SIX-YEAR PLAN FY2026 5-Year 6-Year
Boginning with Fiscal Year 2026 and ending with 2031 VoTeD Fv2027 | ev2028 | Fy2029 | Fy2030 | Fvz031 | rora._| [_ryz032 | TOTAL,
(000's omitted}
Comprehensive Water Resource Management Plan (Water Component) s 0 i)
Replaced 6" water main with 8" water main on Revere Court D UL) t)
Replace Neponset S. Water Treatment Facility - Replace Filtration Unit D 2,500 2,500 2,600
Satellite Well - Moran Treatment Facility - Design 8 125 450 450 450
MWRA Dedham St Valve - Repurpose Control Valve D 0 )
TOTAL - WATER IMPROVEMENT PROJECTS | 4,625 | [5,200] 3,538] 3,266] 3,395] 2,600] [ 17,888] [ 2,500] [ 20,388 |
VEHICLES
Pickup - flatbed 2021 Ford F350 #7 $s i} 0
Automobile 2020 Ford Hybrid Escape #12 s 65 65 65
Pickup 2022 Ford F350 #9 s 9 0
Pickup 2023 Ford F350 #72 s {) Q
Machine 2025 Cat 305 mini #39 s 0 0
Dump 2010 International 7400 #20 D 270 270 270
Utility 4x4 2022 Ford F550 #31 s yi 0 0
Utility 4x4 2008 Ford F550 #34 s 90 90 90
Utility 4x4 2009 Ford F250 #4 Ss 72 72 72
Dump 2012 Ford F550 # 87 s 90 90 90
Truck 2016 Freightliner Truck #91 s 0 0
TOTAL- VEHICLES | | o| [zz] 90] 90] 335] o| | __ss7| | o| [587]
EQUIPMENT
Loader 2021 Cat 938h #27 D 220 220 220
Backhoe/Loader 2014 Cat 420 #29 $s 160 160 160
Backhoe 2021 JCB Hydrodig #32 $s 0 )
Compressor 2023 Doosan #38 s O) 0
Tamper Wacker 4986 Tamper Wacker 0 0
Compressor 1995 Sul,Air Comp #56 66 0 0
Generator 89 Homelite Generator 27 LY) 0
Loader 92 Mich Loader L50 32 Q 0
Compressor 2002 Atlas compressor #56 66 0 0
Trailer 2017 Cross trailer #74 0 0
Trailer 2017 Cross trailer #75 J 0
Hotbox trailer KM Hotbox trailer #65 s YJ 0
Mixer 2012 MQ Cement Mixer #66 0 0
Skidloader 2018 AVS Skidsteer #67 s 65 65 65 130
Backhoe/Loader 2008 Cat 420eit #69 s 160 160 160
Dump- sander Freightliner #88 s 297 297 297
Excavator 2015 CAT 303 Mini #46 s 80 i) 0
Trailer 2024 Maxx-D Tilt Trailer #710 s 15 i) 0
Cargo Trailer 2021 Enclosed Cargo Trailer #T8 Ss 0 }
Cat 27 Loader Attachments - Forks & Booms s 0 0
Equipment Replacements 0 0
One Ton Roller 2013 Wacker #63 s 0 0
0 i)
[ TOTAL- EQUIPMENT L_ 95] [207] 160] 380] of 65} [soz] | 6s] | 967 |
BUILDING & GROUNDS REPAIRSIMPROVEMENTS.
Fire Station / DPW Compiex D 0 12,500 12,500
0 0
[ ToTAL- BUILDINGS, ETC | o} | al o| o] of o| | o| [12,500] | 12,800
TECHNOLOGY
SCADA Upgrade s 0 !)
Asset Management Software Ss 36 0 i)
Meter Replacements s 360 320 320 1,000 1,000
TOTAL- TECHNOLOGY [35] | o| 360{ 320] 320] o} | 1,000] | o| [1,000 |
SPACE NEEDS
Fire Station / DPW Complex bd | l | l l [ | } | 0} [8,333] [8,333 |
TOTAL - SPACE NEEDS. ] | [ o| o| ol o| o} [ o| [8,333] [ 3,333 |
| WATER ENTERPRISE ACCOUNT | po | 4,755 | [sso] 4,148] 4,045] 4,050] 2,565] [ 20,377] [23.308] | 43,775]
{usrdsks\user$\rscollins\Budget\FY 27 Budget\Capital\FORM A - FISCAL 2027 CPC.XLSX6-YEAR PLAN FORM A MUNICIPAL
a4
12/30/2025 8:06 AMSource page 202
FORMA
TOWN OF CANTON
CAPITAL PLANNING COMMITTEE
SIX-YEAR PLAN FY2026 5-Year 6-Year
Beginning with Fiscal Year 2026 and ending with 2031 VOTED Fy2007 | Fv2028 | Fy2029 | Fy2030 | Fyz031 | torac_| [_Fv2032 | TOTAL
(000's omitted)
WATER ENTERPRISE ACCOUNT SUMMARY - FUNDING
SURPLUS REVENUE s 255 819 610 570 385 65 2,449 65 2,514
DEBT D 4,500 4,750 | 3,538 | 3,475 | 3,665 | 2,500 17,928 23,333 41,261
TOTAL - WATER ENTERPRISE ACCOUNT - FUNDING [4.758 | | 5,569 | 4,148 | 4,045 | 4,050 | 2,565 | [ 20,377 | | 23,398 ] | 43,775 |
SEWER ENTERPRISE FUND
SEWER IMPROVEMENT PROJECTS
Year 0 - FY 24 Infiltration - Inflow Project D 0 (')}
Year 1 - FY 25 Sewer System Capital Improvement Plan D 0 0
Year 2 - FY 26 Infiltration - Inflow Project D 2,300 0 0
Year 3 - FY 27 Infiltration - Inflow Project D 1,800 1,800 1,800
Year 4 - FY 28 Infiltration - Inflow Project D 2,000 2,000 2,000
Year 5 - FY 29 Infiltration - Inflow Project D 1,800 1,800 1,800
Sewer System Extension - Palmer Street Area - A&E D 580 580 580
Sewer System Extension - Palmer Street Area - Construction D 0 5,500 5,500
Sewer System Extension - Grand Street D 0 700 700
Sewer System Extension - Wayside Lane D 0 4,800 4,800
Sewer System Extension - Green Lodge Street D [} 0 0
Sewer System Extension - Ledgewood Drive D 0 5,600 5,600
Sewer System Extension - York Street D 0 4,100 4,100
Sewer System Extension - Westdale Road D 0 1,500 1,500
Sewer System Extension - Glen Echo Pond - A&E D 0 2,100 2,100
Sewer System Extension - Glen Echo Pond - Construction D t) 12,500 12,500
Comprehensive Water Resource Management Plan (Sewer Component) s () 0
Pump Station Replacement D 120 600 100 500 1,320 900 2,220
s ) Y)
TOTAL - SEWER IMPROVEMENT PROJECTS ] [2,300 | [ o| 1,920[ 2,600] 1,900] 1,080] [ 7,500] [37,700] | 45,200 |
VEHICLES
Utility 4x4 2008 Ford F550 #36 Ss 90 90 90
Utility 4x4 2022 Ford F550 #45 Ss 0 0
Skidsteer 2024 Kubota skidsteer #61 s 0 0
Utility 4x4 2011 Ford F350 #8 s 102 85 187 187
Street Sweeper 2025 Elegin Sweeper #35 s 0 0
Dump Sander Westernstar #19 s 0 0
[__ToTAL- VEHICLES [ o| L102] of] so] as] o} | _277| | o| | 277]
EQUIPMENT
Flush Truck (sewer/stormwater} 2008 International 7300 #71 D 348 348 348
TV Truck 2001 Cues #73 Ss 200 200 200
Dump 2017 Ford F550 #80 s 120 120 120
Sewer Pump Station Generator - Forest Avenue Ss t) 0
Pickup 2012 Ford F350 #84 Ss 0 0
Skidsteer 2024 Kubota Skidsteer #74 Ss 0 0
Tilt Deck Trailer 2026 Maxx-D trailer #711 Ss 0 0
TOTAL- EQUIPMENT | o| [ 348] o| 200] 120] o] [ ces] [ o|] [66a]
TECHNOLOGY
GIS Asset Management s 34 0 )
CCTV Camera Cues OZIII-S CCTV Camera Ss 59 0 0
Meter Replacement Replacement Program Ss 410 280 270 960 960
TOTAL- TECHNOLOGY [93] [s10[ 280[ 270] of o] | s60] | o] [960]
‘SPACE NEEDS
Fire Station / DPW Complex bd [ ] [ | [ | | } | 0} [8333] [2,333 |
TOTAL - SPACE NEEDS. | | 0] | o| o| o| o] o| | o} [8,333] [3,333 |
SEWER ENTERPRISE ACCOUNT | [_2,393 | [aso] 2,200] 3,160[ 2,105] 1,080] [9,405] [46,033] [55,438 |
SEWER ENTERPRISE ACCOUNT SUMMARY - FUNDING
SURPLUS REVENUE 93 512 280 560 205 0 1,557 1,557
DEBT 2,300 348 | 1,920 | 2,600 | 1,900 | 1,080 7,848 46,033 53,881
TOTAL - SEWER ENTERPRISE ACCOUNT - FUNDING [2,393 | | a60| 2,200] 3,160| 2,105] 1,080] | 9,405] [46,033] | 55,438 |
STORM WATER ENTERPRISE FUND
\usrdsks\userS\rscollins\Budget\FY 27 Budget\CapitallFORM A - FISCAL 2027 CPC.XLSX6-YEAR PLAN FORM A MUNICIPAL.
15
12/30/2025 8:06 AMSource page 203
FORMA
TOWN OF CANTON
CAPITAL PLANNING COMMITTEE
SIX-YEAR PLAN FY2026 5-Year 6-Year
Beginning with Fiscal Year 2026 and ending with 2031 VOTED Fy2027 | Fy2028 | Fy2029 | Fy2030 | Fyz0a1 | torat_| [_Fy2032 | TOTAL
(000's omitted)
SEWER IMPROVEMENT PROJECTS
First Parish Rd Narrowing/Pavement Removal/Rain Garden s 100 100 100
Rockland St. Culvert D 0 450 450
Mechanic St. Culvert D t) 450 450
Stormwater Management Program s 250 250 275 275 1,050 0 1,050
Stormwater BMP - Hansen School D ) 250 250
Stormwater BMP - Ponkapoag D 0 400 400
York at Ledgewood Drain D 0 750 750
TOTAL - STORMWATER IMPROVEMENT PROJECTS. | 0} 100] 250] 250] 275| 275] [ 1,150] [ 2,300] [| 3,450]
VEHICLES
Street Sweeper 2025 Elegin Sweeper #35 s 330 0 0
Dump Sander Westernstar #19 s 424 0 0
Dump - Sander 2004 Sterling L8500 #21 D 437 437 437
0 0
L754 | a7] o] o] o] o] [ 437] [0] [37]
EQUIPMENT
Flush Truck (seweristormwater} 2008 International 7300 #71 pd [ | 348 | | | | | | 348 | | 348 |
| | | | | | | | 0 J | 0]
[_] sae] of oof to [san] 0] [se]
TECHNOLOGY
l l l I l ] | 0] [ J | 0]
[3] oot oT SCO LC oJ FE oJ LC 9]
[ STORMWATER ENTERPRISE ACCOUNT | [754] 385] _250| 250| 275| 275] [ 1,935] [ 2,300] [ 4,235]
STORMWATER ENTERPRISE ACCOUNT SUMMARY - FUNDING
SURPLUS REVENUE 754 100 250 250 275 275 1,150 1,150
DEBT 0 785 0 0 i‘) 0 785 2,300 3,085
TOTAL - STORMWATER ENTERPRISE ACCOUNT - FUNDING [754] 335] 250] 250] 275|[ 275] [ 1,935] [ 2300] [ 4,235]
SKATING RINK ENTERPRISE ACCOUNT
BUILDING & GROUNDS REPAIRSMPROVEMENTS
Rehab Bleacher System s () )
Roof Repairs/Replacement D 0 0
Unit 2 Compressor & Glycol Tank Replacement D ) )
Dehumidifier - replacement s 0 0
Unit 2 Compressor - replacement s ) 0
Insulate Refrigeration Header s t) 0
Chiller/Compressor s ) 0
I TOTAL- BUILDINGS, ETC [ 0] OHI OT of of oj [ 0} [ 0} [ 0]
VEHICLES
available for use s [ | | | | | ] | 0 0
available for use s | [ | | | | 0 0
[__TOTAL- VEHICLES [ 0] oT Oo] oT oT 0] [ oj [| oj [ 0
EQUIPMENT
Zamboni Upgrade Back-up Zamboni D ) 0
Zamboni Replace Main Zamboni D ) 0
Zamboni Rehab Electric Zamboni s i) 0
Skate Sharpener Custom Radius Skate Sharpener s ) 0
Zamboni Ice Edger ) 0
Zamboni Zamboni Electric Edges Start ) 0
Zamboni 1989 Zamboni Ice Resurfacer with Ice Machine 0 0
Ice Resurfacer 2008 Electric Ice Resurfacer 0 0
) 0
) 0
[TOTAL- EQUIPMENT I 0} oT oy of} oT oj | ol [ ol | 0}
\usrdsks\user$\rscollins\Budget\FY 27 Budget\CapitallFORM A - FISCAL 2027 CPC.XLSX6-YEAR PLAN FORM A MUNICIPAL.
16
12/30/2025 8:06 AMSource page 204
FORMA
TOWN OF CANTON
CAPITAL PLANNING COMMITTEE
SIX-YEAR PLAN FY2026 5-Year 6-Year
Beginning with Fiscal Year 2026 and ending with 2031 VOTED [ FY2027. | FY2028 I FY2029 [ FY2030 | FY2034 | TOTAL E FY2032 ] TOTAL
(000's omitted)
| SKATING RINK ENTERPRISE ACCOUNT | | o| | of o| o] o| o| | of] | of] | o|
SKATING RINK ENTERPRISE ACCOUNT SUMMARY - FUNDING
SURPLUS REVENUE 0 0 0) 0 0 0 0 0 0
DEBT 0 Qo ) 0 o 0 0 0 ti)
[ TOTAL - SKATING ENTERPRISE ACCOUNT - FUNDING | [ 0] [ o| o| o| o| o| | o| [ ol | |
[OTHER SELF-SUPPORTED PROGRAMS |
FIRE DEPARTMENT AMBULANCE FUND
VEHICLES
) }
Ambulance (A-1) 2020 Ford F550 #5019 593 652 652 652
Ambulance (A-4) 2016 Ford 550 Ambulance 652 652 652
Ambulance (A-2) 2024 Ford F550 #5033 0 0
Ambulance (A-3) 2019 Ford F550 #8910 Q Q
E-2 - Fire Engine Replacement ($500k Ambulance Repts. & $590K debt capital) 1,090 0 0
[[_TOTAL- VEHICLES ] [1683] | OT Oo] 652] 652] o| [71,3647 [ Of { 1,304 |
EQUIPMENT
Chest Compression System 15 16 15
Defibrillators 10 10 10
Lifepak 15 V2 Defibrillator 0 0
Purchase 2 Power Ambulance Cots 0 0
Terrain Vehicle 2007Kubota RTV 900G M88759 0 0
Trailer 2010 Emergency Management Trailer M91686 0 0
Opticom System - Police Qo 0
Purchase EMS Software 0 0
[TOTAL EQUIPMENT ] [ 0] [ oT 10] 76] Oo] 0] [ 26] [ 0} [ 26 |
| FIRE DEPARTMENT AMBULANCE FUND | [1,683 | [ o| 10{ sez] 652] o| [1329] [ o| [1,329]
FIRE DEPT SELF-SUPPORTED ACCOUNT SUMMARY - FUNDING
SURPLUS REVENUE. 1,093 0 10 667 652 tO) 1,329 0 1,329
DEBT 590 0 0 0 0 ) 0 0 0
TOTAL - FIRE DEPT SELF-SUPPORTED ACCOUNT -FUNDING | [1,683 | [ o| 10[ e7] 652] o| [1329] [ o| | 1,329]
Nusrdsks\users\rscollins\udgel\FY 27 Budget\CapitallFORM A - FISCAL 2027 CPC,XLSX6-YEAR PLAN FORM A MUNICIPAL
7
42/30/2025 8:06 AMSource page 205
MUNICIPAL CAPITAL REQUESTED for FISCAL 2027
DEPT | AMOUNT [CASH | DEBT | CASH OTHER
DEPARTMENT PRIORITY DESCRIPTION _ [REQUESTED | CAPITAL CAPITAL | RESERVES] FUNDING
_ Board of Health | 1 Health Dept. SUV Replacement _ | 35,000} 35,000 | - = =
Board of Health | 2 Vaccine Refrigerator Freezer Replacement 6,000 6,000 - - =
- MIS |1__ [AV / Firewall & Anti-Virus Renewal 96,000 89,000 | - - 7,000
MIS. ___2__|4 Server Replacements & Addt'l Storage 80,000 80,000 = = =
MIS |2 Storage Area Network (SAN) Replacement 180,000 - 180,000 : :
MIS. __ 3.70 Computer Replacements 89,000 89,000 | . = =
MIS 4 Software Upgrades - Office 365 | 120,300 120,300 - - -
MIS 5 _|Exterior Cameras for Police Station 23,000 23,000 = - | = ||
MIS 6 \3 Data Terminal Replacements for Police Vehicles 20,000 20,000 - - -
MIS 7 7 (AN for Library Community Room 70,000 70,000 | a - -
2001 E-One Ladder Truck Replacement (Debt Service
- - - 810,000
Fire y paid by Ambulance Receipts) | 1,810,000 we
Fire 2 Feasibility Study _ _ 110,000 110,000 - -
—_ Library 1 |Library Interior Renovation 2nd Round of Funding ESTIMATE 1,366,540] - 840,994 | 525,546]
- a _ |Duggan Field Retention Wall Replacement (Mitigation | 4.9...) _ =e
Parks & Recreation 1 Funding being Recommended) 126,120 ane 7 | Lisa
__ Parks & Recreation 2 __|Pequitside Upper Field Renovation __ 116,100. 116,100 : : :
___Parks & Recreation 3 __|Repaving of Parking Lot at Pine St. Garage 161,000 - | 161,000 = -
: _ =~=té‘<té‘;*é‘a®:*~SCS*é«* Police Cruiser Replacements rs re ars
Bolice u |(Transfer from Police Fire Supression Project) 331,679 eal . . - PATOES
Police 2 7 Tasers 41,520 41,520 | - -
Police | 3___|6 Hands-free communications systems for motorcycles 23,499, 23499) - |
. |FD Boiler Replacement (Transfer from Sr. Center HVAC a |
Central Maintenance | |Project due to $250K Grant Funding awarded) 250,000 ° | . . viii
Central Maintenance | 2 Air Conditioning System for American Legion Hall 13,800 13,800 - - -
. | DPW Highway Garage Roof Replacement
Central Maintenance | 3 (Transfer from Police Roof Project) ft 197.800 - 97,700 - 100,100
_CentralMaintenance 4 2004 Kubota Tractor Replacement _ 41,395 = = =
Central Maintenance 56. Police Dept Headquarters Building Repairs 89,157 - - -
Central Maintenance 6 —_|2017 CM2 F350 Vehicle Replacement w/Hybrid _—_ 45,280 = = E
Central Maintenance 7 Upfitting / Outfitting of 5 Central Maint. Vehicles | 10,325 = = 2
Central Maintenance | 8 NewRideonLeafBlower ee | 12,399 99 | i - =
Central Maintenance | 9 2003 Trailer Mounted Leaf Vac Replacement L 8,500 : : :
Central Maintenance 10 _|Replace CMT1 & CMT2 Landscape & Utility Trailers | 9,290 -_ | - io -
Central Maintenance 11 HVAC Design for Memorial Hall | 50,000 | - | - -
| | |
Public Works __1___ [2008 CAT Loader Replacement (Vehicle #70) | 279,000, 279,000 | : -
Public Works 2 ___|Hosting Migration Services for Asset Mgmt SW | 20,000 20,000 - : :
| - - - -
Revere & Son Heritage Trust| 1 _|Vestibule at Rolling Mill & Storage Space atMuseum 36,800 36,800 - - ~
TotalGeneralFundRequests | 5,869,504 | 1,374,980 | 1,558,694 | 525,546 2,410,284
____ [Available Capital ee ___|_ 5,613,194 | 1,118,670 | 1,558,694 | 525,546 2,410,284
oe ~~ |Over (under) available 256,310 256,310 4 7 = —
Replace Ultrafiltration System at Sullivan Treatment Facility) =
Water 1 (Transfer from PFAS settlement account - might be 2,500,000 - 1,480,510 | - 1,019,489.73
higher) ee
Lead Service Line Inventory & Replacement Phase II |
Water (Likely supported byMWRA no interestloan) _2,260,000 aa 2,260,000 | 7 7
Water 3 Satellite Well Replacement for Well 14 at Moran Trtmt Facility 450,000 _- - -
Water 4 |New Dump Truck / Plow / Sander 297,000 Oo | E -
Water 5 Replace Truck #4 2009 F250 | 72,000 72,000 : - =
| ____|Total Water Enterprise Requests 5,569,000 819,000 | 3,730,510 | - 1,019,489.73
|
—___________| ee ae |
Sewer , 4 Replacement of Flush Truck (Split w/Stormwater) _ [ 347,500} - 347,500 : =
_ Sewer | 2. |Replace Truck #8 - Ford F350 ___ 102,000 102,000 e E E
Sewer | 3 Water Meter Replacement Program - Year 1 of 3 410,000 410,000 - - -
Total Sewer Enterprise Requests | 859,500 512,000 347,500 - -
in Storm Water - | 1 Replacement of Flush Truck (Split w/Sewer) - ; | 347,500 = 347,500 | 3 a
Storm Water 2 _|2004 Sterling L850 Swap Loader/Dump Sander Rplemnt (Vehicle #21)| 437,000 = 437,000; - | ~~ -
Storm Water 3 First Parish Rd Narrowing/Pavement Removal/Rain Garden | 100,000 100,000 - - ; -
Total Storm Water Enterprise Requests 884,500 100,000 784,500 - -
FY 27 Municipal Capital 12-29-25.xlsx
FY27 Muni REQUESTS 12-29-25
REVISED 12/29/2025Source page 206
DEPARTMENT OF FINANCE TOWN OF CANTON, MASSACHUSETTS SUSAN E. DESJARDINS 801 WASHINGTON STREET ASST. TREASURER/COLLECTOR sdesjardins@town.canton.ma.us WILLIAM R. SCOLLINS III CANTON, MA 02021 (781) 821-5006 pee anaes PHONE: 781-575-6610 @town. wma. ; rscollins@town.canton.ma.us FAX: 781-575-6608 LOUIS M. JUTRAS (781) 575-6612 INFORMATION SYSTEMS MANAGER town.canton.ma.us ‘ |jutras@town.canton.ma.us (781) 821-5069 ALLYSON M. PODGURSKI TOWN ACCOUNTANT apodgurski@town.canton.ma.us CODY M. PRATT (781) 575-6605 ASSISTANT TOWN ACCOUNTANT cpratt@town.canton.ma.us (781) 821-5011 MEMORANDUM TO: Departments, Boards & Committees Affordable Housing Trust Animal Control Officer, Stacy Benton Beautification Committee Building Commissioner, Ed Walsh Building Renovations Committee Council on Aging, Diane Tynan Capital Planning Committee Director of Assessing, Carolyn Floyd Commission on Disabilities Director of Central Maintenance, Brian Lynch Community Preservation Committee Fire Chief, Wendell Robery Conservation Commission Health Board Director, Margaret Goldstein Energy Advisory Committee Human Resources Director, Jody Middleton Finance Committee Library Director, Andrea Capone Historical Commission Operations Manager, William Walsh Information Systems Manager, Louis Jutras Parks & Recreation Director, Tyler Radicioni Local Emergency Planning Committee Police Chief (Interim), Joseph Perkins Planning Board Superintendent Public Works, Mike Trotta Revere & Son Heritage Trust Corp Town Accountant, Allyson Podgurski Select Board Town Administrator, Charlie Doody Sustainability Climate Action Planning Committee Town Clerk, Tracy Kenney Traffic Committee Town Planner, Connor Murphy Veteran’s Services Director, Arafat Knight School Superintendent, Derek Folan Walk, Bike & Hike Committee Assistant Superintendent of Finance Youth Commission & Operations, Brian Lynch Zoning Board of Appeals FROM: William R. Scollins, Ill, Finance Director /ES DATE: September 19, 2025 SUBJECT: FY 2027 Capital Budget Requests Enclosed are forms needed to complete the Town’s Five-Year Capital Plan. Town by- law stipulates that this capital plan be submitted to the Capital Planning Committee (CPC) by December 315. To allow enough time to review the capital requests, please submit your department’s requests to the Finance Department by Monday, November 3, 2025. The Finance Department will perform a quality assurance review of all the provided information before it is submitted to the Select Board for the municipal departments, and CPC for all Town agencies. Capital requests will be separated into two groups — cash capital and debt capital. Cash capital applies to smaller capital requests (at least $5,000) such as vehicles, technology or departmental equipment with a useful life of at least three years. Debt
Source page 207
ee capital pertains to larger capital items (at least $50,000) with a useful life of at least five years. 1. Form A, found, as an Excel attachment here, and on the Shared “S” drive, shows each department's last version of capital requests for fiscal 2027 through 2030, which have been balanced to the amount available for each year. Included are deferred requests that did not make last year’s balanced 5- Year Plan. Fiscal 2031 is blank and should be filled in as appropriate. NEW - PLEASE NOTE: The Capital Planning Committee (CPC) has already met this year in advance of the start of the Capital Budget process. They have shared with me that they need everyone's assistance with this process if it is to run more smoothly and on time. Specifically, they have the following basic requirements regarding the Form A that you will be submitting by November 3%, 1) Form A should always match what is submitted in your Form B’s. Hint: Complete your Form B’s first then ensure you have updated your Form A to match. 2) lf you have a new capital request for FY 27 that was not in your prior Form A (the version you are receiving with this email), then it must be represented as a NEW project in your Form B. Please review your department’s Form A to: add any new capital needs; confirm that each of the listed capital requests should still be included; ensure requests are appearing in the appropriate fiscal year; and that the estimated costs continue to be realistic. Please return your department's updated Form A to my office by November 3, 2025. To more easily locate your municipal department's current capital plan, please refer to the index in the first tab of the Form A’s, labeled “Index”. NEW Form B. In an effort to streamline the Capital review process, a new fillable Form B has been created as a PDF. Form B should be completed for each of your department’s fiscal 2027 capital requests. This form is also attached to this email. Please note that all fields in the Form are now required. Completion of this form requires you to provide sufficient supporting detail for elected officials, adminitrators, the Capital Planning Committee and the Finance Committee to evaluate the merits of your capital requests. NEW - PLEASE NOTE: Again, if a requested project is not in last year’s Form A, then it must be represented as a “New” project in the drop down menu. Spending requests which are characterized as “Unplanned” must contain clear explanation as to why they were not, or could not have been, planned. In order to better understand the cost of each project, you must discuss any contingency amount added to your request and why. In the last field of this Form, additional information regarding the consideration of Hybrid or Electric vehicles is required in your request. To assist the Capital Planning Committee with preparing the discussions of capital requests for the Annual Town Meeting warrant, please submit/email all Form B’s electronically in the PDF fillable form to the Finance Department.
Source page 208
eel Please ensure that all fiscal 2027 capital requests (rounded to nearest thousand) are accompanied by updated and realistic forward looking cost estimates. If your department has more than one capital request for fiscal 2027 please number them in rank order of priority in Form B. Form B, along with Form A, are attached to this email and also available on the “S” drive in the sub-folder named "CPC" The Excel workbook is named “FORM A — FISCAL 2027 CPC.XLSX” and the PDF file is named “FORM B ~ FISCAL 2027 CPC.PDF” 3. CPA: At this time the deadline of August 15, 2025, for Community Preservation Committee pre-applications has passed for the FY ’27 budget cycle. However the deadline for final applications is October 10, 2025. Please find the full CPA application form attached along with the CPA Application Process memo. For departments under the jurisdiction of the Select Board, the Board and Administration will review those departments’ capital requests. The School Committee and Administration will undertake their process’ to arrive at their approved plans, which should be forwarded to the Finance Dept. by the last week of December to submit to the CPC by December 31°. The attached CAPITAL CAPACITY PLANNED USE sheet outlines the Town’s projected capital capacity for fiscal years 2027 through 2031 assuming the capital plan is fully funded. Once cash reserves are certified by the DOR, we may or may not utilize some of those funds to supplement the fiscal 2027 capital plans. In addition, please find the Draft Fiscal 2027 Budget Timeline document that has been summarized in a one page Budget Milestone Calendar for easy reference. If anyone is aware of dates that should be changed, just let me know and I'll update. Please let me know if you have any questions or concerns regarding these matters. WRS Attachments
Source page 209
FY 2027 BUDGET MILESTONE CALENDAR for The Town of Canton ByorOn Capital / CPA ~ Date or Operating Description ~ Owner 9/19/25 Capital Capital Budget Request Memo distributed to all Dept's, Boards & Committees Finance Director 10/10/25 CPA CPA Final Applications Due to Community Preservation Committee All Dept. Heads, Boards & Committees 11/3/25 Capital Municipal Dept's, Boards & Committees submit FY '27 Capital Requests to Finance All Dept. Heads, Boards & Committees November'2§ = Capital Municipal Dept's review their Capital Requests w/Town Administrator & Finance Director Dept. Heads / TA/ FD 11/26/25 Operating Operating Budget Memo & Worksheets distributed to all Dept's, Boards & Committees Finance Director 12/2 & 12/16 Capital Municipal Dept's review their Capital Requests w/the Select Board Dept. Heads / Select Board 12/30/25 Capital Muni & School Capital Plans for FY '27 thru ‘31 distrib'd to Capital Planning Comm. Finance Director 1/5/26 Operating Municipal Dept's, Boards & Committees submit FY '27 Operating Requests to Finance All Dept. Heads, Boards & Committees 1/21/26 Operating Municipal & Schoo! FY '27 Operating Requests distributed to the Finance Committee Finance Director 1/21/26 Operating Governor's FY '27 State Budget is released reflecting State Aid & Assessment Estimates Governor January'26 Operating Municipal Dept's review their Operating Requests w/Town Administrator & Finance Director Dept. Heads / TA/ FD 2/3/26 Operating Revenue Forecasting Committee meets to establish FY '27 General Fund Revenue Est's RFC / Finance Director 2/4126 Operating Voted Revenue Forecast, and Fixed Cost & Cash Capital Estimates submitted to FINCOM Finance Director 2/11/26 Operating FINCOM sets FY '27 School & Municipal Operating Budget Targets _ Finance Committee 2/3/26 & 2/17/26 Operating Municipal Dept's review their Operating Requests w/Select Board if Exceeding Base Budget Dept. Heads / Select Board 2/18/26 CPA CCPC reviews their FY '27 CPA recommendations w/Finance Committee FINCOM / CCPC Jan/Feb/Mar'26 Capital Dept Heads review their Capital Requests w/the Capital Committee CPC /SB/SC 3/18/26 Capital CPC reviews their FY '27 Capital recommendations w/Finance Committee FINCOM / CPC 3/27/26 | Motions | FINCOM submits draft of all Article motions to Town Counsel FINCOM 3/18 & 3/25 Operating School Committee & Select Board Reps review their Operating Requests w/Fincom FINCOM/SC/SB 3/25 & 4/1 Capital FINCOM Votes on Capital & CPA Budgets to be recommended to Annual Town Meeting Finance Committee 4/1/26 Operating FINCOM Votes on Operating Budgets to be recommended to Annual Town Meeting Finance Committee 4/8/26 | Write-Ups FINCOM submits all Article Write-Ups to Finance FINCOM 4/20/26 Revd by 4/27 FINCOM Report & Recommendations Finalized & Mailed to Residents (sent to printer 4/13/26 FINCOM / Finance Director 5/11/26 First Session of Annual Town Meeting Town Leadership & Voters * Please note: Departmental review meetings with each of the SB, SC, CPC, CCPC & FINCOM will be scheduled separately in support of these milestone goals. 12/10/2025
Source page 210
| 5-YEAR PLAN (2027 thru 2031) CAPITAL CAPACITY PLANNED USE (in thousands) BUDGET MEMO RESPONSIBILITY [ 2026 | [ 2027 | | 2028 | [ 2029 | | 2030 | | 2031 | [TOTAL] LEVY-RELATED CASH CAPITAL ALLOCATION MUNICIPAL 1,004 1,119 1,200 1,250 1,250 1,300 7,123 SCHOOL COMMITTEE 1,100 1,200 1,200 1,250 1,250 1,300 7,300 LEVY-RELATED CASH GRAND TOTAL | 2,104 | [ 2,319] [ 2,400] | 2,500] [ 2,500] | 2,600 | [14,423 | LEVY-RELATED DEBT ALLOCATION MUNICIPAL 928 1,559 1,200 1,250 1,250 1,300 7,487 SCHOOL COMMITTEE 2,000 1,100 1,200 658 1,250 1,300 7,508 LEVY-RELATED DEBT GRAND TOTAL [ 2,928 | [| 2,659] [ 2,400] | 1,908] | 2,500] | 2,600] [14,995 | LEVY-RELATED TOTAL CAPITAL CAPACITY TOTAL MUNICIPAL 1,933 2,677 2,400 2,500 2,500 2,600 14,610 TOTAL SCHOOL COMMITTEE 3,100 2,300 2,400 1,908 2,500 2,600 14,808 LEVY-RELATED CAPITAL GRAND TOTAL | 5,033 | [ 4,977] [ 4,800] [ 4,408] [ 5,000] [ 5,200 | [29,418 | ATMDATA - 8-20-25.xIsx CAPACITY PLAN 2027
Source page 211
Town of Canton Community Preservation Committee CPA Application Process FY27 The application process for the next round of Community Preservation Act (CPA) funding is now open! The instructions that follow explain the two-stage application process that project proponents must follow in order to have their proposal considered by the Canton Community Preservation Committee (CCPC) as well as the additional steps that go into reviewing, recommending and funding CPA projects. If you have any questions about the process or about whether a project you are considering might be eligible, please contact the CPA Administrator at ccpc@town.canton.maus. If you would like a general CPA overview, helpful information and technical assistance articles can be found at www.communitypreservation.org. STEP 1: CPA PRE-APPLICATION The preliminaty application form will introduce your proposal to the CCPC and will allow the Committee to determine the project's eligibility. Beyond the question of whether a project is eligible for funding under the CPA statute, the details provided in the pre-application allow the CCPC to offer feedback/guidance and to assign a project liaison in advance of completing the full CPA application. Pre-Applications should be e-mailed by the close of business on Friday, August, 15, 2025 to: CC pc@town.canton.ma.us The CCPC will respond within 10 business days to all applicants who submit the preliminary application by the deadline noted above with a finding as to project eligibility. STEP 2: CPA FULL APPLICATION Upon receipt of acknowledgment of project eligibility (as determined through the pre-application process), project proponents should complete the full application for CPA funding. Full Applications should be e-mailed by the close of business on Friday, October 10, 2025 to: cpc(@town.canton.ma.us In rate circumstances and at its discretion, the CCPC may vote to extend the deadline due to special circumstances or for compelling reasons. STEP 3: CCPC REVIEW PROCESS The CCPC will review applications submitted by the deadline to determine if they are: 1. Supported by the property owner/controlling authority (as appropriate) Page 1 of 2
Source page 212
2. Consistent with the goals set forth in the most recent version of the Community Preservation Plan. 3. Sufficiently developed in terms of their work plan and budget, and ate ripe for consideration for the coming fiscal year; and 4. Supported by the community as evidenced by co-sponsorship or letters of support. The CCPC will schedule public meetings to discuss each proposal in an open forum with applicants. These meetings ate typically held in December each year. These discussions may lead to the need for additional information or proposal revisions. The CCPC must vote to recommend proposals before they can be placed on the Annual Town Meeting watrant. STEP 4; CCPC RECOMMENDATIONS The CCPC must vote to recommend proposals before they can be placed on the Annual Town Meeting warrant. The Committee may recommend projects for approval as presented or may include detailed scopes, conditions or other specifications, as appropriate, to ensure compliance with the CPA statute. A favorable vote may also include modifications to the proposed project; partial funding or phasing provisions. STEP 5: TOWN MEETING VOTE The CCPC will present its recommendations to Annual Town Meeting for discussion and vote. Town Meeting has the final authority to award funds from Canton’s Community Preservation Fund. Town Meeting can approve, reduce, or reject recommended amounts for a project. A simple majority vote is required to approve funding; a two-thirds vote is required for borrowing. STEP 6; PROJECT EXECUTION Funds for approved projects will be available July 1, the start of next fiscal year, and are subject to conditions or procedutes established by the CCPC. CPA monies are public funds raised from dedicated Canton tax revenues and from State subsidies to the Town. Projects financed with CPA funds and carried out on public property or by a public entity must comply with all applicable State and municipal requirements, including the State Procurement law, which requires special procedures for the selection of products, vendors, services and consultants. Invoices for work completed or for funds allocated to grantees on approved projects should be submitted to the CCPC. For more information visit www.town.canton.ma.us/CCPC/CCPC.htm Page 2 of 2
Source page 213
Town of Canton Community Preservation Committee FY 2027 CPA Application Form DUEDATE: October 10, 2025 Complete applications for the FY 26 round of CPA funding must be submitted by 5:00 PM on Friday, October 10", 2025. Applicants may send via e-mail to: ccpe@town.canton.ma.us PROJECT NAME: PROJECT SPONSOR / ORGANIZATION: CONTACT NAME: ADDRESS: TELEPHONE NUMBER: EMAIL: PROJECT LOCATION/ADDRESS: NAME OF PROPERTY OWNER (if different from applicant): CPA FUNDING REQUESTED: $ FUNDING CATEGORY (check all that apply): L] Community Housing - Please note # of housing units proposed/preserved: [] Historical Resources CL] Open Space - Please note # of acres in parcel to be acquired/preserved: L] Recreation PROPOSED BUDGET: Please attach cost estimates used to develop budget or describe process used to arrive at funding request. CPA Funding Requested $ Other Funding Sources (if applicable) $ Total Project Cost $ Page 1 of 4
Source page 214
PROJECT DESCRIPTION: Answer the following questions in the space provided or on a separate sheet of paper. Applications will be returned as incomplete if all information is not provided. Include supporting materials, as necessary. Provide a description of the proposed project: Describe the project goals and summarize how the project is consistent with the Community Preservation Plan, Canton’s Master Plan, Housing Action Plan, Housing Production Plan, Open Space & Recreation Plan Update and/or with other planning documents that have received town-wide review and input: Describe the expected timeline for project implementation (include projected start and end dates and basic timeline for important milestones): ‘ Page 2 of 4
Source page 215
Describe the need for the proposed project and explain how it will benefit the public: Describe any ongoing maintenance that will be required to protect the CPA investment in your project and how maintenance costs will be funded in the future: Describe how the success of this project be measured (be as specific as possible): Describe how the experience of the applicant(s) and any contractors will contribute to the successful implementation of this project: Describe any additional funding sources available, committed, or under active consideration (include copies of commitment or rejection letters, describe any attempts to secure outside funding for this project): Page 3 of 4
Source page 216
Please indicate if the proposed project meets any of the following criteria (check all that apply): Project will serve more than one community preservation principle Project is supported by one or more relevant town boards/committees Project will serve multiple needs and populations Project will serve a population that is currently underserved Project will leverage multiple funding sources Project will preserve a threatened resource Project will allow or promote public access OOOOOO0U Project can be completed at a reasonable cost ATTACHMENTS: Detailed Budget: Applicants must provide accurate and detailed estimates of the total budget for the project and how CPA funds will be spent. Budget attachment shall: Clearly identify all items of expenditure (including cost of signage to acknowledge CPA funding) Include detailed estimates from potential suppliers Distinguish between hard and soft costs and contingencies Vv VW Quantify in-kind donations and/or the value of labor provided by the Department of Public Works or other volunteers >» Include projected costs for legal oversight, external project management, etc. Community Support: Applicants should provide evidence of public support including any relevant letters of support; copies or links to media coverage; demonstration of other funding sources; etc. Images / Digital Photography: Applicants should consider attaching visuals (photos/maps/renderings/ plans) that might help the CCPC better understand the proposed project. Historic Preservation Projects: Applicants pursuing CPA funding for Historical Resources projects must complete and submit the CPA Application Addendum - Supplemental Information for Historic Preservation Projects. APPLICANT SIGNATURE: DATE: Page 4 of 4
Source page 217
DEPARTMENT OF FINANCE TOWN OF CANTON, MASSACHUSETTS MEMORIAL HALL SUSAN E. DESJARDINS ASST. TREASURER/COLLECTOR WILLIAM R. SCOLLINS III 801 WASHINGTON STREET sdesjardins@town.canton.ma.us CANTON, MA 02021 FINANCE DIRECTOR , (781) 821-5006 rscollins@town.canton.ma.us PHONE: 781-575-6610 (781) 575-6612 FAX: 781-575-6608 town.canton.ma.us LOUIS M. JUTRAS INFORMATION SYSTEMS MANAGER ALLYSON M. PODGURSKI Ijutras@town.canton.ma.us TOWN ACCOUNTANT (781) 821-5069 apodgurski@town.canton.ma.us CODY M. PRATT (781) 575-6605 ASSISTANT TOWN ACCOUNTANT cpratt@town.canton.ma.us (781) 821-5011 MEMORANDUM To: | Town of Canton Select Board From: Randy Scollins, Finance Director W/ES Date: November 25, 2025 RE: FY 2027 MUNICIPAL CAPITAL REQUESTS At your December 2"4 and 16" Select Board Meetings Municipal department heads will be providing a brief overview of their FY 2027 Capital Requests. Attached is a one page summary of those requests. General Fund requests total $6.92 million. We have identified $4.95 million in funding sources including annual cash ($1.12 million) and debt ($1.55 million) capital allocations plus other available funding ($2.28 million) from other funding sources. At this point in the process this leaves an unfunded balance of $1.97 million. It is possible that the next round of funding for the listed Library Interior project could be reduced by ~$1 million as that project continues to be refined. At this time no “Free Cash’ funding has been identified to support these requests. Department heads will review their requests with the Capital Planning Committee (CPC) over January, February and March of 2026, at which point the CPC will present their recommendations to the Finance Committee. We will circle back with the Select Board in late February or early March to request your recommendations, which will also be shared with CPC and Fincom. The $2.28 million in other funding sources includes $1.81 million in debt financing through the Ambulance Receipts fund, $217 thousand in transfers from two Police capital projects no longer required, and $250 thousand from this year’s Senior Center HVAC replacement project due to that amount being recently awarded from a State Energy Resources grant and therefore freeing up that amount in that project’s capital budget. Please see these funding sources associated with respective projects highlighted in blue in the attachment. Five Water Enterprise capital requests total $5.57 million and are supported with a mix of debt ($3.9 million), retained earnings ($819 thousand) and $841 thousand in PFAS settlement funds already received, and most likely a zero percent interest loan from MWRA on the Lead Service Line project.
Source page 218
Three Sewer Enterprise capital requests total $852.5 thousand and are supported with a mix of debt ($347.5 thousand) and retained earnings ($505 thousand). Three Storm Water Enterprise capital requests total $884.5 thousand and are supported with a mix of debt ($784.5 thousand) and retained earnings ($100 thousand). Please advise if any questions at this point in the Capital Budget process. Attachment ce: Charles Doody, Town Administrator Jennifer Kemalian, Assistant Town Administrator Allyson Podgurski, Town Accountant
Source page 219
5-YEAR PLAN (2027 thru 2031) CAPITAL CAPACITY PLANNED USE (in thousands) BUDGET MEMO | RESPONSIBILITY | 2026 | | 2027 | | 2028 | | 2029 | | 2030 | | 2031 | [TOTAL| LEVY-RELATED CASH CAPITAL ALLOCATION MUNICIPAL 1,004 1,119 1,200 1,250 1,250 1,300 7,123 SCHOOL COMMITTEE 1,100 1,200 1,200 1,250 1,250 1,300 7,300 LEVY-RELATED CASH GRAND TOTAL | 2,104] [ 2,319] | 2400] | 2,500] | 2,500] | 2,600 | [14,423 | LEVY-RELATED DEBT ALLOCATION MUNICIPAL 928 1,559 1,200 1,250 1,250 1,300 7,487 SCHOOL COMMITTEE 2,000 1,100 1,200 658 1,250 1,300 7,508 [ LEVY-RELATED DEBT GRAND TOTAL | 2,928| | 2,659] | 2,400] | 1,908] | 2,500] | 2,600 | [14,995 | LEVY-RELATED TOTAL CAPITAL CAPACITY TOTAL MUNICIPAL 1,933 2,677 2,400 2,500 2,500 2,600 14,610 TOTAL SCHOOL COMMITTEE 3,100 2,300 2,400 1,908 2,500 2,600 14,808 LEVY-RELATED CAPITAL GRAND TOTAL | 5,033 | | 4,977] [ 4,800] | 4,408] | 5,000] | 5,200| [29,418 | FY 27 Municipal Capital 11-07-25.xIsx CAPACITY PLAN 2027