Skip to content
Search Canton

Canton, Massachusetts · Saved source text

Article 43 Motion 2 - Dept. 840 - Blue Hills Regional Technical School.pdf pdf file

Town Meeting · Town Meeting archive year 2022 · Record 90cfc7b6435d26c4d5

Open original municipal record ↗Open interactive reader

Saved text from 80 source pages. Transcription and OCR may contain errors; verify figures and wording against the original. Retrieved 2026-10-15.

Source page 41

Mission Statement
Blue Hills Regional Technical School's mission is to continue its history of academic achievement,
technical training and character development through a curriculum that emphasizes the integration of
cutting‐edge technical programs and challenging academic courses while enabling its students to
become competent, caring and productive people in a diverse and changing world.

Vision Statement
To be the premier secondary-level technical training and college-preparatory institution in the state of
Massachusetts. In keeping with industry standards and emerging technologies, we aim to increase our
leadership in the development of world-class Career and Technical graduates who are highly sought for
both employment and higher education.

Core Values:
Blue Hills is committed to:

Community
    ● Creating an atmosphere of mutual respect through collaboration, inclusion, and relationships.
Opportunity
    ● Offering various diverse opportunities where ALL students can reach their full potential both in
       and out of the classroom.
Relevance
    ● Providing a relevant, high quality, cutting-edge, and innovative education that promotes
       individual growth for the future.
Employability
    ● Uniquely preparing our students for the many possible college and career pathways.

Theory of Action:
If we ensure dynamic and equitable teaching and learning, foster a positive and supportive climate and
culture, establish a proactive and responsive system of communication, and provide relevant and
personalized professional development, then students at Blue Hills will become competent, caring, and
productive people in a diverse and changing world.

Four Pillars of Success:
   1. Dynamic & Equitable Teaching & Learning
             o Strategic Objective: Establish & implement a curriculum that fosters instructional
                 practices that meet the social, emotional, academic, & vocational needs of all students.
   2. Positive and Supportive Culture and Climate
             o Strategic Objectives:
                     ▪ Improve diversity among staff & faculty.
                     ▪ Foster diversity & equity in all academic & vocational programs.
   3. Proactive & Responsive Communication
             o Strategic Objective: Establish a cohesive communication plan that addresses
                 procedures to effectively engage all stakeholders in the school’s success.
   4. Relevant & Personalized Professional Development


                                                                                                            4

Source page 42

o   Strategic Objective: Ensure professional development is relevant, current and
                individualized.

In addition to the Strategy Plans Four Pillars of Success, the 2023 Budget will allocate financial
resources to achieve the following goals:

            o   Financial Goal-To identify, secure and responsibly manage district financial resources to
                effectively and adequately support educational objectives of the district. Continue to
                work to maximize student achievement and social emotional data to identify and
                prioritize needs so that funding decisions can best inform budget development.

            o   School Building Goal-Maximize operational efficiency created by our renovation project
                through the establishment of a comprehensive maintenance plan for existing facilities as
                well as continue to create a safe/healthy environment in response to the COVID-19
                pandemic and CDC guidelines.

            o   Equity and Access-Provide all students with rigorous and culturally relevant curriculum,
                resources and programs that support their individual goals and ensure that all students
                gain knowledge and skills to be productive community members after high school

            o   Student Engagement-Provide meaningful professional learning for all staff in order to
                create engaging learning opportunities for the benefit of all our students

            o   Communication & Community Relations-To engage in advance planning, with staff and
                community, in order to achieve the greatest educational returns in relation to dollars
                expended. While improving community outreach efforts between the district and all
                stakeholders

      Specific actions related to each goal and Pillars of Success are outlined later in the booklet.




                                                                                                            5

Source page 43

This page intentionally left blank


             Notes




                                     6

Source page 44

Education with Purpose
At Blue Hills, we are committed to our students and community. Today’s technical high schools put equal emphasis on
academic achievement and vocational proficiency. These are not separate goals. Teachers at Blue Hills understand that
the two combine to drive our students toward successful post-high school careers and endeavors, and that they set the
foundation for a prosperous and meaningful adult life in the workforce and to thrive in a post-pandemic world.
The 2023 budget focuses on building a district that is dedicated to the success of all Blue Hills students who are children
of the pandemic and meeting their needs including social emotional needs and addressing achievement gaps. This
budget is based on our Core Values and our Pillars of Success, recently approved in our multi-year Strategy Plan.




Academic Achievement as Measured by MCAS

For the school year 2021, the Massachusetts Department of Elementary and Secondary Education has classified Blue Hills
as making substantial progress towards improving academic achievement. In 2019, the last year for which MCAS results
were reported (due to COVID-19), Blue Hills Regional Vocational Technical School met or exceeded expectations in the
grade 10 English Language Arts evaluation 54% of the time. In mathematics, 49% of students met or exceeded
expectations, and in science, 74% of students scored proficient or higher. As a school, this data is useful in understanding
how close our school is to helping all students meet proficiency on the standards. The data also helps us identify areas
where our students are doing well academically as well as where they need extra support. Additionally, teachers and
administrators review state data and identify areas where students have mastered a subject, where students need more
help, and where educators need to adjust their lesson plans, materials, or approach in order for students to meet the
standards.

Currently, the Department of Elementary and Secondary Education designates our school as making “Substantial
Progress towards Targets.” The next accountability update regarding targets and lowest performing student group
information will be made from DESE in 2022. Below are the grade 10 student achievement levels for the 2021 Next

                                                                                                                              7

Source page 45

Generation MCAS in ELA and Mathematics as well as the grade 10 student achievement levels for the prior two years of
the Legacy MCAS for ELA and Mathematics.




                                             English Language Arts
                    Percent of Students at Each Achievement Level 2019/2021 Comparison




                                                 Mathematics
                    Percent of Students at Each Achievement Level 2019/2021 Comparison




                                                                                                                       8

Source page 46

In order to raise the achievement level on the MCAS, Blue Hills currently provides after school preparation classes for
English Language Arts and mathematics. These classes focus on providing students test-taking strategies as well as giving
students practice in those domains through remedial help. Starting the second semester, we will also be offering before
and after school tutoring. These general tutoring sessions will give our students another avenue to become proficient in
their grade-level standards. Finally, this year our teachers have been working with the Department of Elementary and
Secondary Education’s Acceleration Roadmap model. The Acceleration Roadmap is a way to close achievement gaps due
to the pandemic in which students receive consistent access to grade-level work with targeted scaffolds to make it
accessible. Traditionally, using the remediation model, students mainly receive work better suited for earlier grades, with
the understanding that they must master all past concepts before accessing grade-level work. The exploration and use of
the new Acceleration Roadmap will help educators understand more closely which teaching strategies might be most
effective in post-pandemic education. It also helps educators better understand the supports needed to help students
recover from the challenges brought-on from the pandemic, which are required for scaffolding strategies and just-in-time
supports as outlined in the Roadmap.



                                 Addressing the 2023 Budget Goals and Pillars of Success

Financial Goal: To identify, secure and responsibly manage district financial resources to effectively and adequately
support educational objectives of the district. Continue to work to maximize student achievement and social
emotional data to identify and prioritize needs so that funding decisions can best inform budget development.

The first challenge in the budgeting process the district faces each year is assessing the impact of costs that are beyond
the control of the day-to-day decision process. As in any public entity, those costs are typically related to employee
benefits, utility charges, cost of insurance, state and federal mandates and debt repayment associated with capital
projects. In FY21 and FY22 the district focused on a multitude of data gathering from stakeholder surveys and examining
data sprints pertaining to student achievement. With this information, we are able to determine if there are additional
needs of our students and staff and we are able to directly allocate our budget funds to address those known needs.

School Building Budget Goal: Maximize operational efficiency created by the renovation project through the
establishment of a comprehensive maintenance plan for existing facilities as well as continue to create a safe/healthy
environment in response to the COVID-19 Pandemic and CDC guidelines.

In November of 2019, we reached substantial completion with the renovation project. The newly modernized HVAC
system came just in time for the global pandemic and made the building safe to occupy as we added MERV13 filters and
the ability to cycle in outside air to keep staff and students safe. In the winter of 2020, the district began entering into a
number of service contracts to keep the facility in prime occupational condition. Ideally, the efficiencies created by the
new systems will generate savings in the future necessary to cover any added maintenance costs. However, some capital
projects were not included in the renovation project and will need to be prioritized with a capital project plan. In 2021
the district completed an upgrade to the west side stairwell. In fiscal year 2023, we plan on working on some additional
projects such as the athletic bleachers, additional security cameras, and adding additional cooling coils to the gym and
LPN (Licensed Practical Nursing) department.

Equity and Access Budget Goal: Provide all students with rigorous and culturally relevant curriculum, resources and
programs that support their individual goals and ensure that all students gain knowledge and skills to be productive
community members after high school.

                                                                                                                             9

Source page 47

Student needs have changed during this pandemic. We are faced with a significant number of mental health, social, and
emotional challenges among our students. In order to provide equitable access to all of our students, our strategic
initiatives have included social emotional training for teachers in the building, opportunities to look at student work
through a data lens, and professional development on co-teaching. Learning acceleration models have been adopted,
and additional support has been provided during the summer months and in after-school programs. Curriculum mapping
and review is scheduled to continue next school year as teachers work to ensure that the curriculum is rigorous and
culturally relevant. This work is foundational to fulfilling our first strategic objective - “establish and implement a
curriculum that fosters instructional practices that meet the social, emotional, academic, and vocational needs of all
students.”

Relevant & Personalized Professional Development Goal’s Strategic Objective is to ensure professional development is
relevant, current and individualized.

After creating a Professional Development committee last year, this year we published a Professional Learning & Growth
handbook, which outlined the various professional development opportunities for our faculty. Part of that training this
year has been to explore emotions through a free YALE course called Managing Emotions in Times of Uncertainty &
Stress. Counseling staff continue to work with students and families on a myriad of issues and challenges that have arisen
out of the pandemic. Professional development for all staff has centered on individual needs this year; topics such as
co-teaching, cultural proficiency, entrepreneurship, technology integration, and using data to ensure student success
have been offered. These activities have all served to support Pillar 4: Relevant and Personalized Professional
Development.

Student Engagement Budget Goal: Provide meaningful professional learning for all staff in an effort to create
engaging learning opportunities for all students.

The Professional Learning and Growth plan for this year has provided opportunities for teachers to work on creating
engaging learning opportunities for all students. Teachers have learned how to analyze student work in order to create
better lessons and opportunities for students. Professional learning for faculty has focused also on specific areas of
growth. This year’s offerings include co-teaching, advanced instructional strategies (technology), teaching
entrepreneurship in vocational classes, and using data for student success. Each of these focus areas have been selected
based on faculty interest, professional growth needs, and as part of the strategic plan. Additionally, a number of teachers
are engaging in peer observations, providing valuable insight into the strategies and techniques of other teachers. This
provides a lens for teachers to learn authentically how best to engage students. Using grant funding, we have also started
a before and after school tutoring program which provides support for students who need extra help with time
management, study skills, and learning strategies.

Continue Technology Integration:

Maintaining a 1:1 Chromebook school comes with significant financial challenges. Several of our technical programs
require the use of proprietary software and high-level equipment. Network security, infrastructure upkeep, and
Chromebook maintenance have proven to continue to be the most expensive of these challenges. We are proud of our
1:1 school environment and have been able to continue expanding our use of technology through online textbooks, the
use of e-hall pass, and student access to work through online platforms.

This year we hired a new position, an Instructional Technology Specialist. Maintaining this position is imperative to
building a strong foundation for our technology integration. With cleartouch TVs in every room, chromebooks in the
hands of every student, and countless online programs and platforms, this position has served to provide meaningful

                                                                                                                        10

Source page 48

training and support to the entire faculty and staff. Professional development is no longer relegated to “in-service” days,
as teachers and staff are constantly learning and improving their practice. Much of this improvement is centered on the
effective implementation of technology.

Communication & Community Relations: To engage in advance planning, with staff and community, in order to achieve
the greatest educational returns in relation to dollars expended. While improving community outreach efforts between
the district and all stakeholders. Improve community outreach efforts between the district and all stakeholders. Ties in
with Pillar 3: Proactive & Responsive Communication

Strategic Objective: Establish a cohesive communication plan that addresses procedures to effectively engage all
stakeholders in the school’s success.

This year, we formalized an emergency communications plan. Additionally, the crisis team has met, and a subset has
been meeting, to ensure that we are prepared for any scenario. While we are in-person this year and remote learning
has not been necessary, the advent of google classroom and other online platforms has been helpful to engaging
students who may be missing school due to illness or quarantine. The principal sends home a weekly newsletter and we
have been using social media platforms such as Facebook, Instagram and Twitter to improve communication with
families. This regular and predictable communication has been a significant improvement in keeping channels of
communication open between the school and the parents. In addition, while we have been forced to limit visitors to the
building due to the pandemic, we have used technology - zoom and google meets - to conduct meetings with parents
and other stakeholders. This has been incredibly valuable. We continue to work on a formal social media and general
communications plan to help connect with the greater community.


Keeping Vocational Programs Industry Relevant

Blue Hills strives to ensure that their 17 exciting career and technical programs remain relevant. In keeping with our core
values, we make connections to our communities. We meet with industry professionals who provide timely and crucial
industry trends with us. These connections are made through our General and Program Advisory Boards, through the
cooperative education program or through the ways in which we interact with the public through internships, clinical
settings or through our robust cooperative education program. Additionally, we connect with our education partners
and offer articulation agreements with several post-secondary institutions. These articulation agreements allow our
students to move seamlessly into further education in their chosen field with credits earned for their coursework at Blue
Hills.

The post graduate success of our students is a testament of the incredible work done here. Many students are ready to
enter the world of work, whether it's an apprentice program, union, or private sector. They are equipped with the skills
and tools needed in hundreds of professions. Many of our programs offer industry-recognized credentials as part of
their coursework. For instance, our students earn certifications for Adobe, Hot Work, OSHA, CompTIA, and A+, just to
name a few. Still other programs offer students a license. Cosmetology students earn a State Cosmetology license which
allows the students to own or work in a salon upon graduation. Early Education and Care students earn a preschool
certification and Health Assisting students are able to obtain their Certified Nursing Assistant license. These credentials
are verified by their respective industries and provide our students with a competitive advantage.


MSBA Renovation Project and Capital Assessments


                                                                                                                         11

Source page 49

In 2020, 2021, and 2022 the district allocated most of its capital-operating budget to cover borrowing costs. Moving
forward into 2023 and beyond, the district has shifted to funds away from debit payments and back to capital operating
expenses as not all district capital needs were covered by the renovation.

Annual cash outlay for the repayment of the bonds is 2.2 million annual and extends out to the year 2049. Because MSBA
has yet to finalize a number that it intends to reimburse the school, the school has taken the approach of using
short-term BAN (Bond Anticipation Notes) funding to cover its current debt. The range of potential reimbursement runs
the full gamut from nothing to the full 5.7 million. Because interest rates are still at historic lows, it is prudent to continue
borrowing short-term until the last of the MSBA funding is received.




                                                                                                                              12

Source page 50

GRADUATE PLACEMENT


Class of 2021 Future Plans

                                  Year                      2020-2021
                                  Plan      # of Students               % of Students
                         Employment              61                         31%
                              Military           6                           3%
                       4-Year College            80                         41%
                       2-Year College            30                         16%
                    Technical School             7                           4%
                            Unknown              10                          5%
                         All Students           194                         100%


* Apprenticeship = Missing Data




                                                                                        13

Source page 51

Where Our 2021 Graduates Attended:

        Benjamin Franklin Institute of Technology   Salem State University
        Bridgewater State University                Savannah College of Art and Design
        Bristol Community College                   Simmons University
        Bunker Hill Community College               St. John's University
        Fitchburg State University                  Stonehill College
        Framingham State University                 The Culinary Institute of America
        Johnson & Wales University                  UMass Amherst
        Massachusetts College of Liberal Arts       UMass Boston
        Massasoit Community College                 UMass Lowell
        MassBay Community College                   University of Maine
        New England Institute of Technology         University of New Hampshire
        Northeastern University                     University of Northwestern Ohio
        Pennsylvania University                     University of Notre Dame
        Quincy College                              University of Rhode Island
        Quinnipiac University                       Wentworth Institute of Technology
        Regis College                               Worcester State University
        Benjamin Franklin Institute of Technology   Salem State University
        Bridgewater State University                Savannah College of Art and Design
        Bristol Community College                   Simmons University
        Bunker Hill Community College               St. John's University
        Fitchburg State University                  Stonehill College
        Framingham State University                 The Culinary Institute of America
        Johnson & Wales University                  UMass Amherst



* Cosmetology school
** Preparatory college




                                                                                         14

Source page 52

Addy, BLUE HILLS

REGIONAL TECHNICAL SCHOOL

Messages from our Co-op
Partners 2O21

Heve ave some comments from a few of our business partners...thank
you for all you do to get our students ready for the “real world”

Eric - Electronics

“Eric has been working with us for over a year wow Since starting in March of
2020 and it has been my pleasure to watch as he has developed into a crucial part
of our team. When Eric ‘first started, he was a bit shy and weeded some
guidance,  but as the months passed, he has grown into a more confident
employee who helps lead others by using his adept Rnowledge base. Eric ts always
willing to help with whatever tasks we have at hand and will put extra time in to
make sure we meet our production goals. He has been a great addition to our
team, and | am excited to see how he develops further when he starts full time this
summer!” ~ Manufacturing company in Canton

Madison - Drafting

“tt was a pleasure working with Madison. Her understanding of
Avatting and computers made the training to our drafting procedures
and computer systems seamless. Madison was given projects anal
guidance on what was needed. She took the projects from beginning
to end with little supervision. Her bright personality ana intelligent
made it a pleasure to work with her. Any company or school that
Madison ts part of is getting a great addition.” - Electronics
Manufacture, Easton

15

Source page 53

Addy, BLUE HILLS

REGIONAL TECHNICAL SCHOOL

Valerie — Health Occupations

“valerie has shown tremendous progress ana promise as a team member ana
young professional. Over the semester she has honed her problem solving ana
communication sieills with both kiddos ana adults alike. Valerie's confidence
males her a rising leader and resource among her peers. She is always friendly
and inviting and creates a welcoming environment for everyone. | cannot wait to
see Valerie showcase her skills as she continues her education and work in health
services.” — Preschool Setting, Westwood

RR

Devlin - Engineering

"Devlin has been working with us for just over half a year and has been a great addlition to our
Operations team. Devlin is always on time andi eager to work and has shown great motivation
and interest tn the activities that we olo here. Over the past months | have been able to watch as
Devlin Learned the different applications and developed into a crucial member of the operations
team. Not only that, but Devlin has also been able to balance work and playing football very well.
Devlin has always made sure to have his worle done for the day before leaving for games/practice.
tt has been a pleasure to work with Devlin and | wish him well at UMASS Amherst! Hoping he
comes back in the future!” - Manufacturing Company, Canton

16

Source page 54

FY23 Budget Request Breakdown

                                                   Salary Accounts

This budget is built without the full knowledge of contractual salary increases for 2023, as at the time of print, the 2023
contracts of two of the bargaining units are not settled. Should the district fail to negotiate contracts that fit into the
budget / assessments voted and approved by the member towns, the committee will have to find ways to fund the
contracts without changing the budget bottom line or member town assessments.
This Salary budget is with the request of two additional positions to be funded by the General fund (described below).




The chart below is a summary of the districts staffing plan for FY 2023




            Instructional Staff increase is SPED teacher that will be funded through ESSER fund until FY25
                                 Facilities Staff is the increase of 1 Maintenance personnel
  Administrative staff is 1 IT technician funded through the general fund and 1 nurse position funded through ESSER.
                                                   Nurse position may be a .5




The following pages present the 2023 Proposed Operating Budget for salaries with explanation of significant changes in
the budget.



                                                                                                                        17

Source page 55

Ms 2EGIONAL TECHNICAL SCHOOL

1000 Series Salary
Description                                 2023            2022            2021            2020                                            Change
P                                      Proposed        Proposed          Budget           Budget                                                    %
1110 District School Committee             $49,838        $37,483        $73,465        $75,510        $73,432        $12,355          33.0%
1210 Superintendent                        $219,531        $212,225        $245,675        $264,675        $257,461          $7,306            3.4%
1410 Business Office                           $348,812         $330,692         $346,409         $348,912         $335,000          $18,120              5.5%
1000 Totals        $618,181        $580,400        $665,549        $689,097        $665,893         $37,781             6.5%)

1110 Line — Due to restructuring DSC support staff. Money set aside for Hrly SC Admin
1210 Line — Contractual Increases

1410 Line — Contractual Increases

Blue Hills’ students compete in the annual Skills USA Contest

18

[Original embedded text, retained for comparison]
1000 Series Salary




1110 Line – Due to restructuring DSC support staff. Money set aside for Hrly SC Admin

1210 Line – Contractual Increases

1410 Line – Contractual Increases




                             Blue Hills’ students compete in the annual Skills USA Contest




                                                                                             18

Source page 56

BLUE HILLS

-—__—+-~__4  REGIONAL TECHNICAL SCHOOL

2000 Series Salary
Description                                              2023                 2022                 2021                 2020                 2019               Change             Change
Proposed          Proposed            Budget              Budget               Actual                   $                      %

2110 Curriculum Directors                           $494,204           $466,955           $458,266           $460,766           $453,652             $27,249                 5.8%
2120 - Department Head                 $139,423      $128,771      $126,934      $134,336      $125,844       $10,652          8.3%!
2210 School Leadership                             $479,542           $457,164           $443,864           $441,289           $443,081             $22,377                 4.9%
2305 Classroom Teachers             $8,035,119     $7,486,358     $7,304,214     $7,273,289     $7,021,431      $548,761          7.3%
2325 Substitutes                                        $176,961           $170,571           $133,499           $145,281           $123,614              $6,390                 3.7%|
2330 - Instructional Support                          $37,650             $25,000             $22,379                     $0                     $0             $12,650                50.6%
2340 Library Media Specialist              $95,189      $152,868       $81,999       $81,558       $77,762       -$57,679        -37.7%
2354 Teacher Mentor Program                        $6,367             $10,000             $10,000             $10,618             $14,470             -$3,633              -36.3%
2356 Professional Development                $35,000          $20,000          $20,000          $20,000          $20,000          $15,000             75.0%|
2710 Guidance                         $516,434      $486,531      $466,545      $446,774      $416,650       $29,903          6.1%
2800 Psychological Services              $260,883      $245,912      $239,125      $230,419      $246,049       $14,971          6.1%

2000 Totals    $10,276,773     $9,650,131     $9,306,825     $9,244,330     $8,942,553      $626,642          6.5%

2305 Line - Increase due to anticipated contractual obligations (Steps/Lanes and COLA) 15 Teachers with Lane Change

requests for FY23

2356- Increase due to new language in BHEA contract requiring 35,000 for PD reimbursement.

19

[Original embedded text, retained for comparison]
2000 Series Salary




2305 Line - Increase due to anticipated contractual obligations (Steps/Lanes and COLA) 15 Teachers with Lane Change
requests for FY23

2356- Increase due to new language in BHEA contract requiring 35,000 for PD reimbursement.




                                                                                                                19

Source page 57

3000 Series Salary




3200 Line – Anticipated contractual increases – Request for .5 nurse will be funded until FY25 out of Esser

3510 Line – Anticipated contractual increases – Coaching Stipends Steps and potential Lane changes.

3600- One security position moved to Maintenance




                                                    Graduation 2020




                                                                                                              20

Source page 58

Addy, BLUE HILLS

REGIONAL TECHNICAL SCHOOL

4000 Series Salary
Description                       2023        2022         2021         2020        2019       Change       Change
P                            Proposed      Proposed       Budget        Budget        Actual           $             %

4110 Custodial Services                             $506,900           $481,199           $516,481           $514,520           $479,467            $25,701

4210 Maintenance of Grounds             $703,872      $601,122      $707,521       $697,837      $618,679       $102,749

4220 Maintenance of Buildings                      $45,000             $45,000             $55,000             $55,000             $13,752                     $0

4450 District Technology                             $212,429           $168,129           $158,376           $134,760           $115,638             $44,300

4000 Totals          $1,468,201           $1,295,451           $1,437,378          $1,402,117          $1,227,536             $172,750

4210- Contractual increase and movement within the unit. Also additional positions added per FY23 department request.

4450 Line — Increase associated with contractual increases and Additional position added per FY23 department request.

Students in Health Assisting Program

Expense Accounts

21

[Original embedded text, retained for comparison]
4000 Series Salary




4210- Contractual increase and movement within the unit. Also additional positions added per FY23 department request.

4450 Line – Increase associated with contractual increases and Additional position added per FY23 department request.




                                        Students in Health Assisting Program




                                               Expense Accounts

                                                                                                                   21

Source page 59

The 2023 expense budget increase is .82%; much of that is from increases in fixed costs and inflation on supplies and
materials.

Being cognizant of this being the fourth year of the renovation project assessments increases, the district worked at
keeping budget growth to a minimum. The increase in the instructional line is reflective of the district's efforts to
continue to keep our teachers' resources relevant to industry standards. Fortunately the district is able to allocate some
instructional subscriptions as well instructional technology to the ESSER grant. These services will move back into the
budget in FY25.

The Operations and Maintenance of the Plant line is essentially level funded. We have realized some savings in the
utilities since the renovation and those funds were reallocated to other areas like capital improvements for special
projects that were not included in the renovation project.

The 5000 Series is tied to anticipated increases in employee benefits, property and liability insurance. The district did
not set funds aside to fund OPEB in this budget as we have not created a OPEB trust at this time. Once trust is
established then the district will start to allocate funds for this purpose.




                                               1000 Series Expense

                                                                                                                       22

Source page 60

Addy, BLUE HILLS

REGIONAL TECHNICAL SCHOOL

Description                                                                  2023                        2022                        2021                         2020                        2019                     Change                  Change
Proposed         Proposed           Budget             Budget             Actual                 $                    %
1110 District School Committee                    $59,830            $56,830            $56,330            $57,400            $63,836              $3,000                5.3%!
1210 Superintendent                                     $70,500             $82,500             $82,100             $78,869             $78,395            -$12,000              -14.5%|
1410 Business Office                               $36,320           $33,320           $30,614           $31,540           $25,834             $3,000               9.0%!
1430 Legal Services                                 $57,500           $52,500           $50,000           $50,000           $40,822             $5,000               9.5%!
1450 District Technology                           $71,715           $71,165           $51,100           $40,425           $57,883               $550)               0.8%
1000 Totals          $295,865)          $296,315)          $270,144)          $258,234)          $266,770              -$450              0.2%!
Notes:

1210 Line — Decrease due to reallocation of funds to admissions lines

1450 Line — Increase is minimal because items were moved to ESSER funding until FY25

Blue Hills Culinary students serving Fish Tacos in the “Chateau” school restaurant

23

[Original embedded text, retained for comparison]
Notes:

1210 Line – Decrease due to reallocation of funds to admissions lines

1450 Line – Increase is minimal because items were moved to ESSER funding until FY25




                   Blue Hills Culinary students serving Fish Tacos in the “Chateau” school restaurant




                                                                                                        23

Source page 61

Addy, BLUE HILLS

REGIONAL TECHNICAL SCHOOL

2000 Series Expense

Description                                         2023               2022               2021                2020               2019              Change            Change
Proposed         Proposed           Budget             Budget             Actual                 $                    %
2110 Curriculum Directors                           $6,000             $6,000             $6,000             $7,000             $8,251                   $0               0.0%|
2120 Department Heads                            $18,500             $3,500             $3,500)             $3,500)             $2,834           $15,000            428.6%
2210 School Leadership                            $15,000           $13,500           $13,500           $13,500           $12,850             $1,500              11.1%
2250 Non Inst. Building Technology               $16,150            $12,850            $22,400            $25,600            $29,284             $3,300              25.7%
2345 Distance Learning                             $2,040            $2,040)                 $0                 $0)                 $0                 $0              0.0%
2356 Prof. Development Stipends                $6,000           $6,000]           $6,000           $6,000           $5,261                 $0             0.0%|
2358 Professional Development                $12,000          $12,000          $12,000          $12,500          $20,260                $0             0.0%|
2410 Text and Instruct. Material                     $67,118            $71,427            $65,507            $72,820            $48,051             -$4,309               -6.0%
2415 Other Instructional Materials               $292,137          $301,127          $297,583)          $291,907          $259,882            -$8,990              -3.0%
2420 Instructional Equipment                      $154,098          $110,187          $114,000          $113,782          $147,874            $43,911               39.9%
2430 General Supplies                              $51,000           $51,000           $51,000           $51,000           $43,819                  $0               0.0%|
2440 Other Instructional Services                     $5,125               $2,000               $2,000               $2,000                 $525               $3,125              156.3%
2451 Instructional Technology              $108,000)       $130,500       $123,000       $120,300)       $312,097        -$22,500         -17.2%
2453 Instructional Hardware                        $10,000           $10,000             $9,024             $7,718               $800                  $0               0.0%|
2455 Inst. Software                              $41,055          $37,978          $25,050          $31,900          $34,102           $3,077             8.1%
2710 Guidance                                               $3,500               $3,500               $3,500               $3,500               $2,157                     $0                 0.0%|
2720 Assessment                                          $5,000)               $5,000               $5,000)               $5,000)               $4,031                     $0                 0.0%
2800 SPED Services for Students                  $3,000)             $3,000             $3,000)             $3,000)                   $0                   $0               0.0%
2000 Totals         $815,723         $781,609         $762,064         $771,027         $932,078          $34,114             4.4%|

Notes: No reduction in programs offered or in services provided to students
2120 Line - Budget funds were moved here to align with the DOE function codes for Admission expenses.

2410 Line — Annual academic text replacement cycle. This line varies each year based on department needs or
replacement cycle timing.

2420 Line — Cost for major equipment or material purchases are split between the District Budget and the Federal

Perkins grant in 2023. Reallocation of funds to align to the proper DOE function codes

24

[Original embedded text, retained for comparison]
2000 Series Expense




Notes: No reduction in programs offered or in services provided to students

2120 Line - Budget funds were moved here to align with the DOE function codes for Admission expenses.

2410 Line – Annual academic text replacement cycle. This line varies each year based on department needs or
replacement cycle timing.

2420 Line – Cost for major equipment or material purchases are split between the District Budget and the Federal
Perkins grant in 2023. Reallocation of funds to align to the proper DOE function codes




                                                                                                                   24

Source page 62

2451 Line – The district has been working to stay ahead on Chromebook purchases, so in any one year there is not a big
increase for the replacement of Chromebook or other educational technology. The district remains committed to the 1 to
1 Chromebook program for staff and students. Reduction in this line is due to expenses being moved to the ESSER grant.

2453 Line – Instructional hardware associated with vocational program needs

2455 Line – Instructional software tools for staff and students such as Discovery Streaming, LinkedIn Learning, and
Curriculum Mapper




                         Students in the Collision Technology and Automotive Repair programs




                                                                                                                      25

Source page 63

3000 Series Expense




Notes: No reduction in programs offered or in services provided to students

3300 Line – Increase due to daily school bus contractual increase.

3510 Line – Anticipated contractual increases

3600 Line – District portion of SRO officer to the Town of Canton.

                                                4000 Series Expense




Notes:

4110 Line – Anticipated increase in supply costs

4130 Line –Decrease due to the district continuing to evaluate energy and water consumption post-reno. Majority of
savings was in water usage.



                                                                                                                     26

Source page 64

4450 Line – New 3 year service and software renewal contract with Vertical Communications. new digital Persona
licensing, E-rate project- wireless access points ( will be partially funded with E-rate), Risk assessment and new JAMF Pro
software.




                                                 5000 Series Expense




Notes:

5200 Line – Reflects an anticipated 4% to 5% increase over 2022 projected actual costs for active employee health
insurance costs

5250 Line –No OPEB allocation at this time. Realignment of funds to actual expenses.

5260 Line – Reflects an anticipated increase to costs for vehicle, building, and liability insurance

5300 Line – Cost of copier leases

5450 Line – All debit service is captured in 8000 series. No anticipated BAN costs this year.




                                                                                                                         27

Source page 65

Addy, BLUE HILLS

REGIONAL TECHNICAL SCHOOL

7000 & 8000 Series Expense

Description                                         2023               2022               2021                2020               2019              Change            Change
i                                           Proposed         Proposed           Budget             Budget             Actual                 $                    %
7200 Improvement of Buildings                     $150,000           $100,000)           $100,000)           $100,000)           $334,170             $50,000               50.0%
7500 Capital Motor Vehicles                           $65,000             $65,000                     $0                     $0                     $0                     $0              100.0%
7000 Totals           $215,000           $165,000           $100,000)           $100,000           $334,170             $50,000               30.3%)
Description                                         2023               2022               2021                2020               2019              Change            Change
7                                           Proposed         Proposed           Budget             Budget             Actual                 $                    %
8100 Long Term Debt Principal                 $730,000         $695,000         $500,000)         $500,000)                 $0}           $35,000              5.0%|
8200 Long Term Debt Interest                $1,365,956       $1,401,206                 $0                 $0)         $416,963          -$35,250             -2.5%
8000 Totals       $2,095,956       $2,096,206         $500,000)         $500,000         $416,963             -$250             0.0%
Notes:

7200 Line — Funds budgeted for capital items not covered in renovation project. Also funding for MiniVan replacement.

8100 & 8200 Line —Annually budgeted debt funds associated with long term project debt.

28

[Original embedded text, retained for comparison]
7000 & 8000 Series Expense




Notes:

7200 Line – Funds budgeted for capital items not covered in renovation project. Also funding for MiniVan replacement.

8100 & 8200 Line –Annually budgeted debt funds associated with long term project debt.




                                                                                                                    28

Source page 66

Member Town
Proposed Assessment
     2022-2023

    Feb 1, 2022
       V1.0

                      29

Source page 67

2023 Assessment Rationale

The following five items are key factors in calculating the 2023 assessment for each town

        I.      MSBA renovation project debt service
        II.     Enrollment changes at Blue Hills
        III.    Changes in the school’s operating budget
        IV.     Excess and deficiency fund allocation
        V.      Foundation budget and minimum required contribution calculations/ESSER II Funding

 I. MSBA Renovation Project Debt Service
 The district currently has borrowed and bonded $37,000,000 for the project with an additional short
 term BAN debt of $5,740,198 due November 4, 2022. The MSBA has reimbursed the district $39,588,972, as of February 1
2021. The district expects another $3,316,561 in MSBA reimbursement once the project is completed and the MSBA has
conducted its final project audit. Once the final MSBA reimbursement is received, the district will be able to develop a final
payment schedule.

Should the district need to issue any new BANS in 2023 the cost of the interest for those will come from either the district’s
2023 operating budget or from a stabilization fund transfer.

                                           4-Year Debt Schedule for Existing Bonds




 II. Enrollment Changes at Blue Hills

A town’s percentage of the total enrollment at Blue Hills is the single largest determinant of the size of a town’s annual
assessment request from Blue Hills.
This fact is clearly demonstrated in the 2023 municipal assessments. The average per pupil cost for a student at Blue Hills is
$16,726 so an increase of 10 students will cost the average community an increase of $167,260 in assessed cost. Where the
per pupil assessment varies from town to town the increase will also vary. For 2023, Braintree and Dedham saw their
assessments increase significantly due to increases in the number of students enrolled at Blue Hills. On the flip side Avon and
Holbrook saw drops in enrollment and corresponding drops in assessment.




                                                                                                                            30

Source page 68

Addy, BLUE HILLS

REGIONAL TECHNICAL SCHOOL

Year to Year Enrollment by Town

BLUE HILLS REGIONAL TECHNICAL SCHOOL
FOUR YEAR HIGH SCHOOL ENROLLMENT COMPARISON REPORT
FROM FY 2018 - 2021

DISTRICT
TOWN(S)                             FY 2018-19                                FY 2019-20                                FY 2020-21                                FY 2021-22

31

[Original embedded text, retained for comparison]
Year to Year Enrollment by Town




                                  31

Source page 69

Additional historic enrollment and assessment data can be found on pages 36 through 39.




 III. Changes in the School’s Operating Budget

After enrollment, changes in the Blue Hill’s operating budget will have the second greatest impact on the growth of each
member community’s assessment. For fiscal year 2023, Blue Hills is requesting a 3.8% increase ($886,175) in its operating
budget.

Budget growth from year to year is inevitable; however, how that growth is managed is a choice. New Superintendent Rossetti
made a decision early on in the process to level fund as many areas of the budget as possible. With all five union contracts
being negotiated in FY22 the district was able to more closely align our funds to our needs. With inflation affecting all aspects
of supplies and materials across the US the district has to account for this increase within our requests . Our goal is to ensure
that we are able to provide our students with the same materials and opportunities as we have in the past.



                                                                                                                              32

Source page 70

IV. Excess and Deficiency Fund Allocation

Excess and Deficiency Fund (E & D): A regional school district is allowed to have in its treasury a balance at year’s end not to
exceed 5% of the following year’s budget. Any funds in excess of the 5% threshold must be used to offset the following year’s
municipal assessments. A regional district may at any time allocate all of or portions of its E & D funds in building its operating
budget (603 CMR 41.00: M.G.L. c. 69, §1B; c. 71, §14B and §16D; c. 150E, §1).

                                                                              As shown by the chart by the solid blue lines, the
                                                                              district was required to apply significant excess E &
                                                                              D to the annual assessments in FY14 and FY15. The
                                                                              accumulation and use of excess E & D to reduce
                                                                              annual assessments is unwise as this use has the
                                                                              greatest likelihood of causing dramatic swings in
                                                                              assessments not related to enrollment or budget
                                                                              growth. The accumulation of excess E & D is also
                                                                              an indicator that the district is over assessing its
                                                                              member towns by creating inflated budgets.

                                                                            By FY17, the district had weaned itself off the use
                                                                            of excess E & D and began applying smaller
                                                                            sustainable amounts to reduce the assessment
year-to-year. In FY18, the district used an additional $681,157 of E & D to fund one-time expenses related to the renovation
project. In FY19 the district put $300,000 of E & D into a stabilization fund to help reduce assessment spikes related to the
renovation projects debt payments or E & D budget supports. In 2021 the district reduced the amount of E & D to $350,000
from $500,000 in 2020.

In 2023 the district budgeted the use of 450,000 of E&D this is level from 2022. The district also is cognizant of the financial
outlook for most of our districts in this challenging year and felt it was important to use these reserves in an effort to keep
assessments down. The long-term goal for the district would be to reduce the use of E&D to support the operating budget and
to use it to reduce capital assessments in the future.



V. Foundation Budget and Minimum Required Contribution Calculations
The assessment that Blue Hills requests from its member towns is made of two major components. The first is the Chapter 70
required contribution. This number is calculated by the state and comprises anywhere from 59% to 75% of the assessment
requested by Blue Hills.
Several factors indirectly affect the state’s calculation of the required contribution for a member community. One major item is
changes in the values used for each member town’s Chapter 70 Aid calculation. This includes the foundation budget
calculation; the town’s equalized valuation, and the required local contribution.
A final way to measure the impact of changes in a municipality’s required contribution is shown on the chart on page 39. The
Blue Hills share of each member's per-pupil cost is equal for all members; the real changes come in the required contribution.




                                                                                                                                 33

Source page 71

34

PJ
m
ia)
(e)
Zz
>
2
4
m
fa}
x
Zz
a
>
=
wu
fa}
<i
(ec)
ie)
Q

OY
| om
Cc
m
=
rf
|
“v

Source page 72

Addy, BLUE HILLS

REGIONAL TECHNICAL SCHOOL

FY 22-23 Budget Worksheet
BUDGETED EXPENDITURES
Blue Hills Regional Technical High School 2021 Operating Budget               $end                  22,121,033 |
Transfer E &D to Stab Or ed a nnnnnnnnnnnnnnnnnnnnne                                              $n nnnnnnnnnnn                     100,000
MSBA Rennovation 2022 Capital Debt Service                                               +                        2,095,956
Total 2021 Operating & Capital Budget, Debt Service, & Stabilization Funding $        24,316,989
REVENUE BY SOURCE

_State Funding

“Budgeted Transportation Aid                         $       622,382 :
State Funding Subtotal $                         7,382,022

_E& D Fundin:

$                                   450,000

ti $                    14,319,011

Fata! Rive Atitis         ating Suaget Fevenve THAwvoes                                                                                              $                   22,121,033

100,000
Tota! Rive Mills Stabilization Fund Fevenue Sauces                                                                                              $                       100,000
_Capital Debt Service Assessments
“interest                                                                                              :
nunttsinnnnnnnnnnmnnnnnnnnnnnnnnnnnde tpial Debit Service Assessment Subtotal: $ 2,095,956
Fate! Rive Hills Capital Lieht Service Assessment Fevenve TANCES                                                                                          $                           2,095,956

Total Operating and Capital Budget Funding - AllSources $     24,316,989

ADDITIONAL ASSESSMENTS

Blue Hills Regional - School to Careers Assessment

7 Member Town Assessments                                                                                                                               $                       157,054
Total Blue Hills Operating Budget 2022, $        24,474,043

35

Source page 73

Addy, BLUE HILLS

REGIONAL TECHNICAL SCHOOL

EXPENSE & REVENUE SUMMARY
’         2022          f               2023                /          % Change

Operating Budget                                           S$       21,234,608 $                 22,121,033 |                    3.80%
Debt Service                                        i$       2,096,206 $                2,095,956 |                -0.01%
Stabilization Fund Assessment                            i$              - $                    100,000 i                     0.0%

Total $      23,330,814 $               24,316,989                   41%
State Funding                                                 $s         5,687,123 | $                   7,352,022 |                     22.6%
E & D Funding                                                     $                      i                          450,000 -                        0.0%
Chapter 70 Required Contribution                              $                                            12,263,867 |                        8.0%
Blue Hills Operating Assessment                                   Ss                                                    2,055,144 |                         -83.7%
ESSER II Funding to reduce Assessment                       |                                                            -                          0.0%
Capital Assessment                                   $                                   2,095,956 ©                   0.0%
E & D Transferred to Stabilization fund                          $s                       :                           100,000 |                          0.0%

Total $      23,287,677 $               24,316,989 |                   4.2%
Additional Assessments                               is         152,480 _$                  157,054 |                   3.0%

Governors Chapter 70 Blue Hils F¥22 - 23 Municipal Assessments

1012020             1012021          change                           BH     Renovation                                            Total        Total
Foundation % of Foundation %of = in,        Operating        .    School to
Towns   Enrolment students Enrollment students student increase        Budeet   4-Yeat Renovation Stabilization  Careers FY23 Requested Requested Assessment Percentage
i)
decrease           Enrollment Assessment — Assessment        FY23    FY22   Ine.(Dect.) —Inc.t{Decr.)
for 2022 bytown for 2023 bytown 5, 21to          Assessmen                 Assessment
”        ito 22                                   '                  %                                                                                 assessment assessment
Avon                      4           $112180 6.7% — 140,034     0     15058 = 893986 = 1,109,505 (216619) -19.42%
Braintree                                $325,323 16.1% © 338,104     0      0 283,300 2582763 248.645 9.63%

Canton
Dedham
Holbrook
Milton

S161540 7.6% = 159,316     0     27.970 1,603,337 1472906 = 130,431 «8.86%
$235,579 10.3% , 214,858    0    27970 2,184,334 2,008,969 175,385 8.73%
$246,797 138% 289,686     15,058 1,627,398 1,783,840 (186,444) 877%
$89,744 47% = (98,952     0     15,058 866638 «= 913,087 (46,449) 109%
$235,579 8.0%  , 166,652     0     27970 «2017441 1.952994 64,447 = 3.30%

$634941 320% © 671,359  0  27970 4416092 4590821 (174.729) -3.81%
O 134307120617 17801374

100% — 2,095,956  0  $157,054 16572021 $16,544,492 $27,529 0.17%

Norwood

Randolph
Westwood                 I                }               I                $13462_ 08% —_17,000

Totals           891 100.0%

36

Source page 74

Ade, BLUE HILLS

Assessment History

FY23              FyY22                                                                                 FY 18               FYI?               FY 16
Buon 1 BSS REIT RST TR RE TT RS

Braintree
Canton
Dedham

Holbrook
Milton

Norwood
Randolph | 4.916,092] 4.590, a  _               |.                 4,022, as    4) ae pas  oe dB 7B, ae  Alt, bat

Westwood

ee Gs 572) 020 | 16,544. o     16, a ie   1. 332, =   14, STI. =  Se     13, 565, 7   13,281) mn

Dollar Change in Year-to-Year Assessments

Ayon                                                                                                                                                                                            7

Braintree |                          |               ,                       (38,252)           (79,895)

Canton
Dedham
Holbrook

Milton
Norwood

Randolph             £23)                  .            .                                  aay                                       -
Westwood                              (1,707)                                                                                         (35,275)
F       al 528       451,454         100, 763     1,420,894      [as725a] =      548,396          283,514 | $ 547, 438  re 3290214]

T year net

Avon
Braintree
Canton
Dedham
Holbrook
Milton
Norwood
Randolph

Westwood

The green boxes represent years where the $ or % amounts increased

37

Source page 75

~~}  REGIONAL TECHNICAL SCHOOL
Chapter 70 Enrollment History

yoiv2021 | 102020 | 102019 | 10NIZ018 | 10NIZ017  1ONIZ016  1ONZ015  toONi2014  wOIN2013 | 1OM2012 | 102011
Enrollment | Enrollment | Enrollment} Enrollment | Enrollment} Enrollment for | Enrollment} Enrollment for} Enrollment} Enrollment] Enrollment
forFY23 | forFY22 | forFY21  forFY 20 | forFY 19   FY 18   for FY 17   FY 16   forFY 15 | forFY' 14 | forFY 13

Avon
Braintree
Canton

Dedham |
Holbrook
Milton
Norwood |
Randolph |
Westwood

oo                                            eS oe                  oo
P| se PGT OTs] 830]

Enrollment Changes Over Time 3, 5, & 7 years

Last3years} Last3        Last 5 years        LastS        Last 7 years        Last?
Enrollment | years %         Enrollment        years %        Enrollment        years %
change        Change           change          Change          change         Change

Avon ee ae
Canton                                  TH                             1         18%                            6          a”
Dedham

rE ee a a

Assesment Changes Over Time 3, 5, & 7 years

Last 3           Last3             LastS             LastS            Last?            Last?
years $         years %           years $           years %           years $          years %

increase        increase         increase          moreese         increase         moteere
Avon                                                                                   10,678

Braintree  [—asssr] =] aa] eo] aes sao]
Canton | 155.643| | aaz751] 38%] 485.383] at

Dedham            311,547               1            733,392               50%           27,477               Six
Holbrook        (450,160)         -2            (203,473)          =            (323,764)         -1?%

Milton   a a
Norwood

Randolph | _ (203,069)              346.094              “388, 785 me
Westwood         (18,105)                          (15,976)                         (26,678)         -22%

$573,751     44] $ 2.978, 772    21%] $_ 3,290,214    25%

38

Source page 76

Addy, BLUE HILLS

REGIONAL TECHNICAL SCHOOL

Changes in Enrollment and Assessment

Change       % Change        Change        % Change        Change        % Change
over Last       over Last        over Last        over Last        over Last        over Last
3 Years           5 Years            5 Years           7 Years           7 Years

Avon
Enrollment |              (13)           -21%                                -14%                   1              2%

$(131,501)] -13%] $14,140) 256 $10,678

re re

$139537| xls 66.118] 66] $369,932
Canton

Enrollment |                                      7%                      11                18%

Assessment] $ 155,643 s442,751| 38%] $485,383

$311,947 $739,392 $727,477

re ee

$ (450,160)| 22% $ (203,473) -a1%] $ —(329,764)| -17%

| gl as            (11)

8%
[s_67,7a2| ae S 38,506] Sm] S45,544)| 5

28                                                                                    88%                            52                     98%

|s_707,676| __—S4% $958,632] 91%] $1,099,945 | 115%

1%         13                          2%
$ (203,069) -a%ls 346,004 | 9%] $998,785

ee

Assessment| $ _ (18,105 S     15,976 s    26,678

39

Source page 77

Ade, BLUE HILLS

REGIONAL TECHNICAL SCHOOL

FY23 Per Pupil Breakdown

FY23

State Calculations                                    Blue Hills Calculations
2021                                               A                                                                                                                    A+B+C =
FY23           Per Pupil                                                  Debt Service            c                    Total            Total Per

Towns               n students __ Required           [Putz              ee Capital Total Blue Hills |Requested FY23 , Pupil

Enrollmen by town       Contribution | Required         Assessment           Per Pupil               Costs                Per Pupil             Assessment '55€5sment

’                                                                                                                           a                                                         a                                                  (Not Incl

t                                                                    ’                                       Assessment                               Assessment                                       STC OR

626,714         .       $112,180                  $140,034                      878,928

Braintree                      2,167,975         ;       $325,323                  $338,101                     2,831,399
Canton                       1,254,512         :       $161,540                  $159,316                     1,575,368
Dedham                      1,705,927         :       $235,579           H      $214,858           .         2,156,364
Holbrook                      1,075,856         .       $246,797           7      $289,685           x          1,612,338
Milton                        662,884         H        $89,744                   $98,952                       851,580
Norwood                      1,587,241         ;       $235,579                  $166,652                     1,989,472
Randolph                      3,081,823         f       $634,941                  $671,359                     4,388,123
Westwood                      100.935         ;        $13,462                   $17,000                       131,397

Totals     100.0% $12,263,867 $14,482  $2,055,145 $2,244  $2,095,957  $2,366   $16,414,969 $19,091
Average       Average

Average                                       Average

Foundatio ~~ of

AAA Ana a

Source page 78

r

BLUE HILLS

REGIONAL TECHNICAL SCHOOL

Per-Pupil Costs Three-Year History

A

Per Pupil
Towns                 FY Required
Contribution

Avon

Braintree

Canton
Dedham
Holbrook

Milton
Norwood

Randolph

Westwood

District Average                14,482 $

B
Total Blue Hills Per
Pupil
Assessment

2,244 §

Total Per Pupil
Assessment (Not
Incl STC or
Capital)

Per Pupil

FY Required
Contribution

$
$
$
$
$
$
$
$
$

Total Blue

Hills Per
Pupil

Assessment

13,362
14,190
15,130
15,242
8,990
12,750
11,779
10,092 $

15,582 3

5,453
5,453
5,453
5,453
5,453
5,453
5,453
5,453

5.453

+B=
Total Per

Pupil         FY Required

Assessment                  Pane
{Not Incl       Contribution

12,302
13,454
15,582
15,242
9,231
14,817
14,685
10,236 $

15,582 $

Per Pupil           Total Blue

Hills Per
Pupil

Assessment

4.176
4.176
4.176
4.176
4.176
4.176
4.176
4.176

4.176

Total Per
Pupil
Assessment
(Not Incl

16.726)$ 13.013 S$ 5453 $ 18466/5 13459 $ 4176 $ 17,635

41

[Original embedded text, retained for comparison]
Per-Pupil Costs Three-Year History




                                     41

Source page 79

Addy, BLUE HILLS

REGIONAL TECHNICAL SCHOOL
Blue Hills Applicant to Enrollment by Community

Four-Year History

The chart below shows the number of students from each community that applied to Blue Hills for each of
the last five years. % Accepted = Percent of those who applied that were accepted, % Actually Enrolled is
percent of those who were accepted and who actually attended on day one of the school year

Blue Hills Applicant to Enrolment by Communi            —C Onn]
Chass of 2022         | class of 2024

Class of 2024                         Class of 2025

2020-21                    2021-22

Se
J sects Enotes | soe we
BRAINTREE         ee

s6 Actually Enrolled       Es es =
OO
%6 Actually Enralled       a a a

36 Actually Envalled       iS ss ee ed

HOLBROOK         es

Class of 2023                                                                                            S-Year Avg

2018-19

Tatal

‘4

96 Actually Enrlled           es ee ee

36 Actually Enralled            | 2s
ee a

57
a es ee
RANDOLPH        Rs
TS ES
% Actually Enrolled        Ee es

42

[Original embedded text, retained for comparison]
Blue Hills Applicant to Enrollment by Community

                                        Four-Year History
The chart below shows the number of students from each community that applied to Blue Hills for each of
the last five years. % Accepted = Percent of those who applied that were accepted, % Actually Enrolled is
percent of those who were accepted and who actually attended on day one of the school year




                                                                                                      42

Source page 80

This page intentionally left blank

             (Notes)




                                     43