Improvements (LCRI) under a Professional Services Agreement made effective on January 1%, 2024. The first phase of the Program ensured that the Town would meet the compliance requirements of the October of 2024 deadline associated with the LCRR. This consisted of the following: © Grant Application o Prepared and submitted a DWSRF Planning Grant Application to secure funding for the Service Line Inventory (SLI) and subsequent tasks. e Data Compilation & Preliminary Screening o Conducted a desktop review of historical and current records to assess service line material data availability and quality. o Identified data gaps and proposed a strategy for inventory development e Inventory Development & GIS Mapping o Created a detailed inventory of service line materials using OCR, manual transcription, customer surveys, predictive modeling, and on-site inspections. o Developed a GIS map linked to the inventory database, including parcel data and service line locations. o Ensured compatibility with MassDEP reporting requirements and submitted the inventory before the October 16, 2024 deadline. e Lead Service Line Replacement Plan & Sampling Plan Update o Drafted a preliminary replacement plan outlining strategies for addressing unknown service lines, annual updates, public notifications, and prioritization of replacements. o Updated the sampling plan to align with new LCRR requirements and inventory findings. e Public Outreach o Developed FAQs and educational flyers for homeowners. o Materials for on-site inspection notifications. o Supported communication efforts via mail, website, and social media. Page 1 of 3 KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p|617.497.7800 f| 617.498.4630
Source page 68
SCOPE OF LEAD AND COPPER RULE COMPLIANCE SUPPORT ~ PHASE 2 The next phase of compliance support for the Town is centered on proactive planning and early execution with the goal to minimize future regulatory burdens and streamline compliance with the Lead and Copper Rule Improvements (LCRI). We aim to significantly reduce the quantity of ongoing annual notifications, reduce the risk of tap sampling exceedances, and avoid costly administrative requirements by completing the tasks identified in Table 1 below to ensure that the Town’s only remaining obligations under the LCRI will be limited to Lead Sampling at Schools and Childcare Facilities, Validation of Non- Lead Services, and the targeted replacement of known Lead and Galvanized Requiring Replacement (GRR) Service Lines beginning on November 1°, 2027. This forward-thinking plan positions the Town to meet all federal and state requirements efficiently while protecting public health and maintaining transparency with residents. Asummary of the work being proposed as part of Phase 2 is presented in Table 1 below. Table 1: Summary of Phase 2 Lead and Copper Rule Compliance Support Task Description Predictive Modeling-Driven Inspections | Includes a combination of Basement/Private Side and Vacuum Excavations at the valve/Public Side, on-site, visual inspections, at a limited number of targeted properties, and coordination with MassDEP for approval of this approach. Inventory & GIS Map Updates Includes updates associated with the Town’s inventory and Public-Facing GIS Map, as well as accompanying submissions and Certifications to MassDEP. Public Outreach Assistance Includes Social Media and Website Content, Annual Public Outreach Assistance for Consumer Notices, a Lead Action Levels Exceedance Notification, Consumer Confidence Report Content, Field Inspection Targeted Public Outreach, and Disturbance Notifications. Lead Service Line Replacement Plan Includes updates to the Initial Plan Summary Form that and Sampling Plan Updates was submitted to MassDEP that specifies the replacement goals and procedures and an updated Sampling Plan that includes updated locations and collection procedure requirements, Schools and Licensed Child Care Includes development of a list of Schools and Licensed Facilities Database CCF’s that is to be submitted to MassDEP by November Ast, 2027 as well as development of the backend database that will track required Public Outreach and Sampling results. Replacement Design and MWRA Loan Includes development and submission of both a planning Application and construction loan application on behalf of the Town to MWRA focused on the aforementioned Tasks and Design, respectively. Design will include development of 30% Plans, Specifications, and Cost Estimate associated with replacement. Page 2 of 3 KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p| 617.497.7800 f| 617.498.4630
Source page 69
Hl
CAPITAL BUDGET ESTIMATE
We have developed the following Engineer’s opinion of probable engineering costs for Phase 2 Lead and
Copper Rule Compliance Support for FY27 based on similarly scoped work. A 10% contingency is
included. We have assumed a project duration from July 1%t, 2026 through November 1°, 2027.
Item Opinion of Probable Engineering Cost
Predictive Modeling-Driven Inspections $1,700,000
Inventory & GIS Map Updates $30,000
Public Outreach Assistance $130,000
Lead Service Line Replacement Plan $60,000
and Sampling Plan Updates
Schools and Licensed Child Care Facilities $15,000
Database
Replacement Design and MWRA Loan Application $85,000
Subtotal $2,020,000
10% Contingency $202,000
Total $2,222,000
If you have any questions or need additional information, please don’t hesitate to contact us.
Sincerely,
KLEINFELDER
Mia Nbr
Ajay Sharma Kirsten Ryan, PG
Senior Professional Senior Project Manager
ce: File
Page 3 of 3
KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p| 617.497.7800 f| 617.498.4630Source page 70
(nr \ APPENDIX A — DRAFT 2024 Scope of Services for Ki LEINFELDER Lead Service Line Inventory & Replacement Plan Bright People. Right Solutions. we November 1, 2023 Mr. Michael Trotta Director of Public Works Town of Canton 801 Washington Street Canton, MA 02021 RE: Capital Request Fy25 — Lead Service Line Inventory & Replacement Planning / Lead & Copper Rule Revisions Compliance Assistance Canton, Massachusetts Dear Mr. Trotta: As we recently discussed, we have prepared this Scope and Fee in support of your FY25 Capital Request for consulting services in support of Lead and Copper Rule Revision compliance for Canton. BACKGROUND In 1991 the United States Environmental Protection Agency promulgated regulations known as the Lead and Copper Rule (LCR) under the authority of the 1974 Safe Drinking Water Act. The LCR helps protect public health by regulating water suppliers on how to treat and control for lead. Lead and Copper Rule revisions (LCRR), finalized in 2021, significantly increases the administrative and compliance responsibilities for Public Water Systems (PWS), as described below. It should also be noted that the EPA is additionally undertaking Lead and Copper Rule Improvements (LCRI) rulemaking, expected to be announced in November 2023, which could further increase the compliance requirements: By no later than October 16, 2024: e LSL Inventory - Complete, and submit to MassDEP, an inventory (material and verification method) of service lines connected to its distribution system, whether or not they are owned or controlled by the water system (public-side from main to corporation stop and private-side from corp to meter). o Note that the inventory may contain service lines classified as ‘Unknown’ material, although these are treated as lead for compliance and notification. e Public Notice - Make the Lead Service Line Inventory (LSLI) available to the public and notify customers who have lead service lines , galvanized downstream of lead (‘galvanized requiring replacement or GRR’) or lines of unknown material. e LSL Replacement Plan - Submit a plan to MassDEP detailing how the PWS will prioritize, fund, and fully remove any identified LSLs or GRRs connected to its distribution system. e Modified Lead Tap Sampling Plan — Modify current Sampling Plan based on results of inventory. Page 1 of 2 KLEINFELDER 1 Beacon Street Suite 8100, Boston MA 02108 p | 617.497.7800 f | 617.498.4630
Source page 71
Michael Trotta Director of Public Works Town of Canton November 1, 2023 Beginning in 2025, the LCRR further requires the following compliance activities: e Updating the Lead Service Line Inventory annually, so that services of unknown material are classified o Based a preliminary review of Canton’s records, we anticipate that it probably will not be possible to fully classify all unknowns by October 2024. ¢ Publishing the LSLI annually to customers e Water Testing at K-8 and Licensed Childcare Facilities o Ataminimum, test (or document good faith effort of attempting to test) 20% of facilities per year starting in 2025 The Town of Canton water system currently has approximately 8,800 accounts and 7,300 service connections and dates back to the 1890’s. The Town has replaced lead pipe when encountered during the course of operations, and Water Division personnel are not currently aware of the presence of any LSLs. However, lead goosenecks connecting to older steel pipe are suspected to remain. A very preliminary review of the 7,298 water service tie cards provided by Canton indicate a wide variation in the quality and availability of service line material information. The LCRR-required inventory will need to document the material of both the Town-owned and customer-side service lines, as well as the presence of goosenecks and any galvanized pipe that may have been installed downstream, as the LCRR will require a plan to remove any LSLs or galvanized downstream. In June 2022, the Massachusetts Clean Water Trust and MassDEP announced a new financial assistance program for funding the preparation of LSL Inventories and Replacement Plans. The program will consist of a 100% grant (no matching required). Applications began being accepted on a first-come first-served basis beginning July 1, 2022. To date, Kleinfelder has prepared successful applications for 8 Massachusetts communities totaling over $1.8M. Our LCR Program team is working for small towns like Ayer and Millis, MA and for larger cities like Somerville, Cambridge, and San Diego (CA). Kleinfelder will assist Canton with preparing a SRF Grant Application to fund the Scope of Services for the Inventory and Replacement Plan. A proposed Draft 2024 Inventory Scope of Services is provided in Appendix A.. We expect that the Town will be able to receive the full grant funding for the initial Inventory which is anticipated to cost on the order of $200,000. The grant funding would likely become available as early as end of December. PROPOSED FY25 CAPITAL REQUEST This section presents the anticipated LCRR compliance tasks which must be undertaken beginning in FY25, and order of magnitude budget for planning purposes. The scope and budget will be refined in Fall 2024 after the Lead Service Inventory work (Appendix A) is completed: Page 2 of 9 KLEINFELDER 1 Beacon Street Suite 8100, Boston MA 02108 p | 617.497.7800 f | 617.498.4630
Source page 72
Michael Trotta Director of Public Works Town of Canton November 1, 2023 Childcare Facility sampling (required to sample both public and private facilities built before 2014; 5 sites per school, 2 per CC) *Ht's possible but currently unclear if there could be funding from DEP to defray costs for this task LGRR Requirement =| Recommended —_| Tasks/ Notes i BudgetRange oe LSL Inventory & Mapping | $100,000 - Continue to populate data for service lines of Update (required $125,000 Unknown material (via visual inspection annually) and/or other methods described in Appendix A Task 2) following the 2024 initial inventory grant project (Appendix A) School & Licensed $47,000* Required to sample / attempt to sample 20% of facilities per year starting in 2025. From an equity and efficiency perspective, it is probably best to do all in the first year. This assumes ~$1000 per facility including lab; coordination, data, reporting According to the Dept. of Early Education and Care (EEC) website, the Town has 33 licensed child care programs. According to the DESE website, the Town has 14 schools (includes all grades). Required to sample both public and private; 5 sites per school, 2 per CC. Note: the LCRR only requires testing of K-8 schools, and secondary schools only upon request. We assumed all 14 for this budget to be conservative / inclusive. LCR Compliance Site Sampling Assistance $20-000- $25,000 LCRR requires 5" liter and likely new sites based on inventory results. This assumes consulting support for sampling training / outreach / reporting “Disturbance” Public outreach / Reporting assistance & mitigation $12,500 - $17,500 Assist with notifications to customers per various LCRR Public Notification requirements for disturbance of an LSL, potential LSL, or unknown material SL (e.g resulting from service replacements). Provide required pitcher filters and replacement filters to customer (assume $50 per customer for supplies & up to 50 customers) Total recommended budget range $179,500 — 214,500 KLEINFELDER Page 3 of 9 1 Beacon Street Suite 8100, Boston MA 02108 p | 617.497.7800 f | 617.498.4630
Source page 73
Michael Trotta Director of Public Works Town of Canton November 1, 2023 We hope this information is of assistance to the Town. If you have any questions regarding it, please feel free to contact me by e-mail at kryan@kleinfelder.com or call me at (617) 498-4778. Sincerely, KLEINFELDER Kiar © yr Kirsten N. Ryan Program Manager Ce: file Page 4 of 9 KLEINFELDER 1 Beacon Street Suite 8100, Boston MA 02108 p | 617.497.7800 f | 617.498.4630
Source page 74
APPENDIX A — DRAFT 2024 Scope of Services, Lead Service Line Inventory & Replacement Plan Kleinfelder proposes to perform the following tasks to help Canton Water Department meet the compliance requirements of the October 2024 deadline of the LCRR: Task 0: Grant Application Prepare an DWSRF Planning Grant Application for obtaining funding for the Lead Service Line (LSL) Inventory. Task 1: Data & Records Preliminary Screening Kleinfelder will perform data compilation and screening to determine the availability, type, and quality of information for LSL inventory development and to confirm the appropriate method(s) for completing an LSL inventory and replacement plan. Task 14 will include approximately 80 hours labor for a desktop review of available data relating to service line material which may include review of these types and sources of information, as available: e Water system records such as: GIS database (water main diameter, material; fire hydrant data), historic maps, tie card database, meter install / replacement records, historical CIP or master plans, and SOPs, construction specifications « Water billing information (meter size, service line size, material) e Existing historical or verified public and private service material records (if available) e Information used to develop pool of existing LCR sampling sites. e« Documentation of service line materials including construction & plumbing codes and permits. e Assessor's Database /Parcel or Structure data « Parcel ID, Address, Year Built e Acreage or Lot Size e Property Class or Zoning e Recent surveys « Construction records (especially service line replacements, plumbing work, renovations, or new construction) e« School and Childcare facilities e Inspections and records of the distribution system. Interviews with system personnel. Paper records will be scanned to PDF format. A preliminary excel database will be prepared, which will be consistent with the template provided by MassDEP. A summary of data gaps will be developed, and an approach for filling in inventory gaps (classifying unknowns) within the budget limits will be presented in a technical memorandum. Deliverable — Preliminary Excel database and Technical Memo describing status of data sources, identifying data gaps and presenting a recommended approach for inventory development in Task 2. Task 2: Inventory Development & GIS Map Page 5 of 9 KLEINFELDER 1 Beacon Street Suite 8100, Boston MA 02108 p | 617.497.7800 f| 617.498.4630
Source page 75
APPENDIX A — DRAFT 2024 Scope of Services, Lead Service Line Inventory & Replacement Plan Based on the information and approach developed in Task 1, inventory development will be performed, and a GIS map developed. Inventory will likely include several of the following types of activities, as recommended and appropriate to the findings of Task 1: e Population of material data from PDF scans using optical character recognition (OCR). e Visual scanning of written records (e.g tie cards, meter installation records, record plans, property records) and population of material data using manual transcription. e Predictive analytic statistical modeling using available data and methodologies consistent with Association of State Drinking Water Administrators (ASDWA) framework guidance’ to assign a material likelihood to parcels with Unknown SL materials. It is anticipated that if recommended, modeling will be performed by BlueConduit (https://blueconduit.com) under subagreement to Kleinfelder. e Implementation of a customer-driven survey similar to EPA’s “Protect Your Tap” scratch/magnet test. This would utilize either ESRI Lead Service Line Inventory App or Mass-DEP provided application. e On-site visual inspections, which are expected to include a combination of basement inspection and vacuum excavation in street at a limited number of targeted properties. These properties would be representative but random to avoid data bias and enable the creation of a statistical/predictive model. This Task has budgeted approximately 160 hours of Kleinfelder labor, along with DBE subconsultant time for records review, data science, and for vacuum excavation (assume one round of approximately 30 test pits). Deliverable —GIS Map and excel database with public and private service line material classified into known and unknown materials. Database will be in digital format specified by MassDEP. Task 3: Lead Service Line Replacement Plan Development and Sampling Plan Update A -LSL Replacement Plan: Based on the results of Tasks 1 and 2, and upon discussions with water system stakeholders, a Service Line Replacement Plan will be prepared. The Plan framework will be designed to be consistent with LCRR anticipated final requirements, by including the following sections: 1) Inventory: o A strategy for determining unknown service line material for remaining unknowns unable to be classified within the budget for Tasks 1 and 2. o Procedures for updating the LSL Inventory annually and for providing public notice annually of the full inventory and individual homes with LSL or ‘unknown’ status. 2) Replacement Goal and Procedures: o LSL replacement goal rate if the trigger level is exceeded. o Flushing procedures and standard operating procedures for disturbances. o Procedures for conducting LSL replacements. Principles of Data Science for Lead Service Line Inventories and Replacement Programs, September 2020, ASDWA & Blue Conduit Page 6 of 9 KLEINFELDER 1 Beacon Street Suite 8100, Boston MA 02108 p | 617.497.7800 f | 617.498.4630
Source page 76
APPENDIX A — DRAFT 2024 Scope of Services, Lead Service Line Inventory & Replacement Plan 3) Funding: Strategies for program funding including ways to accommodate customers that are unable to pay for private-side LSL replacement. Recommended updates to the Town’s capital improvement plan, as appropriate. 4) Communication: Strategies and procedure for meeting LCRR requirements. B - Sampling Plan Update: The number of sampling sites under the LCRR has not changed, but the locations and sampling techniques will change under the LCRR requirements and based on the LSL Inventory. The existing Plan will be updated to be consistent with new LCRR sampling site and collection procedure requirements. Task 3 will include up to two (2) meetings with water system managers and other stakeholders to discuss and document consensus on the Plan policies and procedures. This Task assumes up to about 190 hours of labor. The detailed development of policies and ordinances are outside the scope of this Phase 1 effort. Recommendations will be made for further Plan development in Phase 2, if warranted. Deliverable — Draft and Final Preliminary LSL Replacement Plan; Updated Sampling Plan Task 4: Public Outreach Assistance This task will include the development of a Public Outreach Plan Framework and include preparation of initial messaging educating homeowners about lead in drinking water and the utility’s plans for lead service inventory activities. Kleinfelder will meet with the DPW Director, Water Superintendent and Town Administrator, Public Health Director to review the Public Outreach Plan Framework, which is proposed to include: 1) Beginning of the project: Prepare an electronic Frequently Asked Questions flyer (assume up to 2 pages) for Town to mail to water customers, add to website and promote on social media. 2) Develop a Flyer that describes the on-site inspections for the Town to distribute by mail to the property owners and tenants targeted for inspection and to post on their website. 3) At completion of Inventory and Draft Replacement Plan: One public meeting presentation to the Select Board. This Task has been budgeted to include up to 100 hours of support. Additional activities may be recommended to be funded separately, depending on the outcome of Tasks 1- 3 and the stakeholder meetings. Deliverables: Public Outreach Framework, electronic materials for items 4.1 through 4.3. Task 5: Project Management and SRF Administration Support This Task will include project administration, MBE/WBE/DBE contractor coordination and assistance with State Revolving Fund reporting and reimbursement requirements, as well as Project Management including workplan, staffing and schedule management. This Task assumes up to approximately 65 hours of support. Deliverables: Monthly emailed project summaries; up to 4 SRF reimbursement request(s). Page 7 of 9 KLEINFELDER 1 Beacon Street Suite 8100, Boston MA 02108 p | 617.497.7800 | 617.498.4630
Source page 77
APPENDIX A — DRAFT 2024 Scope of Services, Lead Service Line Inventory & Replacement Plan EXCLUSIONS, LIMITATIONS, ASSUMPTIONS e Note that MassDEP is in the process of preparing revised lead regulations and if those regulations are in conflict with this Scope, a discussion about potential need to amend the scope (and fee) will be held with Canton and Kleinfelder. e Items not specifically identified in the Scope above are excluded. e Town will be responsible for the following costs: mailing of Outreach materials, fees for road opening permits, if required and police details, if required. For on-site inspection activities in Task 2, the Town DPW will provide an operations staff to accompany the field crew with a Town vehicle in case of resident questions / for safety. TASK HOURS LABOR BUDGET EXPENSES & SUB- | TOTAL CONSULTANTS BUDGET 1 - Data Compilation & Screening 2 - Inventory & GIS Map 3 - Preliminary Replacement Plan 4 - Public Outreach 5- PM & SRF Admin TOTALS SCHEDULE Kleinfelder will begin work within two weeks of receipt of a signed Agreement and written Notice to Proceed and shall use its best efforts to perform all services under this Agreement as expeditiously as is consistent with professional skill and care and the orderly progress of the work. Note that this schedule depends in part upon the Town being available for consultation and providing information to Kleinfelder in a timely manner. The proposed project schedule is expected to be of 11 months duration, as shown below: Page 8 of 9 KLEINFELDER 1 Beacon Street Suite 8100, Boston MA 02108 p | 617.497.7800 f | 617.498.4630
Source page 78
APPENDIX A — DRAFT 2024 Scope of Services, Lead Service Line Inventory & Replacement Plan Duration TASK Start (Approx.} End 1 - Data Compilation & Screening 111/24 2 months 3/1/2024 2 - Inventory & GIS Map 3/1/24 5 months 8/1/2024 3 - Replacement Plan 5/1/24 3 months 8/1/2024 4 - Public Outreach 2/1/24 7 months 9/1/2024 5- PM & SRF Admin 1/1/24 11 months 10/1/2024 Page 9 of 9 KLEINFELDER 1 Beacon Street Suite 8100, Boston MA 02108 p | 617.497.7800 f | 617.498.4630
Source page 79
TOWN OF CANTON FORM B — FISCAL 2027 CAPITAL PROJECT / EQUIPMENT REQUEST DEPARTMENT: SUBMITTED BY: Water Enterprise . Michael Trotta PROJECT / EQUIPMENT TITLE: TOTAL PROJECT / EQUIPMENT COST: (Must be at least $5,000): Any contingency should be explained below Satellite Well at Moran Water Treatment Facility (PWTP) - Phase II Construction $ 450,000.00 DESCRIPITION: What is the request for? Example: 4 police cruisers. What are the funding sources (if more than one)? Installation and construction administration for the replacement of failing Well 14 at PWTP. PURPOSE AND JUSTIFICATION: Why the department needs this item. If additional space is needed for justification, please add a second page. Does this further the Town’s Green Policy? Examples: We reviewed the ‘greener’ options; however, the internal combustion engines remain a requirement for patrol vehicles that must run for longer periods without the ability to charge. We do have hybrid vehicles in the fleet where the role is applicable. Boring done under Phase | confirmed the suitability of the soils for the Satellite Well. Water quality testing found water consistent with that of Well 11 and Well 12. Phase | investigation confirms the viability of the installation of a satellite well. NEED CLASSIFICATION: (Check all that apply) Department Priority Rank: (Please rank this request out of your total requests for this year: #1 as top priority) LC] Required for Safety [| Required by Law or Mandate Priority #3 of #_5 Improve/Expand Service or Increased Efficiency Expected Useful Life: Planning Classification: 20 + Years Planned project or replacement (on the prior year's 5- * If not planned, please explain in justification Impact on Dept. Operating Budget: Impact to Dept. Revenue: No Impact by $ 9.00 No Impact by $ 0.00 For motorized equipment: Was an electric or hybrid option considered? Please explain below OTHER COMMENTS OR INFORMATION: (Attach supporting documentation including quote) Project was approved at ATM 2025. SUBMIT
Source page 80
Pecunit Well No. 14 was installed in 2009 during the construction of the Pecunit greensand iron and manganese removal facility. The intention of the additional well at this location was to supplement supply to ensure the water treatment facility had adequate process water. Unfortunately, the well was sited close to wetlands and suffers from extremely high iron. The well has been cleaned and redeveloped numerous times over the past 15 years and its capacity has steadily declined to the point that it is no longer cost-effective to operate. We are proposing to replace Well No. 14 at a location more distant from the wetlands, in the same general area as the existing Well Nos. 11 and 12, which continue to provide excellent yields. A preliminary boring was installed in the spring of 2025 and confirmed the suitability of the soils, and preliminary water quality testing demonstrates that the water is consistent with that from Well Nos. 11 and 12. Our estimate for construction cost is $375,000 for construction and $75,000 for engineering services