Skip to content
Search Canton

Canton, Massachusetts · Saved source text

FY20 Municipal - Capital Requests - Jan 2019 pdf file

Budgets & Finance · Record year 2019 · Record 5c955b7bb664c59a3c

Open original municipal record ↗Open interactive reader

Saved text from 157 source pages. Transcription and OCR may contain errors; verify figures and wording against the original. Retrieved 2026-10-15.

Source page 125

TOWN OF CANTON
                                      FORM B -FISCAL 2020
                        CAPITAL PROJECT /EQUIPMENT REQUEST

  DEPARTMENT:                                                SUBMITTED BY:
                    Public Works                                       Michael Trotta


  PRO]ECT /EQUIPMENT TITLE:
                                          10 Wheel Dump Truck


  TOTAL PRO]ECT /EQUIPMENT COST:(must be at least $5,000.)
                                   $241,000

 DESCRIPTION:
New or current model year Freightliner 1145D 10 wheel truck equipped with a stainless steel
Hi-Way XT3 Dump Body and 13 foot V Plow.




  PURPOSE AND JUSTIFICATION:
This new addition to the Public Works fleet will allow better efficiency in hauling materials such as road
salt, street sweepings, asphalt, storm debris, and excavated material. For winter storm fighting along
with a V plow, the truck is equipped with automatic sander controls and a wet deicing system.




  NEED CLASSIFICATION:(Check a/I that apply)              Departmental Priority Ranking:
     Required for Safety                                    Please rank this request out of your total
     Required by Law or Mandate                             requests for this year:(#1 as top priority)
  x Improve/Expand Service or Increase Efficiency                   3 (#) OF               7 (#)

     Planned Project or Replacement                       Expected Useful Life: (Check one)
     U nplanned Project or Replacement                       20 or More Yrs     5 to 9 Years
     New Project/Item (not on last year's 5-Yr, Plan)     x 10 to 19 Years      3 to 4 Years


 Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
    W i l l Reduce Cost by $                     Will Produce Addle Revenue by $
  x No Impact                                  x Revenue  Neutral (no impact)
    Will Increase Cost by $                      Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)




  FORM 8 -FISCAL 2011

Source page 126

Prepared for:                                                                                                     Prepared by:
Bill Walsh                                                                                                       Richard Coutu
Town of Canton DPW                                                                                  TRI STATE TRUCK CENTER,
801 Washington St                                                                                                         I NC.
Canton, MA 02021                                                                                     411 HARTFORD TURNPIKE
Phone: 781-821-5025                                                                                   SHREWSBURY, MA 01545
                                                                                                           Phone: 508-753-1200




                                                A proposal for
                                            Town of Canton DPW
                                            State Contract VEH-98

                                             Prepared by
                                    TR/ STATE TRUCK CENTER, INC.
                                            Richard Coutu


                                                    Oct 10, 2018


                                          Western Star 4700SF




                          Components shown may not reflect all speed options and are not to scale




Application Version 10.1.105                                /~\                                        10/10/2018 11:07 AM
Data Version PRL-18T.024                                    ~~
Canton 4700 2020                                                                                               Page 1 of 17

                                                      WESTERN STAR`

Source page 127

Prepared for:                                                                                                     Prepared by:
 Bill Walsh                                                                                                       Richard Coutu
 Town of Canton DPW                                                                                  TRI STATE TRUCK CENTER,
 801 Washington St                                                                                                         I NC.
 Canton, MA 02021                                                                                     411 HARTFORD TURNPIKE
 Phone: 781-821-5025                                                                                   SHREWSBURY, MA 01545
                                                                                                            Phone: 508-753-1200




                                            Q U O T A T I O N
 4700 SET-FORWARD FRONT AXLE CHASSIS

SET FORWARD AXLE -TRUCK                                            110 INCH BBC STEEL CONVENTIONAL CAB
DETROIT DD13 12.8E 450 HP @ 1625 RPM, 1900 GOV                     5125MM (202 INCH) WHEELBASE
         RPM, 1650 LB/FT @ 975 RPM                                 1/2X3.64X11-7/8 INCH STEEL FRAME
ALLISON 4500 RDS AUTOMATIC TRANSMISSION WITH                               (12.7MMX301.6MM/0.5X11.88 INCH) 120KS1
         PTO PROVISION                                             1775MM (70 INCH)REAR FRAME OVERHANG
RT-46-160P 46,000# R-SERIES TANDEM REAR AXLE                       PARTIAL INNER FRAME REINFORCEMENT AT FRONT
TUFTRAC 46,000# REAR SPRING SUSPENSION                                      SUSPENSION
DETROIT DA-F-20.0-5 20,000# FL1 71.0 KPI/3.74 DROP                 BODY COMPANY INSTALLED ADDITIONAL FRONT
         SINGLE FRONT AXLE                                                  FRAME REINFORCEMENT FOR SNOW PLOW
20,000# TAPERLEAF FRONT SWSPENSION

                                                                                             PER UNIT                      TOTAL


 VEHICLE PRICE                                         TOTAL # OF UNITS (1) $                   135,741     $              135,741
 EXTENDED WARRANTY                                                                $                   0     $                      0
 JC MADIGAN EQUIP.                                                                $             104,875     $              104,875
 CUSTOMER PRICE BEFORE TAX                                                        $             240,676     $              240,616

 TAXES AND FEES
 TAXES AND FEES                                                                   $                   0     $                      0
 OTHER CHARGES                                                                    $                   0     $                      0

 TRADE-IN
 TRADE-IN ALLOWANCE                                                               $                 (0) $                         (0)

 BALANCE DUE                                           (LOCAL CURRENCY) $                      240,616     $              240,616
COMMENTS: Projected delivery on _ / _ / _provided the order is received before _ / _ /
APPROVAL: Please indicate your acceptance of this quotation by signing below: Customer:
X                                              Date:      /     /


                                          See your local dealer for a competitive quote from Daimler Truck Financial, or
   ~•                                     contact us at Information@dtfoffers.com.
                                          Daimler Truck Financial offers a variety of finance, lease and insurance solutions to
          Financing that works for you.   ft your business needs. For more information about our products and services, visit
                                          our website at www.daimler-truckfinancial.com.




Application Version 10.1.105                                /\ ~f                                         10/10/2018 11:07 AM
Data Version PRE-18T.024
Canton 4700 2020                                                                                                 Page 2 of 17
                                                     WESTERN STAR`

Source page 128

J.C. MADIGAN INC.                          SALES DEPT.
450 OLD UNION TURNPIKE                     TEL.(978)847-2900
LANCASTER , MA.                            FAX(978)847-0068

QUOTE:TOWN OF CANTON HWY DEPT

TO :RICH C. @ TRISTATE                    FROM JOHN DWYER

ITEM#
 319 PINTLE ASSEMBLY                    $ 850.00
409 CENTRAL HYDRAULICS(TRANS.)          $ 6500.00
423 (3)TAILGATE MTD. COAL DOORS         $ 1725.00
424 AIR TAILGATE                        $ 550.00
428 AERO AUTO LOAD COVER W/ ALUM.       $ 2550.00
448 EVEREST QC/PT POWER TILT HITCH      $ 8000.00
452 EVEREST R132TEL3654SH-V PLOW        $ 11000.00
455 4-WAY PLOW CONTROLS                 $ 1000.00
464 CANDY CANE QUIK COUPLER             $ 1800.00
476 MANUAL SANDER CONTROLS              $ 1950.00
482 (3)4" SPINNER MTD LIGHT             $ 600.00
486 DUAL STAINLESS TANK PRE-WET         $ 6950.00
495 10' HI-WAY XT-3 TYPE III W/         $ 31000.00
           1)ACCESS LADDER         6) SPARE TAILGATE
          2)STEEL CONVEYOR COVER   7)FLAT FENDERS
          3)(SS) UNDERBODY PANS
          4)(SS) CUSTOM SIDEBOARDS
          5)REAR SPINNER ASSY
502 UPGRADE TO 14' BODY LENGTH          $ 5000.00
504 (SS)BODY UPGRADE                    $ 17000.00
506 CIRUS EZ-SPREAD OPEN LOOP CONTROLS $ 3500.00
517 STEEL MATERIAL SCREENS              $ 2500.00
599x(3) F &(2)R LED LIGHT SYSTEM        $ 2400.00
             (NOTE!!! 120" CT REQUIRED)
                                          PRICE $104875.00

APPROVAL                                  I~~~

PO#                                   10/02/2018

Source page 129

TOWN OF CANTON
                                       FORM B -FISCAL 2020
                         CAPITAL PROJECT /EQUIPMENT REQUEST

  DEPARTMENT:                                                 SUBMITTED BY:
                    Public Works                                        Michael Trotta


  PRO]ECT /EQUIPMENT TITLE:
                                          Enclosed Cargo Trailer


 TOTAL PRO]ECT /EQUIPMENT COST:
                                                   $9,000

 DESCRIPTION:
A new or current year model Cross Country Mfg. CC716T-R Tandem Axle Trailer.




 PURPOSE AND JUSTIFICATION:
This enclosed cargo trailer is to be used to carry line painting machine and paint supplies to the job site.
Current open flat bed trailer does not have adequate capacity to carry machine and days supply of paint
and cleaning equipment. Enclosed trailer would also allow moving weather sensitive cargo and
equipment.



  NEED CLASSIFICATION:(Check al/ that apply)               Departmental Priority Ranking:
      Required for Safety                                     Please rank this request out of your total
      Required by Law or Mandate                              requests for this year:(#1 as top priority)
      Improve/Expand Service or Increase Efficiency                   4 (#) OF               7 (#)

  x Planned Project or Replacement                         Expected Useful Life: (Check one)
    U nplanned Project or Replacement                         20 or More Yrs     5 to 9 Years
    New Project/Item (not on last year's 5-Yr. Plan)       x  10 to 19 Years     3 to 4 Years


 Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
    Will Reduce Cost by $                         Wil l Produce Addle Revenue by $
  x No Impact                                   x Revenue Neutral (no impact)
    Will Increase Cost by $                    _Will    Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)




  FORM 8 -FISCAL 2017

Source page 130

Nar~OP,~~.                     5 Cushing Drive
                                               Wrentham, MA 02093
                                                                         846 Bronco Highway
                                                                         Burrillville, RI 02830
                                                                                                       45 North Main Street
                                                                                                       Carver, MA 02330
      POWER EQVIPMEN'T                         Tel:(508) 384-0011        Tel;(401)710-9911             Tel:(774)213-9190
                                                                                                       Fax:(508)465-0931
                                               Fax:(508) 384-8667        Fax:(401) 710-9466
        w ww.norfolkpower.com                             ~'~~'Please remit payment to Wrentham address*~~'
        i nfo@norfolkpower.com                                            Branch
     Ship To: SAME AS BELOW                                                 01 - WRENTHAM
                                                                          Date          Time                                  Page
                                                                            11/09/2018                 7:58:30 (0)             1
                                                                          Account No              Phone No              Est No p2
                                                                             CANT0025               7813891813           Q02450
                                                                          Ship Via                     Purchase Order
  Invoice To:   CANTON PUBLIC WORKS
                801 WASHINGTON ST                                         Tax ID No
                CANTON MA 02021
                                                                                                                  Salesperson
                                                                              MATT REARDON                              MDR


                                     EQUIPMENT ESTIMATE -NOT AN INVOICE
Description                   ** Q U O T E **             EXPIRY DATE: 01/28/2019                  Amount


Stock #: ?                  Serial #:                                                             8850.00
16x7 DARK GREEN ENCLOSED TRAILER




'~**All new equipment quotes valid for 45 days unless stated otherwise.*'~*            Thank You For Your Business!

Source page 131

Page | of 1

https://dpbfm6h358sh7.cloudfront.net/images/1792289/309476436.jpg                                                        11/4/2015

[Original embedded text, retained for comparison]
Page 1 of 1




https://dpbfm6h358sh7.cloudfront.net/images/1792289/309476436.jpg   11/4/2015

Source page 132

TOWN OF CANTON
                                     FORM B -FISCAL 2020
                        CAPITAL PROJECT /EQUIPMENT REQUEST

  DEPARTMENT:                                              SUBMITTED BY:
                   Public Works                                      Michael Trotta


 PROJECT /EQUIPMENT TITLE:
                                     Stumpex Stump Attachment


 TOTAL PROJECT / EQUIPMENT COST:(must be at least $5,000.)
                                    $20,000

  DESCRIPTION:
Fecon Stumpex log screw attachment for skid steer tractor. Includes hydraulic hoses and
q uick connect couplings.




  PURPOSE AND JUSTIFICATION:
Stumpex is a tool attachment with a screw head that fascilitates stump removal. The hardened steel
head works on any type wood, any size stump. It can be attached to Public Works skid steer or side
walk tractor.




 N EED CLASSIFICATION:(Check a// that apply)            Departmental Priority Ranking:
     Required for Safety                                  P/ease rank this request out of your total
     Required by Law or Mandate                           requests for this year:(#1 as top priority)
    Improve/Expand Service or Increase Efficiency                 5 (#) OF               7 (#)

    Planned Project or Replacement                     Expected Useful Life: (Check one)
    U nplanned Project or Replacement                     20 or More Yrs     5 to 9 Years
  x New Project/Item (not on last year's 5-Yr. Plan)   x 10 to 19 Years      3 to 4 Years


 Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
    Will Reduce Cost by $                         Will Produce Addle Revenue by $
  x No Impact                                   x Revenue Neutral (no impact)
    Will Increase Cost by $                    _Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)




  FORM 8 -FISCAL 2071

Source page 133

&46 Bronco Highway             45 North Main Street
     ~~No~o =                               5 Cushing Drive
                                            Wrentham, MA 02093         Burrillville, RI 02830         Carver, MA 02330
  . POWER EQUIPMENT                         Tel:(50Fi) 384-0011        Tel:(401) 710-9911             Tel:(774)213-9190
                                                                                                      Fax:(508)465-0931
                                            Fax:(508) 384-8667         Fax:(401) 710-9466
       w ww.norfolkpower.com                             ***Please remit payment to Wrentham address***
       i nfo@norfolkpower.com                                           Branch
   Ship To:    SAME AS BELOW                                              01 - WRENTHAM
                                                                        Date          Time                                   page
                                                                          11/12/2018                 7:07:37 (0)               1
                                                                        Account No              Phone No               Est No 01
                                                                           CANT0025                7813891813          Q02650
                                                                        Ship Via                      Purchase Order
 Invoice To:   CANTON PUBLIC WORKS
               801 WASHINGTON ST                                        Tax ID No
               CANTON MA 02021
                                                                                                                 Salesperson
                                                                          MATT REARDON                                 MDR


                                   EQUIPMENT ESTIMATE -NOT AN INVOICE

Description                ** Q U O T E **               EXPIRY DATE: 02/19/2019                  Amount


Stock #: ?                  Serial #:                                                           19900.00
FECON STUMPEX LOG SCREW ATTACHMENT FOR SVL95
INCLUDES HOSES WITH QUICK CONNECTS
30,000 FT. LBS TORQUE; AR500 STEEL BI;ADES

                                                                        Subtotal:               19900.00
Authorization:                                _'_,   _         > :   4uote Total:               19900.00




**All new equipment quotes valid for 45 days unless stated otherwise.**               Thank You For Your Business!

Source page 134

~a        ~---q-



      FECON
•       _~..._




         _Q
      ~ ~
                                                                                            ~~
                                                                                          _~;~ _.
                                                                                                                         ~    _
                                                                                                 ,..

                                                                                           •v-
                                                                                                     - .:                    ~~
      ,~                          ~
       R~.
         ~
                      ~,              ,-`                ~~
                                                         ~q                         ~
      .D                   ~                                                        .,~
      .e                                                                                                    + .


                                                               ,_                                           ~_
                                                                      ~
                                                                   ~6 '

                                                 l•                G


                                                                       /     ~'                               r


                           '`
                  y                                                                              }
              -   ~

                                                                                                 'p • "4                 1~ +~1+
                                      fir, ~ ~   .,.~.                        L t       ~ y-..
                                                                   t"




                           '
                           f'                                      ~{' '1_                                   ~?~
                           a4~,              '
                                                         \'-
                                                               ~              '
                                                                             r. .1,        ~
                                                                                                             ~
                                                                                                                  . ,~




I111:~!1:~1~~:{ilIl1I1~~1~/EMI

Source page 135

Greater than 28"
LESS IS MORE                                                                                                                                ~~8                     -~
 • High Torque, 20,000 - 30,000 ft Ibs for High Production
 • No Carbide Tools to Replace
 • Low Maintenance (Greasing &Sharpening every 1,000 Stumps)
 • Low RPM Auger Bit (7-16 RPM) Leads to Easy Clean-up and has
   no High Speed Flying Debris for Safer Work Zone
 • Fraction of Work Time Compared to Conventional Stumpers                                                                                    With One Bore                        Multiple Bores for
 • Mount on SI<id Steers with 20 - 42 GPM / 2,500 to 4,000 psi                                                                                                                       Larger Stumps


HOW IT WORKS                                                                                                                                                Flow         Speed       Depth /Min
 • Any Species of Wootl
                                                                                                                                                            GPM           RPM         3/4" Bit
 • Bores 20" into Ground while Cutting Feeder Roots
 • Durable AR500 Steel Blades make the Stumper Tough, Even in                                                                                                20            7.3          5.5"
   Rocky Conditions                                                                                                                                          24            8.8          6.6"
 • Safer than Conventional Stumpers due to Slow Rotation                                                                                                     28           10.2          7.7„
   Auger Bit Action                                                                                                                                          32           11.7          8.8"
                                                                                                                                                             36           13.1          9.8"
     JWERFUL &DURABLE                                                                                                                                        40
                                                                                                                                                             42
                                                                                                                                                                          14.7
                                                                                                                                                                          16.1
                                                                                                                                                                                         11"
                                                                                                                                                                                        12.1"




                                                                              Attachment Weight
                                                                                   1,368 Ibs


  3/4" Thicl<                                                     Up to 30,000 ft Ibs
AR500 Material                                                         Torque




                                                                Step ped Blades for
                                                                 More Efficient Cut
Primary Blade to
 Pilot the Bore
                               Hardened Auger Cone for
                               Positive Draw into Stump
•   Operators cab must be protected vaith both properly maintained 1/2" LEXAN'Glass (or equals and Falling Object Protection.
                                                                                                                                     yourjob safety requirements.
•   Always insure thatyour carrier manufacturers safety features (including Falling Object Protection, and Roll-Over Protection meet
•   Certain guarding and features may have been removed for illustrative purposes, always run with proper guarding.
                                                                                                                                                   ~
•   Weights ere subject to vary based on options.• Safety Is The Responsibility Of The Operator.                                                                                   ~               GS-30F-0019S
                                                                                                                                               ~1'                       (~   jJ
•   Specifications suhjeCtto change without notice.• Pictures may contain optional accessories.
•   Photographs may have been altered for marketing purposes.

Source page 136

TOWN OF CANTON
                                    FORM B -FISCAL 2020
                       CAPITAL PROJECT /EQUIPMENT REQUEST

 DEPARTMENT:                                             SUBMITTED BY:
                  Public Works                                     Michael Trotta


 PRO]ECT /EQUIPMENT TITLE:
                                           Message Board


 TOTAL PRO]ECT / EQUIPMENT COST:(must be at least $5,000.)
                                   $21,000

 DESCRIPTION:      '
A new or current year Wanco WTMMB Full Message Board.




  PURPOSE AND JUSTIFICATION:
Public Works has two Wanco Message Boards. They have been used to notify residents of road projects,
lane closings, and detours. This would be a third board.




 N EED CLASSIFICATION:(Check all that apply)           Departmental Priority Ranking:
     Required for Safety                                 Please rank this request out of your total
     Required by Law or Mandate                          requests for this year:(#1 as top priority)
    Improve/Expand Service or Increase Efficiency                6 (#) OF               7 (#)

    Planned Project or Replacement                     Expected Useful Life: (Check one)
    U nplanned Project or Replacement                     20 or More Yrs     5 to 9 Years
  x New Project/Item (not on last year's 5-Yr. Plan)   x  10 to 19 Years     3 to 4 Years


 Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
    Will Reduce Cost by $                        Wil l Produce Addle Revenue by $
  x No Impact                                  x Revenue Neutral (no impact)
    Will Increase Cost by $                      Wil l Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)




 FORM 8 -FISCAL 2011

Source page 137

EIT~t~ ~~"T~RH l~t ~
                               31 PLEASANT ST, WEST BRIDGEWATER, MA 02379
                                          Phone:(508) 583-9100
                                          WWW.VISI-FLASH.COM

                                                 QUOTATION

     Date:      October 24, 2018

Customer:       Town of Canton DPW

     Attn:      Billy Walsh    (wwalsh@town.canton.ma.us)

Location:

 ITEM    QTY.    DESCRIPTION                                             UNIT         TOTAL
 NO.                                                                     PRICE
                Wanco- Full Matrix Variable Message Sign (WTMMB),
 1      1       138"x 75"; Solar: 170 Watts, Batteries: (4)6-volt deep   $18,650.00 $18,650.00
                cycle, standard-duty pintle or ball hitch
                Wanco-Metro Matrix- Large Variable Message Sign
 2       1      (WVTMM-L),88"x 48", Solar: 170 watts, Batteries:(2)      $15,900.00 $15,900.00
                4D AGM,standard-duty pintle or ball hitch
 3       1      Modem (necessary to connect remotely)                     $1,200.00   $1,200.00
 4              Fleet Manager Service, monthly subscription through
                                                                         $20/Month
                Wanco

This quote is for the sale of a Wanco Variable Message Sign with the option for a modem and
Wanco Fleet Manager. These units all come with the standard solar, batteries, and on-board
charger. Delivery is included. Please call or email me with any questions.



                                        Thank You,




                                        Dan Doyle Jr.

Source page 138

10/3012016                                                        Wanco -Full-Matrix Message Signs




    Traffic Safety                         Y~ Law Enforcement             ~~ Security &Surveillance   ~ Power and Light




                                                                 ~a

                              ,. 1
                                                 ~   • ~I
                                 i




      Full-Matrix Message Signs
      WTMMB

      Full-size, full-matrix Wanco Variable Message Signs are the ideal choice when you need to get information to
      the public. The full matrix allows the greatest flexibility for displaying any type of message —large or small
      letters, graphics and symbols. Perfect for a wide variety of applications, a multitude of functions and options
      make these signs extremely versatile.




                   ~- ,
                    +
         ~~—~~

      Specificationst

             Click for full spec cations


      Dimensions




                                                                                                                          1/3
http:l/www.wanco.com/productsldetail.php?prd_id=5&type id=7#details

Source page 139

~aso~zo~s                                                          Wanco -Full-Matrix Message Signs

      Tr~vat ~,o~iuon




                                                             -
                                                             `
                                                           1,~




                                                                         H
                        ~ti


      13o~loyod
                                                                          ~~
                                                                         E35T}
                                                    ~—                                       ~~

                                                  (1~R;i                                     i'
                                                                                             I~
                                                     i                       --     _        ~.              1S4
                                                                                                    ~       i40141

                                                                                                     8~~
                                                                                                  ;+ ~13~
                                                                             a 'c
                                                                          ~ ~           _.          ~
                                                                         ~6             '~ ~--


                        1,-re .a;




      Weigh t

      Approx. 2640 Ibs.(1193 kg)

      Construction

      Trailer                         MIG-welded, 2 x 3-inch steel tubing
      Sign cabinet                    Aluminum sheet and welded channels
      Coating                         Powder-coated and oven-baked
      Axle assembly                   3500-Ib, capacity
                                      4-inch drop axle
                                      5 on 4.5-inch BC idler hub
                                      Double eye leaf springs
      Tires                           ST205/75 D15

      Display

      Resolution                      Four amber LEDs form each pixel
      Matra                           48 pixels wide, 27 pixels high
      Fonts                           12 fonts
      Default font                    18 in., 5x7 pixels per character
                                      3 lines of 8 characters per line, max.
      Smallest characters            4 lines of 12 characters
      Largest characters              1 line of4 characters

      Confro/panelinterface

     7-inch color touchscreen, capacitnre response
      S00 x 480 pocels, W x H

http://www.wanco.com/products/detail.php?prd id=5&type_id=7~tdetails                                                 2/3

Source page 140

10!30/2016                                                            Wanco -Full-MaVix Message Signs

       Power— standard

       Batteries                          Four 6Vdc deep-cycle golf-cart-type batteries, wired in parallel and series fora 12-volt system
       Battery capacity                   430 Ah total
       Battery charger                    15 A
       Solar panels                       130 W

      Power— optional

       Batteries                          Six 6Vdc deep-cycle golf-cart-type batteries, wired in parallel and series fora 12-volt system
       Battery capacity                   645 Ah total
       Battery charger                    45 A
       Solar panels                       170 W to 390 W




              Click for full specifications

       t5pec~cations subject to change without notice.




                              ~ ~fl~~~~ ~~~~~~a
                 -    ~                                                   Copyright O 2016 Wanco Inc. All rights reserved. Privacy policy




http://www.wanco.com/products/detail.php?prd_id=5&type_id=7#details                                                                         3/3

Source page 141

TOWN OF CANTON
                                    FORM B -FISCAL 2020
                       CAPITAL PROJECT /EQUIPMENT REQUEST

  DEPARTMENT:                                             SUBMITTED BY:
                   Public Works                                     Michael Trotta


  PROJECT /EQUIPMENT TITLE:
                  RPM Tech Model 217 Loader Mounted Snow Blower


  TOTAL PROJECT / EQUIPMENT COST:
                                              $140,000

 DESCRIPTION:
The request is for a new or current year RPM Tech 217 Snow Blower. This is a large snow
blower that attaches to the 928 Cat Front End Loader.




  PURPOSE AND JUSTIFICATION:
This is a new piece of equipment for Public Works. The blower will enhance the Department's winter
storm fighting ability. The Front End Loader equipped with the RPM 217 will be used in snow removal
efforts to widen snow clogged streets, making room for cars to pass, and reduce snow piles at
intersections and dead ends, improving visibility for cars and pedestrians.



 NEED CLASSIFICATION:(Check a/I that apply)            Departmental Priority Ranking:
    Required for Safety                                  Please rank this request out of your total
    Required by Law or Mandate                           requests for this year:(#1 as top priority)
 x Improve/Expand Service or Increase Efficiency                 7 (#) OF               7 (#)

  x Planned Project or Replacement                     Expected Useful Life: (Check one)
    U nplanned Project or Replacement                     ZO or More Yrs     5 to 9 Years
    New Project/Item (not on last year's 5-Yr. Plan)   x 10 to 19 Years      3 to 4 Years


 Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
    Will Reduce Cost by $                        Will Produce Addle Revenue by $
  x No Impact                                  x Revenue Neutral (no impact)
    W il l Increase Cost by $                    Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)




 FORM 8 -FISCAL 2011

Source page 142

Massachusetts & RI Locations:
                w

                ~ on                                                   100 Quarry Dr,
                                                                    Milford, Ma. 07757

                                                               14 Kendrick Rd., Rte 28
                                                                                                 84 Concord St.
                                                                                           N. Reading, Ma. 07864

                                                                                              2158 Plainfield Pike
                                                                  Wareham, Ma. 02571          Cranston, Rl. 02920


Southworth-Milton, Inc.
www.miltoncat.com
                                                                                d~ ,;r~ c~~'~ ~ ~ Fr 3'~:~~ f+r~~ ~~
                                                                                  1. ~~,1r~ ~_~,~ ~ ~t~~1'E'ttE ~t ~ : E:

                                                                              DATE: October 26, 2018
Town of Canton DPW
807 Washington St.                                              State Contract: MDOTWESTON06
Canton, Ma.
Bill Walsh


4ty                                       ~eSCt'I t10C1                  List Price       State Contract Price
      ~       New 2019 RPM Tech model 217 blower with:                 $ 164,900.00       $             139,950.00
              Chute Lights, Wireless Controls, Quick Coupler




                                   Total State Contract Delivered Price:                 $ 139,950.00


Tom Benedetti Jr
cJover~tnre~trar ana arare cares
Mobile Phone: 774-258-1636
Fax: 774-907-3062
tom_benedetti@miltoncat.com

Source page 143

..   ,:   ~.   _
                                               ~'~

      ` '
        ~• ~                  -        Contratt~Y Ot3D1i4RPM




         i'



~,~ - ~ ~                         .:

Source page 144

he electrical boxis sealed, and the hydraulic syste
Valves and controls is protected from debris,

_ L247 show blower nA

:

Source page 145

TOWN OF CANTON
                                    FORM B -FISCAL 2016
                        CAPITAL PROJECT /EQUIPMENT REQUEST

 DEPARTMENT:                                              SUBMITTED BY:
       Fire Department (Ambulance)                                 Charles E. Doody


 PROJECT /EQUIPMENT TITLE:
                                    Replacement of Ambulance 2


 TOTAL PROJECT / EQUIPMENT COST:
                                              $435,000

  DESCRIPTION:
A mbulance 2 is a 2016 Ford F-550 truck with approximately 53,000 miles. It is the front line
ambulance that is housed at Station 2. Ambulance 2 is the town's Advanced Life Support
Ambulance.



  PURPOSE AND JUSTIFICATION:
The town maintains one ambulance in each district. Ambulance 2 is approaching it's
anticipated service life and needs to be replaced due to increased maintenance costs and
reliablity. Based on past experience, we have accelerated the replacement due to the
increased wear and tear on the ambulances. EMS calls account for 70% of our call volume.



 NEED CLASSIFICATION:(Check a// that apply)            Departmental Priority Ranking:
    Required for Safety                                  Please rank this request out of your total
    Required by Law or Mandate                           requests for this year:(#1 as top priority)
 x Improve/Expand Service or Increase Efficiency                 1 (#) OF               1 (#)

  x Planned Project or Replacement                     Expected Useful Life: (Check one)
    U nplanned Project or Replacement                  _ 20 or More Yrs  x 5 to 9 Years
    New Project/Item (not on last year's 5-Yr. Plan)   _ 10 to 19 Years      3 to 4 Years


 Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
    Will Reduce Cost by $                         Will Produce Addl Revenue by $
  x No Impact                                   x Revenue Neutral (no impact)
    W il l Increase Cost by $                  _Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)




  FORM 8 -FISCAL 2014

Source page 146

53❑ JOHN DILTSCH BOULEVARD

                                                                  N ORTH ATTLEBORO~ MA ❑2763- 1 ❑8❑



  RE~nwoo~=~
E MERGENCY VEHICLES               'iI
                                                                                  P HONE: 508.695.71 38
                                                                                     Fnx: 5❑8.699.6842
                                                                                PAr.7s: 1 .8❑0,347.3876




   29 October 2U 18

   Charles Doody, Chiel'
   Canton Fire Department
   99 Revere Street
   Canton, Massachusetts 020"'1

   Dear Chief Doody,

      Based on oui• mcetin~ on October 2, 2U 18 1 lave E~ut together bud~,et numbers for tite
   cost of a new 2019 ambulance including some additional required equipment that vas
   discussed. Using the FOAM/MAPC p►•icc spreadsheet I would recommend a l~ud~et
   number of $3 ] 3.964.0 .

      Additional item~/equi~~ment such ~s Stryker I'owei•-Loyd. St~•yker Power-I'rc~ cot, Set-
   Coil~ headset system.. LifePak 1i monitor, Lucas CPR device, radios. h~ncl lights, portable
   radio charge~•s, tool allowance and re-lettc►•in~ of~ y0L11' Clll1'elll ambulance adds an
   additional amount of approximately $120.000.00. T}iis brims the grand total to
   ~433.96~4.00 I'or the new ambulance and items/equipment listed above.

      Please feel (cee to cont~lCl II1C if you h~vc any questions regElC(~Illg 1I11S 111IOemation or
   wish to add, or delete, any items/equipment.

      Current Uuild times For a ne~v ambulance are upproxim~tely 180-? 10 cloys following
   cecei~t of a ~urehase order. ~s alwa}~s, thank you for your conlidence in me and
   Grc~mvoy~Etncrgcncy Vehicles, LLC.

   Sii ere ~.

         Y~
   1<e' h        son
   nmbula ce Sales Manager
   Greenwood Emergency Vehicles, LLC
   kjacl:son(t~~reenwoodev.com
   108.809.98 t 7 direct
   X08.9>1.2951 cell




                               www. GreenwoadEV. com

Source page 147

TOWN OF CANTON
                                      FORM B -FISCAL 2020
                         CAPITAL PRO]ECT /EQUIPMENT REQUEST

  DEPARTMENT:                                                SUBMITTED BY:
       Public Works(Water Enterprise)                                  Michael Trotta


  PROJECT /EQUIPMENT TITLE:
                 Repurposing of MWRA Control Valve at Dedham Street


  TOTAL PROJECT / EQUIPMENT COST:
                                                 $203,000

 DESCRIPTION:
Engineering design and construction to repurpose the existing pressure reducing valve to act
as an electronically controllable pressure reducing valve.




  PURPOSE AND JUSTIFICATION:
Based on model simulations ,sampling results water age in Town's water is in need of improvement due
to low percentage of turn in the tanks. A digitally controllable valve is needed to limit flow from the
M WRA during peak times, which will require that the water in the storage is used first. This will increase
water turnover and lower the age of the water coming from the tanks into the distribution system.



  N EED CLASSIFICATION:(Check a// that app/y)             Departmental Priority Ranking:
      Required for Safety                                   Please rank this request out of your total
      Required by Law or Mandate                            requests for this year:(#1 as top priority)
     Improve/Expand Service or Increase Efficiency                  1 (#) OF ~(#)

  x Planned Project or Replacement                        Expected Useful Life: (Check one)
    U nplanned Project or Replacement                        20 or More Yrs     5 to 9 Years
    New Project/Item (not on last year's 5-Yr, Plan)      x 10 to 19 Years      3 to 4 Years


 Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
    Will Reduce Cost by $                         Wil l Produce Addle Revenue by $
  x No Impact                                   x Revenue Neutral (no impact)
    W il l Increase Cost by $                  _Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)




  FORM 8 -FISCAL 2011

Source page 148

Engineer's Opinion of Probable Construction Cost

Item                                                                                                                 Cost
Modify pilot system on exist. 12-inch valve                                                                          $       2,500
Modify pilot system on exist. 4-inch valve                                                                           $       2,500
Refurbish rubber parts inside 12-inch valve                                                                           $      1,000
Refurbish rubber parts inside 4-inch valve (looked very new so likely not needed)                                     $        300
 I nstall new digital controller for 12-inch valve                                                                    $      5,500
 I nstall new digital controller for 4-inch valve                                                                     $      5,500
 Labor for all of the above (5 days @ $1,200 per service rep/day)                                                     $     12,000
New Electrical Box (labor and material)                                                                               $     Z0,000
SCADA upgrades to support new valves and new communications wiring from exist. valve vault to exist. elec/comm box    $     10,000
Contractor Coordination with SCADA and Electric                                                                       $      Z,500
Construction of electrical upgrades (in lieu of existing conduit between the vault and the control panel)             $      5,000


SCADA programming to write rules and screens for Town to control the new valves                                      $      10,000
I<leinfelder's time for design/bidding/construction oversight                                                        $      35,000
Design of electrical upgrades to support new valves and construction administration                                  $      25,000
Elevation survey of level transducers at (5) water storage tanks and (1) pressure transducer at MWRA vault           $       3,000
Electrical Permitting                                                                                                $       3,000
Wetlands Permitting                                                                                                  $       5,000



Construction Equipment Costs                                                                                         $       66,800
Overhead and Profit                                                                                                  $       13,360
Engineering and Design Costs                                                                                         $       81,000
Construction and Design Total                                                                                        $      161,160
Contingency %                                                                                                                   Z5~
Contingency Cost                                                                                                      $      40,290
Total Project Cost                                                                                                    $     201,450

Source page 149

'~                            i                                   1

                                                                                                                                                                   _,, ,~~
       o, ~ -,-
                                                                                                                                                                    ~           '~                        4
                    c~          i~J                                                                       777


                                                                                                                                                                   ~~                         ~ II~
        ___ ~__-
                ------- -__                                              ~
                                                                         o                                                         f
                                                                                                                                       ~,                            ~~
                                                                                                                                                                                              ~          __,_


                                                                                                                                                                                                  12"A   S
                                                                                                                                                                   r    ~   i        H1
                                                                                                                                                                   _    i ~ i
                                                                                                                                                                                              i--      ---      -
                                                                                        —       ~_       _~--"'"                                           ~t           1
                                                                                            l


                                                                         ,~ r =.                                 ..

 ____                 _ ----- — —~--" EXISTING TRANSMISSION                                                                                     ~~ ~~ ~~~
                                                                                                                                                        E --~~    —~~ ~       t~~2,~,
                     _~                 MAIN TO ELM STREET                                                    "~       ~ ~.~—              ~'                                         -r
                                                                                                                                                  ~~- PROPOSED ELECTRICAL CONDUIT'H'~';




                                                               Q-                               o                           ~. I                                        PROPOSED CONTROL CABINET
                                 ~                                                                                                                                                                 ~

                    ~ ~:~ ,~~~~ ~~~+ I,~~.. ~~~`~, 4~~~ tis                          NpU~.~                                            ~        '~~              EXISTING ELECTRICAL BOX,

   ,4 ~f``~              ~   ,~ +, t I~ ,,, ,'~'`~,'~~~                                                                                                     EXISTING TOWN OF CANTON
  ~~~~,.1 ~ ~                ~                  ~, ~~1,                                  ~\                                                                 PRESSURE REDUCING VALVE                           ,tea
~1~, i' ''~,~             ~,   ti  1'  ~~'.1'~~
                                           '~'~~('' ~                                ~~~~,~ -`"~'~'`~.                                                   ~— VAULT TO BE UPGRADED                             ~~


              ~' ~, ~          ~ 1 7~ ~,                        ~'' ~'
                                                              ~,~ti~,'          ,~                `' ~          i~~~                                             \~ i
                                                                             ~,'-'`~~           ~ ~'~    ``   ~c                                                            ~

         ti                                                   ~.,                                                                                                           1

                1                           1                       •'           -.~        ~      s      ~ ~ 1 V.   ~ ~1                                                                 i


                                                VANE VAULT LOCATION SITE PLAN                                                                                       SCALE: 1" = 40'
                                                                                                                                                                                     40SCALE IN FEET$~
                                                                                                        PLAN
                                                                                                        SCALE: 1"=40'

Source page 150

TOWN OF CANTON
                                     FORM B -FISCAL 2020
                        CAPITAL PROJECT /EQUIPMENT REQUEST

  DEPARTMENT:                                              SUBMITTED BY:
       Public Works (Water Enterprise)                                Michael Trotta


  PROJECT /EQUIPMENT TITLE:
                    Water System Management Plan - Year 1 CIP


 TOTAL PROJECT / EQUIPMENT COST:
                                               $830,000

 DESCRIPTION:
Develop design plans and specifications for water distribution system improvements as
detailed in Year 1 of the Water System Management Plan 2018 Update.




  PURPOSE AND ]USTIFICATION:
A distribution system must have sufficient capacity to provide adequate service pressure while meeting
the demands of consumption and fire protection. While the service pressure throughout Canton's
system is good, deficiencies exist in main size, line continuity, fire flow availability. The CIP was
developed to correct existing deficiencies and to meet future demands.



  NEED CLASSIFICATION:(Check a// that apply)            Departmental Priority Ranking:
     Required for Safety                                  Please rank this request out of your total
     Required by Law or Mandate                           requests for this year:(#1 as top priority)
    Improve/Expand Service or Increase Efficiency                 2 (#) OF           ~ ~l(#)

  x Planned Project or Replacement                     Expected Useful Life: (Check one)
    U nplanned Project or Replacement                  x 20 or More Yrs      5 to 9 Years
    New Project/Item (not on last year's 5-Yr. Plan)   _ 10 to 19 Years      3 to 4 Years


 Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
    W ill Reduce Cost by $                        Will Produce Addle Revenue by $
  x No Impact                                   x Revenue Neutral (no impact)
    Will Increase Cost by $                    _Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)




  FORM 8 -FISCAL 2011

Source page 151

improvement programs were evaluated in tandem to coordinate 5-year unprovements for both. Maps

                presenting the phased 5-Year recommended improvements for water mains and pavement are presented in
                Appendix F.


                6.7.1 Year One Capital Improvements Costs

                                              Table 6-2 -Year One Capital Improvements

                 S stem and Pro'ect                                   Estimated Costs         Notes
                   Facilities/Other                               $             525 210
     ---~
            ~        Leak Detection Pro atn                       $               20,000      Twice-annual
                     Master Meter Calibration                     $                 3,000     Calibrate master meters annuall
                     Neponset Street WTP GAC Filter Media
                 Re lacement & GAC Tank Im rovements              $              110,010
                                                                                              Canton has pumped above the
                                                                                              calculated permit baseline in 2015
                                                                                              and 2016,(most likely due to
                                                                                              undetected leaks). However, Canton
Y~      ~                                                                                     is also projected to grow and to
                     Prepare a Minimization(and Mitigation)                                   exceed its pernut allocation by 2022
                Plan under the revised WMA Re ularions            $                       -   ifin the ve near future
                                                                                              The Town should review existing
                                                                                              agreements with neighboring water
                                                                                              systems related to emezgency
                                                                                              interconnections. In the case of a
                                                                                              water system emergency like an
                                                                                              issue with the MWRA connection
                                                                                              or a major water main break, the
                                                                                              Town may need to draw water from
                                                                                              another water system. This
                                                                                              arrangement should be reviewed,
                                                                                              and a procedure developed (along
                    Review existing agreements with                                           with any necessary infrastructure
                neighboring water systems related to                                          additions) to enable emergency
                emer enc interconnections                         $                 5,000     connections.
                                                                                              Conservation outreach program to
                     Water Conservation Outreach Pro am           $                10,000     residents
                                                                                              increase the maintenance frequency
                                                                                              to annually or no longer than every
                                                                                              2 years based on available well
                     Well Rehabilitation                          $              125,000        erformance trends
                     MWRA Water Quality Improvement                                           Restrict flow from MWRA during
                 Valve                                            $              202,200        eak demand and reduce water a e
                                                                                              Address production limitations of
                                                                                              the Neponset and Pecunit Water
                                                                                              Treatment Plants to find a way to
                                                                                              increase production from local
                     Water Treatment Plant Improvements (for                                  sources. Address Neponset Plant
                Increased Production                              $                50,000     Membrane foulin issues.
                   Main                                           $             829 260


                                                                                                                 ENGINEERING     ()-2
            G:\ CLIENTSICANTON MA~20140151.00lA - IWRM-CIP~DOCLTMENTS\7.0 YEAR 4 TASKS\73 WATER CAPITAI,PLANNING2018-10-31;DOC
                        \         MASTER  PLAN   FINAL DRAFT  TO CLIENT_OCT 20181CANTON HATER MASTER  PLAN FINAL
            EVALUATIONS WATER
            20140151.00lA

Source page 152

I~
                                                                                                                                           ~ ~
                                                                                            Notes                                           c~
                                             ~                     Estimated Costs
      S stem and Pro'ect                                                                                                                    a
            Ded  ham  Stre et bin Repl acem ent (with                                                                                        '
                                                                                                                                            `k
                                                               $                72,941                                                      a
      street reconstruction - Desi
                                                     h
            Edwards St/Barbara Rd bin FF (wit                                   83,943
                               - Desi                          $
      street reconstruction
                                                     (with
            Elm Street(I~ 6in FF Replacement                                   160,910
                            on - Desi                          $
      street reconstructi
                                                     (with
            Elm Street(S) bin FF Replacement                                    43,006
                                                               $
  O   street reconstnzction) - Desi
                                                         h
 ~~         Elm Street(S) Main Replacement (wit                                  75,261
                            on - Desi                          $
       street reconstr ucti
                                                   t
cry          Highland Street bin FF (with stree                                  87,023
                                                               $
 ~b    reconstruction - Desi
                                                   ial:
~n           Hillview/AutumCircle bin FF (Part                                   89,859
                                                - Desi         $
       1900 ft with street reconstruction
             Pond Street bin FF(with street                                      35,344
                                                               $
       reco nstr uction - Desi
                                                     t
             Pond View Road bin FF(with stree                                    46,492
                                                               $
       reconstruction - Desi
             Turnpike St 12in DI(1906) Main                                      95 732
                                                               $
        Re lacement av not included - Desi
                                                         not
             Turnpike Street bin Replacement(pav                                 38,749
                                                       ~       ~
        included - Desi
                                                               $               463,918
        Tank
           Neponset Street Tank - Contracted                                      20,062     Re airs, ins ection
                                                               $
       Maintenance
                                             nce                   $               7 873     Re airs, ins ection
           Tolman Tank -Contracted Maintena
           Indian Lane Spheroid -Contracted                                      189,217      Coatin ,re airs Suez, 2018
                                                                   $
       Maintenance &Renovations
           Randolph Tank - Contracted                                            246,766      Coatin ,re airs Suez,2018
                                                                   $
       Maintenance &Renovations
                                                                   $          1 Si8,388
        Year 1 Total


                                                           nts Costs
      6.1.2 Year Two Capital Improveme

                                                                       Improvements
                                           Table 6-3 -Year Two Capital

                                                                           Estimated Costs           Notes
        S stem and Pro'ect
                                                                   $                   158 000
        Facilities/Other                                                                             Twice-annual
                                                                       $                  20,000
              Leak Detection Pro am                                                                  Calibrate master meters
                                                                       $                  3,000      annuall
              Master Meter Calibration                                                               Conservation outreach
                                                                       $                   10,000     ro am to residents
                                               am
               Water Conservation Outreach Pro                                                       increase the maintenance
                                                                                                     frequency to annually or no
                                                                                                     longer than every 2 years
                                                                                                     based on available well
                                                                                          125,000      erformance trends
                                                                       $
               Well Rehabilitation

                                                                                                                   ENGINEERING       C-3
                                                                                     S\73 WATER CAPITAL PLANNING
                        ON MA~20 14015 1.00l A - IWRM -CIP~DOCUMENTS\7.0 YEAR 4 TASK          R MASTER PLAN FINA L 2018- 10-31.DOC
        G:\ CLIENTS\CANT                                                         \CANTON WATE
                       WATE R MAST  ER  PLAN    FINA L DRAF'C TO CLIENT OCT 2018
        EVALUATIONS\
        20140151.00lA

Source page 153

TOWN OF CANTON
                                     FORM B -FISCAL 2020
                        CAPITAL PROJECT /EQUIPMENT REQUEST

  DEPARTMENT:                                              SUBMITTED BY:
       Public Works(Water Enterprise)                                Michael Trotta


  PRO]ECT /EQUIPMENT TITLE:
               Integrated Water Resources Management Program -Year 5


 TOTAL PROJECT / EQUIPMENT COST:
                             $200,000 (Water Portion)

  DESCRIPTION:
A 5 year plan to implement a data driven integrated approach to managing the Town's water,
wastewater, and storm water infrastructure that utilizes technologies to deliver a sustainable
Asset Management System. Asset Management can be identified as a data driven practice
that weighs asset related decisions and activities to achieve a balance of cost, risk, and


  PURPOSE AND JUSTIFICATION:
The Integrated Water Resource Management Program is designed to use a risk based approach that will
allow the Town to make smarter investments, achieve greater efficiency, and be less vulnerable to
regulatory risk or "management by crisis". The initiative will keep Public Works focused on abandoning
the traditional reactive way of conducting operation and establishing a culture of asset management that
is centralized, automatized, efficient, and sustainable.


 NEED CLASSIFICATION:(Check a// that apply)             Departmental Priority Ranking:
    Required for Safety                                   Please rank this request out of your total
    Required by Law or Mandate                            requests for this year:(#1 as top priority)
   Improve/Expand Service or Increase Efficiency                  3 (#) OF           ~ ~~(#)

  x Planned Project or Replacement                      Expected Useful Life: (Check one)
    U nplanned Project or Replacement                      20 or More Yrs    5 to 9 Years
    New Project/Item (not on last year's 5-Yr. Plan)    x 10 to 19 Years      3 to 4 Years


 Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
    W il l Reduce Cost by $                       Will Produce Addle Revenue by $
  x No Impact                                   x Revenue Neutral (no impact)
    Will Increase Cost by $                    _Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)




  FORM 8 -FISCAL 2011

Source page 154

(Canton, MA -Proposed Tasks for IWRM-CIP Year 5

 Task Description                                          Purpose /Benefit                                                               Summary of Deliverables                                              Budget

  1    Asset Inventory                                     Update the data in the Town's GIS for     •GIS database updates for drinking water, sewer, and stormwater systems based on digitized paper $
                                                           improved completeness and accuracy        records and field data collection                                                                           30,000
                                                                                                     •Meetings with DPW Staff, meeting materials including Technical Memorandum
                                                                                                     2.1 Water
                                                                                                     •Water main condition assessment and sampling
                                                                                                     •Revisions to the water main forecast model based on the results of the condition assessment
                                                                                                     2.2 Sewer
      Field Condition Assessment: Criticality Analysis and Collect data to provide abottom-up        •Sewer manhole inspection form development and field-based training. This budget assumes 80
  2                                                        approach to capital planning for critical  hours in Kleinfeldersupport and 800 hours of Town staff time for inspections
      Useful Life                                                                                                                                                                                          $    135,000
                                                           water, sewer, and pavement assets         •Condition scores, estimated service life, and replacement costs for inspected sewer assets
                                                                                                     2.3 - Stormwater
                                                                                                     •New or updated stormwater infrastructure inspection forms
                                                                                                     •Condition scores, estimated service life, and replacement costs for sewer assets inspected
                                                                                                     2.4 -Pavement
                                                                                                     •Collect pavement condition data and convert to PCI scores
                                                                                                     'Priority list of water main, sewer gravity main, drainage pipe, and pavement assets including a
  3   Priority List of Water, Sewer, and Stormwater Assets Interpret condition data and summarize    renewal and replacement needs and costs
                                                           costs for improvement projects                                                                                                                  5     20,000
                                                                                                     •U dated GIS database with risk scores failure robabilities and criticali factors
                                                                                                     •Meeting materials
                                                           Assess the impacts of capital             •Short-term and long-term financial plan for the Town's water and sewer utilities based on existing
  4   Annual Charge System Cost                                                                      and future costs of operating the system with recommendations for cost changes to the rate charge
                                                           improvments on water and sewer rates                                                                                                            $     30,000
                                                                                                     system.
                                                                                                     -Rate model that can forecast revenue needs and calculate rate impacts on customer.
                                                           Provides the DPW with work management     'Cityworks   Annual License
                                                           and  data collection software             'API connecting WebQA's Citizen Requests with Cityworks' Service Request module
  5   Asset Management Software, Hardware, and Training                                  and
                                                           additional training to continue           •3 days of Cityworks trainings                                                                        $     70,000
                                                           implementation across divisions           .Up to 60 hours to coordinate and support the configuration of work management and inspection
                                                                                                     forms and re orts For levels of service and re ulato re ortin needs
                                                           Support the completion of requirements    'Annual  Report Support
  6   Stormwater MS4 Compliance Services                                                             •Stormwater Management Plan (SWMP) Updates
                                                           for MS4 Permit                                                                                                                                  $     25,000
                                                                                                     •Task Force Meetings

  7   Water Management Act Permitting Support              Prepare Town for Renewal of WMA Permit •Prepare Minimization 8 Mitigation Plan as required by WMA Regulations
                                                                                                                                                                                                           $     20,000

                                                                                                     •Client meetings
      Client Meetings, Year 5 Report, Public Outreach, and                                           •Updated Asset Management Plan 8 Year 5 Report
  $   Project Administration                               Project Management                                                                                                                                    SO,ODO
                                                                                                     •presentation materials for a Public Meeting                                                          $
                                                                                                     •Public education brochure
  9   Additional IWRM Year 5 Implementation Tasks /
      Contingency                                          gdditional Services as required by DPW    •Placeholderfor as-needed requests                                                                    $     15,000
Ca ital Re uest - IWRMP Year 5
                                                                                                                                                                                                           S    395 000
      Potential Grant fundin of 5150 000

Source page 155

TOWN OF CANTON
                                    FORM B -FISCAL 2020
                         CAPITAL PROJECT /EQUIPMENT REQUEST

  DEPARTMENT:                                             SUBMITTED BY:
           Public Works (Water)                                     Michael Trotta


  PROJECT /EQUIPMENT TITLE:
                      Water Sewer Storage Buildings Demolition


 TOTAL PROJECT /EQUIPMENT COST:(must be at least $5,000.)
                                  $185,000

 DESCRIPTION:
Raze Water Sewer Storage Building and Springdale Water Storage Well at Pine Street.




  PURPOSE AND JUSTIFICATION:
Building and well were constructed in 1888. Both structures were declared of no use by Public Works,
posted as unsafe. Brick masonry walls are structurally deficient, pose a danger. Gable end wall is
pulling from roof and building envelop. Second floor has been condemned as unsafe. Extensive repairs
approaching $2,000,000 are required for safe occupancy.



 NEED CLASSIFICATION:(Check a// that apply)            Departmental Priority Ranking:
 x Required for Safety                                   Please rank this request out of your total
    Required by Law or Mandate                           requests for this year:(#1 as top priority)
   Improve/Expand Service or Increase Efficiency                 4 (#) OF               4 (#)

  x Planned Project or Replacement                     Expected Useful Life: (Check one)
    U nplanned Project or Replacement                  x 20 or More Yrs      5 to 9 Years
    New Project/Item (not on last year's 5-Yr. Plan)      10 to 19 Years     3 to 4 Years


 Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
    Will Reduce Cost by $                         Will Produce Addle Revenue by $
  x No Impact                                   x Revenue Neutral (no impact)
    Will Increase Cost by $                    _Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)




 $185,000 Water Sewer Bldg Demo

Source page 156

Town of Canton, Massachusetts
                               PUBLIC WORKS DEPARTMENT
.
.

~-^                                  MEMORIAL HALL
                                 801 WASHINGTON STREET
                                    CANTON, MA 02021




Demolition Estimate - 40 Pine St. Water /Sewer Storage Building



Building Demolition                       65,000

Haz Mat Abatement                         12,000

Springdale Well Demolition                100,000

Remove water work                         8,000



                                          185,000

Source page 157

r



                                      ~os~~~,LQ
                                           D ISMANTLING

                                                                                        June 6th, 2018

 Attn:   Mr. Steven Choiniere                                                        PH:(781) 821-5051
         Town of Canton Facilities                                                  CL:(781)562-9224
         810 Washington St.
         Canton, MA 02021                                                schoiniere@town.canton.ma.us

 From: John Costello                                             PH:(508) 291-2324
       Costello Dismantling Co., Inc,                          Cell: (508)958-9242
       45 Kings Hwy.                                            Fax.(508) 291-2325
       W. Wareham, MA 02576                          IohnC~costellodismantlin~.com
 BUDGET: Demolition of 44 Pine St. Water pepartment Building

Thank you for the opportunity to send you this budgetary proposal for the demolition of
the former Water bepartment building located at 44 Pine St.

One of the most important first steps to accurately forecasting demolition project is
obtaining an environmental survey. This will give you an understanding of any
environmental abatement that needs to take place prior to demolition or additional
disposal expense that may be needed. Environmental contaminants that may be tested
for and quantified include asbestos, lead and other metals, PCBs, and oils.

Scope of Work:
   •     Dismantle brick and timber building to grade. Foundations and footings to remain.
   •     Dismantle roof of sunken water tank and sidewalls to grade.
   •     Lawful disposal of all building materials generated during demolition,

Specific exclusions:
   •     Utility disconnects, including electrical, water, sewer, gas.
   •     Environmental surveys and abatement.
   •     Erosion control plans or implementation.
   •     Backfill.
   •     Dewatering/pumping holding tank,

Normal working hours are 7-3.30 Monday-Friday. Demolition work is anticipated to tale
one week,

Base Bid. Sixty Five Thousand Dollars ($65,000.00)

Please let me Know how we can be of further assistance on this project.

John Costello


                   45 King's Highway ~ W. Wareham, MA 02576
                   U i t ~ci (508) 291-2324 ~ 1=,,.x (508} 297-2325
                              w ww. ~:c~sl C I. I.UU~SM~6! i LIhJG. CUM

Source page 158

Trotta, Michael

From:                          Aspinwall, Charles
"ent:                          Friday, November 09, 2018 11:51 AM
 o:                            Trotta, Michael; Choiniere, Steven
Subject:                       FW: PMEC Report -Water Works Building inspection
Attachments:                   PMEC Canton Water Works 40 Pine St Asbestos Inspection Rpt 09Nov18.pdf



FYI


Charles J. Aspinwall
Town Administrator
801 Washington St.
Canton, MA 02021
781-821-5000 Office


From: Paul Matuszko [mailto:pmatuszko@pmecsolutions.com]
Sent: Friday, November 09, 2018 11:49 AM
To: Aspinwall, Charles
Cc: Choiniere, Steven
Subject: PMEC Report -Water Works Building inspection

H i Charlie:
 attached my completed Water Works Building inspection report for your review and use. Feel free to comment as
  ceded. The Executive Summary might be a good place to start.

 did find some items to be abated/recycled. To be safe, I've estimated up to 12K for the abatement work. But, I think it
can get done for under 10K.

Regards,
Paul

Paul Matuszko, CIH, CIEC
Paul Matuszko Environmental Consulting
79 Cedar Street
Walpole, MA 02081
Cell (617) 893-,4476
www.~mecsolutions.com

Source page 159

Canton MA                                                    ESTIMATE OF PROBABLE                     13-Dec-17
Springdale Well Decommissioning                               CONSTRUCTION COST
Item                                                  Unit       Quantity        Unit Price      Total Amount
Mobilization 5%                                        LS           1               $4,587.50          $4,588.00
Demo/Disposal -Roof                                    LS           1               $5,000.00          $5,000.00
Demo/Disposal -Well 5' Below Grade                     LS           1               $5,000.00          $5,000.00
Electrical Decommissioning                             LS           1               $2,500.00          $2,500.00
Stone Fill of Well                                    CY           750                 $55.00         $41,250.00
Gravel Fill                                           CY           2.00                $45.00          $9,000.00
Loam and Seed                                         CY            40                 $50.00          $2,000.00
Site Restoration                                       LS           1               $2,000.00          $2,000.00
Misc. Building Brick Repair/Patch and Waterproofing    LS           1               $5,000.00          $5,000.00
Erosion Control                                        LS           1               $8,000.00          $8,000.00
Well Dewatering Including Settling Tanks, Discharge
Piping, Existing Well Pipe Removal/Capping             LS           1              $12,000.00         $12,000.00
                                                                          Total Estimated Cost        $96,338.00

Source page 160

TOWN OF CANTON
                                     FORM B -FISCAL 2019
                        CAPITAL PROJECT /EQUIPMENT REQUEST

  DEPARTMENT:                                              SUBMITTED BY:
       Public Works (Sewer Enterprise)                               Michael Trotta


  PROJECT /EQUIPMENT TITLE:
               Integrated Water Resources Management Program -Year 5


  TOTAL PROJECT /EQUIPMENT COST:
                            $200,000(Sewer Portion)

  DESCRIPTION:
A 5 year plan to implement a data driven integrated approach to managing the Town's water,
wastewater, and storm water infrastructure that utilizes technologies to deliver a sustainable
Asset Management System. Asset Management can be identified as a data driven practice
that weighs asset related decisions and activities to achieve a balance of cost, risk, and


  PURPOSE AND JUSTIFICATION:
The Integrated Water Resource Management Program is designed to use a risk based approach that will
allow the Town to make smarter investments, achieve greater efficiency, and be less vulnerable to
regulatory risk or "management by crisis". The initiative will keep Public Works focused on abandoning
the traditional reactive way of conducting operation and establishing a culture of asset management that
is centralized, automatized, efficient, and sustainable.


 NEED CLASSIFICATION:(Check a// that app/y)             Departmental Priority Ranking:
    Required for Safety                                   Please rank this request out of your total
   Required by Law or Mandate                             requests for this year:(#1 as top priority)
   Improve/Expand Service or Increase Efficiency                  1 (#) OF               1 (#)

  x Planned Project or Replacement                      Expected Useful Life: (Check one)
    U nplanned Project or Replacement                      20 or More Yrs    5 to 9 Years
    New Project/Item (not on last year's 5-Yr. Plan)    x 10 to 19 Years     3 to 4 Years


 Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
    Will Reduce Cost by $                         Will Produce Addle Revenue by $
  x No Impact                                   x Revenue Neutral (no impact)
    Will Increase Cost by $                    _Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)




 FORM 8 -FISCAL 2011

Source page 161

Canton, MA -Proposed Tasks for IWRM-CIP Year 5

Task Description                                           Purpose!Benefit
                                                                                                                                           Summary of Deliverables                                              Budget
  1    Asset Inventory                                     Update the data in the Town's GIS for      •GIS database updates for drinking water, sewer, and stormwater systems
                                                           improved completeness and accurecy                                                                                 based on digitized paper $
                                                                                                      records and field data collection                                                                           30,000
                                                                                                     •Meetings with DPW Staff, meeting materials including Technical Memorendum
                                                                                                      2.1 Water
                                                                                                     •Water main condition assessment and sampling
                                                                                                     •Revisions to the water main forecast model based on the results of the
                                                                                                                                                                              condition assessment
                                                                                                      2.2 Sewer
      Field Condition Assessment: Criticality Analysis and  Collect data to provide abottom-up       •Sewer manhole inspection form development and field-based training. This budget
  2                                                                                                                                                                                       assumes 80
      Useful Life                                          approach to capital planning for critical  hours in Kleinfelder support and 800 hours of Town staff time for inspections
                                                           water, sewer, and pavement assets                                                                                                                $    135,000
                                                                                                     •Condition scores, estimated service life, and replacement costs for inspected sewer
                                                                                                                                                                                           assets
                                                                                                      2.3 - Stormwater
                                                                                                     •New or updated stormwater infrastructure inspection forms
                                                                                                     •Condition scores, estimated service life, and replacement costs for sewer
                                                                                                                                                                                assets inspected
                                                                                                      2.4 -Pavement
                                                                                                     •Collect pavement condition data and convert to PCI scores
                                                                                                     'Priority list of water main,sewer gravity main, dreinage pipe, and pavement assets including
  3   Priority List of Water, Sewer, and Stormwater Assets Interpret condition data and summarize                                                                                                   a
                                                           costs for improvement projects             renewal and replacement needs and costs
                                                                                                                                                                                                            S     20,000
                                                                                                     •U dated GIS database with risk scores failure robabilities and criticali factors
                                                                                                     •Meeting materials
                                                           Assess the impacts of capital             •Short-term and long-term financial plan for the Town's water and sewer utilities based
  4   Annual Charge System Cost                                                                                                                                                              on existing
                                                           improvments on water and sewer rates       and future costs of operating the system with recommendations for cost changes to
                                                                                                                                                                                          the rate charge   5     30,000
                                                                                                     system.
                                                                                                     •Rate model that can forecast revenue needs and calculate rate impacts on customer.
                                                           Provides the DPW with work management ~Cityworks Annual License
                                                                                                     'API connecting WebQA's Citizen Requests with Cityworks' Service Request module
  5   Asset Management Software, Hardware, and Training and data collection software and
                                                           additional training to continue           •3 days of Cityworks trainings
                                                                                                                                                                                                            §     70,000
                                                           implementation across divisions           .Up to 60 hours to coordinate and support the configuration of work management and
                                                                                                                                                                                            inspection
                                                                                                     forms and re orts for levels of service and re ulato re ortin needs

  6   Stormwater MS4 Compliance Services                   Support the completion of requirements 'Annual Report Support
                                                   -       for M54 Permit                            •Stormwater Management Plan (SWMP)Updates
                                                                                                                                                                                                            $     25,000
                                                                                                     •Task Force Meetings

  7   Water Management Act Permitting Support              Prepare Town for Renewal of WMA Permit •Prepare Minimization &Mitigation Plan as
                                                                                                                                                required by WMA Regulations                                 5    20,000

                                                                                                     •Client meetings
  6   Client Meetings, Year 5 Report, Public Outreach, and
                                                           Project Management                        •Updated Asset Management Plan ~ Year 5 Report
      Project Administration                                                                                                                                                                                $    50,000
                                                                                                     •Presentation materials for a Public Meeting
                                                                                                     •Public education brochure
  9   Additional IWRM Year 5 Implementation Tasks /
      Contingency                                          gdditional Services as required by DPW    •Placeholderfor as-needed requests
                                                                                                                                                                                                            $    15,000
Ca ital Re ueat - IWRMP Year 5
                                                                                                                                                                                                            S   395 000
      Potential Grant fundin of 5150 000