Source page 202
TOWN OF CANTON FORM B - FISCAL 2024 CAPITAL PROJECT / EQUIPMENT REQUEST DEPARTMENT: SUBMITTED BY: Canton Police Department Helena Rafferty PROJECT / EQUIPMENT TITLE: Appliances/Renovations TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000): 50,000 DESCRIPTION: Designated Kitchenette & Eating Area for Personnel. Electrical, Plumbing, Carpentry Labor & Supplies PURPOSE AND JUSTIFICATION: Then men and women of the Canton Police Department do not have a stove or designated eating area out of the public view. They oftentimes work 16 hour shifts and do not have the ability to make heaithy meals for themselves. They often end up eating take out items which certainly is not healthy. Area departments have had incidents of establishments spitting in coffee/food of officers. Although last on the list of capital requests, this is a very important one for me. All aspects of officer weliness are critically important to me, to include physical and mental. Much of the control room at the Canton Police Department will need to be redesigned in coming years for safety purposes. So, this project would help to start us down that road and also let the men and women of this department know they matter. NEED CLASSIFICATION: (Check all that apply) D rtm Priori ing: Required for Safety Please rank this request out of your total ~__ Required by Law or Mandate requests for this year: (#1 as top priority) _x_Improve/Expand Service or Increase Efficiency 6 (#) OF 6 (#) ____ Planned Project or Replacement Expected Useful Life: (Check one) _x_Unplanned Project or Replacement _x 200rMore Yrs 5 to 9 Years _x_ New Project/Item (not on last year's 5-Yr. Plan) | _ 10to19 Years 3 to 4 Years Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one) ___ Will Reduce Cost by $ ___Will Produce Add! Revenue by $ No Impact Revenue Neutral (no impact) ~_Will Increase Cost by $ ___ Will Decrease Revenue by $ OTHER COMMENTS OR INFORMATION: (Attach supporting documentation) OR Oma PO Pet
Source page 203
Town of Canton, Massachusetts
PUBLIC WORKS DEPARTMENT
Inter-Office Correspondence
To: Select Board, Charles Doody
From: Michael Trotta
Date: November 9, 2022
Re: Public Works CIP
Fy 24 - ATM 2023 CIP Requests
Public Works
1. 6 Wheel Dump 324,000
2. Massapoag Brook Study 260,000
3. Memorial Field Study 252,000
4. Leaf Blower 13,000
5. Flail Boom Mower TBD
6. Truck 14 F-350 Pick-up TBD
7. Pleasant Circle Drain 270,000
8. Paint Exterior of PW Garage TBD
9. PW Garage Floor Clean and Seal TBD
10. Ford Explorer Hybrid 55,000
Property Maintenance
1. Memorial Hall HVAC 111,000
2. F-350 Pick-up TBD
3. Utility Vehicle 21,000
4. FA/CO Water Sewer Garage TBD
5. FA/CO Park & Rec Garage TBD
6. Senior Center HVAC 36,000
7. Memorial Hall Second Floor A&E 300,000
Water
1. Contract 3 Construction 600,000
2. Truck 2 F-150 Pick-up 63,000
3. Contract 4 Design 280,00
4. Neponset WTF GAC 150,000
5. Revere Ct. Water 420,000
6. Compressor 40,000
7. Asphalt Hot Box 56,000
Sewer
1. Phase I l/l Rehab 1,600,000
2. Culloden Generator 40,000Source page 204
short-native-text
PROPERTY MAINTENANCE
Source page 205
TOWN OF CANTON
- FORM B - FISCAL 2024
WiSy CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Public Works Michael Trotta
PROJECT / EQUIPMENT TITLE:
New HVAC System for Lower Memorial Hall
TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
$111,000
DESCRIPTION:
Remove the existing HVAC system at Memorial Hall and replace with an electric heat pump.
PURPOSE AND JUSTIFICATION:
The HVAC system for the lower level of the hall is 21 years old. The average life of a system is
12 - 15 years. We are very diligent on PM, cleaning, and greasing our units so they have
survived. This summer the fan motor imploded and luckily only scarfed the aluminum coils,
we were able to retrofit another fan motor and blade as the original equipment is no longer
available. The refrigerant in the new system will be R-410 which is NOT compatible with the
existing R-22, so everything needs to be replaced, pipes and all. We are proposing an electric
heat pump with low temperature capability.
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
___ Required for Safety Please rank this request out of your total
___ Required by Law or Mandate requests for this year: (#1 as top priority)
___ Improve/Expand Service or Increase Efficiency _______ 1_(#) OF ________ 7 (#)
___ Planned Project or Replacement Expected Useful Life: (Check one)
___ Unplanned Project or Replacement x 20 or More Yrs 5 to 9 Years
x New Project/Item (not on last year's 5-Yr. Plan) __ 10 to 19 Years 3 to 4 Years
Impact to Dept, Operating Budget: (Check one) Revenue Impact: (Check one)
___ Will Reduce Cost by $____________________ __ Will Produce Addl Revenue by $__________
x No Impact x Revenue Neutral (no impact)
___ Will Increase Cost by $ ______________ __ Will Decrease Revenue by $_____________
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)Source page 206
PON-ENE-2022-007 - Green Communities Competitive Grant Program
Charles Doody
Town of Canton
801 Washington Street
Canton, MA 02021
cdoody@town.canton.ma.us
781-821-5000
November 3, 2022
Massachusetts Department of Energy Resources
Green Communities Division
100 Cambridge Street, Suite 200
Boston, MA 021 14
Attn: Jane Pfister, Grant Coordinator
RE: Canton, MA Efficiency Narrative
Dear Jane,
The Town of Canton is happy to provide you with the following project narrative for the Green
Communities Competitive Grant program for your consideration. Canton was designated as a Green
Community in December 2017. We have subsequently successfully used our designation grant funding,
one round of competitive grant funding, as well as considerable Town capital funding toward energy
efficiency projects. We are proposing to apply for $ I 10,814.00 in competitive grant funding this year
towards this project: The project is described below.
Town of Canton - Efficiency Narrative
Memorial Hall Replacement of the Lower level NG fired AHU HVAC System with
an HP
Overview
We will be saving 8,747 kWh and 900 therms
Specification sheets for all equipment to be installed: (see audit documents for cut sheets)
Scope of Proposed Project
Remove refrigerant and dispose of per Mas State guidelines
Disconnect and remove all existing freon pipes/ A-coil, and compressor
Disconnect remove and cap existing hot water piping from boiler
Install new Heat pump and connect new AHU to existing ductwork
Connect to existing control system
Purpose: To decarbonize and update the lower level memorial hall HVAC systemSource page 207
TOWN OF CANTON
FORM B - FISCAL 2024
CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Public Works Michael Trotta
PROJECT / EQUIPMENT TITLE:
New Ford F-350 Pick-up Truck
TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
TBD
DESCRIPTION:
New or current model year Ford Super Duty F-350 4 WD Truck equipped with tool boxes and a
9 foot snow plow assembly.
PURPOSE AND JUSTIFICATION:
This request is for a new pick-up to be added to the Public Works fleet. The Property
Maintenance Division has experienced increase demands in its daily routine managing the 19
buildings and associated landscape under its care. They are often short a truck to move men
and material and are forced to delay jobs waiting for a loaner from another Public Works
Division.
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
___ Required for Safety Please rank this request out of your total
___ Required by Law or Mandate requests for this year: (#1 as top priority)
x Improve/Expand Service or Increase Efficiency _______ 2 (#) OF ________ 7 (#)
___ Planned Project or Replacement Expected Useful Life: (Check one)
___ Unplanned Project or Replacement __ 20 or More Yrs ____ 5 to 9 Years
___ New Project/Item (not on last year's 5-Yr. Plan) x 10 to 19 Years ___ 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
___ Will Reduce Cost by $____________________ __ Will Produce Addl Revenue by $__________
x No Impact __ X
___ Will Increase Cost by $___________________ __ Will Decrease Revenue by $_____________
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)Source page 208
TOWN OF CANTON
wiSrall FORM B " FISCAL 2024
WISF CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Public Works Michael Trotta
PROJECT / EQUIPMENT TITLE:
Kubota RTV Utility Vehicle
TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
$21,000
DESCRIPTION:
New or current model year Kubota RTV Utility Vehicle equipped with a heated cab and dump
body.
PURPOSE AND JUSTIFICATION:
The Property Maintenance Division takes care of the 34 acres of conservation ground and
trails at Pequitside Farm. They currently use a small farm tractor. This vehicle is proving
inefficient to meet the needs of emptying trash barrels, picking up loose debris, carrying
repair material, tools. The Kubota RTV has a dump body to hold material and tools and a
heated cap for 4 season use.
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
___ Required for Safety Please rank this request out of your total
___ Required by Law or Mandate requests for this year: (#1 as top priority)
x Improve/Expand Service or Increase Efficiency _______ 3_(#) OF ________ 7 (#)
___ Planned Project or Replacement Expected Useful Life: (Check one)
___ Unplanned Project or Replacement __ 20 or More Yrs ____ 5 to 9 Years
x New Project/Item (not on last year's 5-Yr. Plan) x 10 to 19 Years ___ 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
___ Will Reduce Cost by $____________________ __ Will Produce Addl Revenue by $__________
___ No Impact __ Revenue Neutral (no impact)
___ Will Increase Cost by $___________________ __ Will Decrease Revenue by $_____________
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)Source page 209
For Earth, For Life Kibhoka
Source page 210
RTV-XG850 2018 Dovaloped to meot tho demands ol farmers, manchars and estate ownors with a lot of land to ee a ere pars ence of Stents Wi mel foes cod ot ‘customors, lke wookond axplorars who appraciated ‘tho vorsatlily the. SedoNek a doltvors. ALL NEW RTV520 oe Isard sat ed opoga iy be VSO Da [pet latin ‘set. an avon highor standard | M-Series - M7-Series ‘2006 . 2017 ‘Afullccale model chango for 2006 ‘Tho cleanest, most capable, and fnvaduced a r-anginoared and rooslghed _troctpoworl tor Kubota over M-Sorlos. Bull o tacklo Just about anything ‘bull, tho M7-Series markod the youtrow atl. tie MSoreelsonech frat ie tial a Kubota wacior Kehoe most curabio and affcontt dato, achioved 170 HP. boasting long Ist of powar and comfort improvameria fe
Source page 211
WORRY-FREE OWNERSHIP. No matter how experlenced you are behind the wheel of a utility vehicle, the machine needs to make your life easler. The RTV520 does Just that with worry-free ownership, made possible with reduced maintenance, enhanced pr for key and easy Rest assured you have a vehicle you can rely on day In, day out. Easy Operation ‘The vehicle is designed to be easy to operate for any driver, regardiess of experience. This Is made possible with the VHT, whore one-pedal operation, smooth accoloration, and engina ‘braking Increase driver confidence and securty. Maintenance Made Simple Alarge cargo bed opening and a closing angle of 52.3 degrees provides easy access fo components undemeath for quick and simple maintenance. Plus the VHT does not have a belt, removing a component that is traditionally cifcult to flx and easy to broak. ‘These benefits keep your vehicle ready for any job, by reducing the trips required to got it serviced or repaired. Durable Design, Protected Components Building on the Kubota Design Excellence that comes standard on every Kubota product, the RTV520 stands apart by protecting key components of the vehicie. Areas of the vehicle ike the underbody, and beneath the cargo box and operators stalion were designed to protect the machine from the unexpectad, enhancing the durability of the vehicle, Metal Cargo Bed Unlike the plastic cargo beds found on competing utlity vehicles, the RTV520 features a durable metal cargo bed that can withstand hard use. New Radlator with Screen ‘Tho RITV520's rasiator features a screen that prevents mud and grass from sticking to the radiator. A window provide superior accessbiity for cleaning and maintenance.
Source page 212
cer THERE COMFORTABLY. Enjoy a smooth, and comfortable ride, thanks to the RTV520's improved suspension and softer seat. The engine improvements also deliver reduced vibration and a quieter ride and can be customized to match any season. We now offer an enclosed cab which delivers protection from the elements even In cold environments. Capable Suspension System ‘The robust and reliable system features a new Stink rear system which helps prevent the vehicle from bottoming out and improves rider comfort, even in rough terrain. Comfortable Seat Design “The styish matte-black and contourod soats have been redesigned with a 80% softer padding material, to provide better comfrt during long rides. Quiet Engine Anew, water-cooled 2-cylinder engine produces less noise than both the competition and previous models, making for @ quiet and enjoyable ride. ‘Smooth Operating Experlence “The 360-degree crank and two axis balancer significantly reduces the vibration from the engine, also reducing the feedback to the drivers, hands and arms, Drivers can stay focused on the Job at hand, even afteralong day ofworkk La 2 “Optional Enclosed Cab
Source page 213
ACCESS ANY AREA.
Access any area with the nimble stature and maneuverability
of the RTV520. At 54.7 in. wide, you can easily access narrow
; Toads and squeeze through tight gates. The vehiiclo Is very
_} easy to tum. When combined with a tight turning radius, the
RTV620 unlocks areas all over your property or worksite.
Narrow, Stance
‘Tho RTV520's compact dimensions let you nlmbly maneuver into
and out of ight spaces with ease.
* ‘Tight Turning Radius
With a tight tuning diamator of just 21.7 ft, tho FITV520 can
work in narrow sites where bigger utilly vehicles can't go.
Easy to Tum
. FITV520's stearing system makes Ight work of steering. And
{fat means less fatigue after a long day of traveling and greater
productivity on the site,
___ 547 in,
74 in.Source page 214
CUSTOMIZE YOUR RIDE. Enclosed Cab ENHANCE VERSATILITY. Glove Box Front LED Work Lights "Front Guard Rear LED Work Light Specifications Medel tere rve20 Typ E = Genera Pape | Danae Body er [Garg Gren Deiter] ange tom DE 2k, Oe, OFC Waterco EFL ‘iT oipicement exci fe) BIG [icrapewer HP pea) ipm_[ == Ta paa aor Fowitew capes Us. gab 9 63 (02) “ranula YH FLUE ea tee Vaca Hye Trane ashe epee Tan 249 (0) ‘Weel. cv syste “TD wea aleton Ctferena ck, Sianderz hand oparaled wh mochariaT or Gey selecton Bo ang freer. natal reve [een Rear rpdectiae pres [pening bake Tiarwhen hand iver ack Pinon Front Fi Tadapenes Mae Phanin Satie Sea ndapenden Pane Lange ince 16551570) T1182 G20 “nenng rent pur Wah Tae Zr 19061 Helen erat In 74 (180) Fr wea eles te) ao 1020) Paver car vend eaniers Wn ie) 1640) Wresbane Te 7a. (1900 eden rdrer ato (ro) 251/07 17) ming cima (| 217 (2 aa lia wwiah! owing eave]. ta) 106 (30) Payoad exp Ts) 5120) waite sh EE I ESTES] Wah Lange An an) 40.0 (0S HSS (GOATS OV cargo ned [Yee eu.) 90 (023) Bed el onion] tn) Cenobedioed Br. ta Fron yet Pear 24x TI-E2ATV. PLY 2011-12 HOWS., GRLY ayaa or I Eo OFF. Fret guar oF I Eo Pancreat rr. am
Source page 215
| MIGHTY CAPABILITY. NIMBLE PACKAGE. EVERYDAY PERFORMANCE WORRY-FREE OWNERSHIP GET THERE COMFORTABLY ACCESS ANY AREA
Source page 216
[EVERYDAY PERFORMANCE.
make quick work of every project on your to-do Mist.
Powerful Kubota Liquid-Cooltied EFI Engine
‘Amore powerful 2-tyinder engine provides increased
horsepower, with quict and rellable. muscle’ for any job. Kubota
buit, the durable engine is liquid-conled:to improve officiency and
ensure consistent performsnce throughout the day. Electronic
Fuel Injection (EF) makes starting ihe engine in cold-weather
casior, and provides instant power with greater throttle corto.
Variable Hydrostatle Transmission (VHT)
‘The FITV520's Variable Hydrostatic Treinsmission (VHT) provides
-exceptional performance on any terrain with smooth and,
. powerful accalsration. Low-speed driving is made exceptional
through smooth thrattle control, great traction and increased
manewerabilty. Plus dynamic braking Increases driver confidence:
swith one-pedal operation whan traveling downhill and makes Jobs
that require froquent stops easier,
. No matter where you go or what job you need to get done, you can count on the RTV520 to make easy
work of it, evéry single time. A liquid-cooled Kubota engine delivers more than 1i’ horsepower, while the
VHT transmission provides single-pedal operation and hili-hold support te Increase driver confidence no
matter the terrain. The heavy-tluty cargo bed with dump capabilities and a towing capacity of 1,168 Ibs
Heavy-Duty Cargo Bed
The cargo bed is where work ge's dene. That is wiry the FTVS20
‘comes with a large bed (40.6" 9 33.6") and 441 Ins carga capacity,
helping you tackle whatever the day brings. A wide opaning gives
you plenty of space te work, making loading and uniosding the
bed easy. Plus heavy-duty steel carge tie-down hoaks help keep
your gear and cargo secure, even wnen the terrain is unforgiving.
Capable Towing Capacity
‘The reliable =ngine cielvers capable towing capacity, made simp'a
with @ standard traler hitch for greater versatity and an abilty to
atigch trallers or pullbehind equipment. For those who rohuse to
compromrisa, the mighty RTV520 can tackle even the toughest
fobs with ite 1,168 Ibs towing capacity,
[Original embedded text, retained for comparison]
JD
Q-o P
■hil
B'hp
pili!
Hi! M|i fif!
to I
a> a fifi?
tu 'P £
Err 8 o®
E L - "i<pl
S ° 1&-Ia I
§ & ■■5'8^ 88 ®
b*= e .= a BIO! ~ '-' J" = -= XJ
fill g Eg a.Em
I HhsS
1 sfe'h
t»“lh
o£?S8i
I HO
3SfiS8
ms*
flit!
lilflSource page 217
Kybota, ia] KUBOTA TRACTOR CORPORATION 1000 Kubota Drive, Grapevine, TX 76051 Tel 888-4 KUBOTA +] : ® Visit our web site at: KubotaUSA.com ©2020 Kubota Corporation IT’S THE WAY TO LIVE!” Kubota Cat.No.2452-01-US Printed in Japan.D.REX.'20-SEP.
Source page 218
5 Cushing Drive 846 Bronco Highway 45 North Main Street
Wrentham, MA 02093 Burrillville, Rl 02830 Carver, MA 02330
POWER EQUIPMENT Tel: (508)384-0011 Tel: (401) 710-9911 Tel: (774) 213-9190
Fax:(508)465-0931
Fax (508) 384-8667 Fax:(401)710-9466
www.norfolkpower.com ***Please remit payment to Wrentham address***
info@norfolkpower.com Branch
tip To: IN STORE PICKUP 01 - WRENTHAM
Date Time j Page
10/26/2022 11:44:03 (O) ] 1
Account No Phone No Est No 02
CANTO034 7818215025 : .Q16743
Ship Via Purchase Order
Invoice To: CANTON D P W
150 BOLIVAR STREET Tax ID No
CANTON MA 02021
Salesperson
TYLER DELOIA TMD
EQUIPMENT ESTIMATE - NOT AN INVOICE
) ascription ** Q u o T E ** EXPIRY DATE: 11/25/2022 Amount
STATE CONTRACT FAC116 PRICING REFLECTED.
’LEASE INSTALL PARTS SECTION WHEN RTV ARRIVES.
Jew KUBOTA RTV520-A UV ORANGE W/ATV TIRES 10499.00
ADDITIONAL PARTS
Complete Cab Ki 77700-11821 Qty: 1 Price: 5399.00 5399.00
CIr GAB HEATER, 77700-V4314 1 649.00 649.00
CI. /INDOW WIPE 77700-V4367 1 249.00 249.00
3LECTRIC BED LI 77700-11958 1 1069.00 1069.00
Miscellaneous Charges/Credits
STATE CONTRACT Qty 1 Price 315.00 315.GO-
Subtotal 17550.00
authorization: Quote Total 17550.00
Mb 0005 RETURN FOLtCY; (1) AH now equipment comes with a written man.ufacluzaz'a warranty. Any defects In raptorial workmanship are subject to repair according to the manufacturer ’s warranty. Unless directed by th
xnanulactuzaz.equipmentwill not ba replaced. Equipment returned within seven business days Io now unused conditions maybe exchanged or refunded for the full amount. ft} Equipment returnedwithln seven business days an
has been used subject to a thirty percent restocking fee. (4) No returns after seyen business days, 15} All specisl orderssubject to a twenty p.reent cancellation fee ldlSpecisl ozderunitsaro non-returnable. Norfolk Power Equipment, Im
.reserves the right to .add o price increase to any quote o, customer order prior to shipment, In order io address increases In commodity prices and surcharges imposed by manufacturers during the period from the data htr»n1 to th
shipment date. Norfolk Power Equipment, Inc W'll notify the buyer of the hnan.copzlooduapzloztpasaa.mblyofnowzn.aehina. Tha buyoz shall hayotha right to wncalthaozdaz within wdays of zacoipt of final prico. At that tbnatho an
will bo.cozna oy.altabia to ths n ext oustoznor io tins.
new equipment quotes valid for 10 days unless stated otherwise,*** Thank YOU For Your Business!Source page 219
TOWN OF CANTON
FORM B - FISCAL 2024
WgiF CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT; SUBMITTED BY:
Public Works Michael Trotta
PROJECT / EQUIPMENT TITLE:
Fire / CO alarms for Parks/Rec Garage 87 Pine street
TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
TBD
DESCRIPTION:
Install fire alarms, heat detectors, CO detectors in the offices and open garage area of 87 Pine
street. These will be tied into the town's central alarm system
PURPOSE AND JUSTIFICATION:
This was suggested by the building study report. This building has none of the required safety
features that this project supplies. If there ever was a fire it would be well advanced before it
was ever reported or the before arrival of the Fire department personnel. With vehicles
parked or running within the garage there is always CO emissions being given off with
personnel inside with the vehicles. The safety of personnel and the saving of equipment
should far outweigh the expense not to mention the practicality of this project. This is one of a
few town owned building that does not have this safety feature.
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
___ Required for Safety Please rank this request out of your total
___ Required by Law or Mandate requests for this year: (#1 as top priority)
___ Improve/Expand Service or Increase Efficiency _______ 5 (#) OF ________ 7 (#)
___ Planned Project or Replacement Expected Useful Life: (Check one)
___ Unplanned Project or Replacement 20 or More Yrs ___ 5 to 9 Years
x New Project/Item (not on last year's 5-Yr. Plan) x 10 to 19 Years ___ 3 to 4 Years
Impact to Deot. Operating Budget: (Check one) Revenue Impact: (Check one)
___ Will Reduce Cost by $___________________ _ __ Will Produce Addl Revenue by $__________
x No Impact x Revenue Neutral (no impact)
___ Will Increase Cost by $___________________ __ Will Decrease Revenue by $_____________
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)Source page 220
TOWN OF CANTON
form B - FISCAL 2024
WSF CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Public Works Michael Trotta
PRO3ECT / EQUIPMENT TITLE:
Engineering design for a Variable Refrigerant Flow (VRF) HVAC system for the Senior Center
TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
$26,000
DESCRIPTION:
Design a VRF HVAC system to replace the existing York/ Johnson Control system that supplies
the main building including make up air system, resizing of duct work if needed, applying for
green energy credits.
PURPOSE AND JUSTIFICATION:
The Senior Center HVAC has had numerous failures in both heating and cooling the building.
The varied simultaneous activities such as dance class, table games, chat meetings, office
space needs tax the controls as the system cannot heat one room, cool another. The system
is either on cool or heat treating the demand as one need. The VFR will give each area its own
customizable thermostat independent of the surrounding area allowing more energy
efficiency. Reduce the cost of heating or cooling those areas not in use.
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
___ Required for Safety Please rank this request out of your total
___ Required by Law or Mandate requests for this year: (#1 as top priority)
x Improve/Expand Service or Increase Efficiency _______ 6 (#) OF ________ 7 (#)
___ Planned Project or Replacement Expected Useful Life: (Check one)
___ Unplanned Project or Replacement __ 20 or More Yrs ____ 5 to 9 Years
x New Project/Item (not on last year's 5-Yr. Plan) x 10 to 19 Years ___ 3 to 4 Years
Impact to Deot, Operating Budget: (Check one) Revenue Impact: (Check one)
___ Will Reduce Cost by $____________________ __ Will Produce Addl Revenue by $__________
___ No Impact __ Revenue Neutral (no impact)
___ Will Increase Cost by $__________________ __ Will Decrease Revenue by $_____________
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
This is just for the design phase, actual cost for project will be determined by : rebates,
available Green communities money, and how much of the existing system can be salvaged.Source page 221
DESIGN PROPOSAL
Steven Choiniere
Town of Canton, MA
Reference: Canton Senior Center HVAC Evaluation and Design
Date: 10/31/2022
Dear Steven,
We are pleased to offer this proposal to provide design services for the above-mentioned project based
on our recent correspondence and documents provided. Our understanding is that the existing HVAC
system operation and control has been problematic, and the system has apparent capacity issues. It is
desired to upgrade or replace to provide dependability, proper temperature control and improve
operational efficiency.
The proposed scope for this project includes a review of existing HVAC system design and installation to
identify the extent of existing operational issues and make recommendations to replace or upgrade.
Based on our review, we intend to identify and propose available upgrade options including the
consideration of incorporating a variable refrigerant flow (ductless VRF) system. From there, the
recommended / approved scope of work will proceed to design and construction.
Proposed Engineering Scope and Deliverables:
1. Review existing HVAC system design and document actual installed conditions
2. Provide all required site work to document existing conditions.
3. Identify options to upgrade or replace existing HVAC systems and review with client, including
the potential for VRF.
4. Evaluate make up air and exhaust requirements for occupancy ventilation, kitchen hoods, toilet
exhaust, etc. and incorporate heat recovery into the design to maximize energy savings (utilizing
ERV technology).
5. (2) in person meetings and additional teleconference meetings (as required) with client to
review options and establish the approved design scope of work for design & construction.
6. Mechanical Engineering & Design
• Heating, cooling and ventilation load calculations
• Code evaluation and compliance
• Airflow calculations for air distribution systems
8 Onset Ave Buzzards Bay, MA 02532 - 774.444-0250Source page 222
Jdgaard
• Equipment sizing, selection and design
• Make up air, exhaust and heat recovery systems design
• Modifications to existing ductwork and gas piping distribution systems as required.
© Automatic temperature control systems design & specification
7. Electrical Engineering & Design
o Disconnect and removal of power distribution from existing equipment being removed,
o Power distribution to new equipment
8. Plumbing & Gas Engineering & Design
® Modifications to gas piping distribution as required
9. Submit 90% Complete Design Documents for final Client Review & Comments
10. Submit 100% Construction Documents for permit & Construction
11. Professional Engineering stamps as required for MEP permit & construction
12. Construction Administration Services will include:
• Review of shop drawings.
® Responding to Requests for Information (RFI's).
• Two (2) Site visits; one (1) engineer) per site visit. After each site visit a written report
will be issued.
Project Costs & Acceptance:
Description Hours Fee
HVAC System Evaluation 24 $ 3,960.00
HVAC Engineering / Design 60 $ 9,900.00
Plumbing / Gas Engineering/ Design 12 $ 1,980.00
Electrical Engineering / Design 24 $3,960.00
Subtotal $ 19,800.00
Construction Administration $ 2,475.00
Total Fee $ 22,275.00
Additional Services:
Review & Complete Utility Rebate
Form, for equipment that meets the
Utility Energy Performance Guidelines. 20 $ 3,300.00
8 Onset Ave Buzzards Bay, MA 02532 - 774.444-0250Source page 223
Jelgaard
**Travel & expenses will be billed additionally based on current IRS mileage rates
Thank you for the opportunity to present this proposal and we look forward to working with you on this
project. If you have any questions or need additional information, please feel free to call.
Best Regards,
Kjelgaard Engineering, LLC.
11.01.22
Michael J. Kjelgaard, P.E. Date
Principal
Accepted By:
Town of Canton
Steven Choiniere Date
8 Onset Ave Buzzards Bay, MA 02532 - 774.444-0250Source page 224
TOWN OF CANTON
FORM B - FISCAL 2024
CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY;
Public Works Michael Trotta
PROJECT / EQUIPMENT TITLE:
A & E Services for Memorial Hall
TOTAL PROJECT / EQUIPMENT COST: (must be at least $5,0003
$300,000
DESCRIPTION:
Architectural and Engineering services for improvements to the interior of Memorial Hall
generally including; new dropped insulated ceilings, insulation of the attic space, update to
HVAC system, update to sprinklers.
PURPOSE AND JUSTIFICATION:
This project is to modernize interior of Memorial Hall generally as follows: new dropped insulated
ceilings at second floor, relocation of lighting, upgrade sprinkler system to three levels, insulating the
attic space, remedial work to attic windows, new mini-split cooling system for most office spaces. The
project will enhance the existing building providing cost saving energy efficiency improvements and
improve the quality of the inside environment for the users.
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
___ Required for Safety Please rank this request out of your total
___ Required by Law or Mandate requests for this year: (#1 as top priority)
___ Improve/Expand Service or Increase Efficiency ________7_(#) OF _________ 7_(#)
___ Planned Project or Replacement Expected Useful Life: (Check one)
___ Unplanned Project or Replacement __ 20 or More Yrs ____ 5 to 9 Years
x New Project/Item (not on last year's 5-Yr. Plan) x 10 to 19 Years ___ 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
___ Will Reduce Cost by $____________________ __ Will Produce Addle Revenue by $__________
x No Impact x Revenue Neutral (no impact)
___ Will Increase Cost by $___________________ __ Will Decrease Revenue by $______________
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
FORM B - FISCAL 2011Source page 225
Mr. Steven Choiniere; Supervisor of Facilities
Town of Canton
801 Washington Street
Canton, Ma 02021
23 October 2019 REVISED 27 October 2020
RE: Architectural and Engineering Services
Estimate of Anticipated Fees
Town Hall Improvements
Dear Mr. Choiniere:
The following is my understanding of the project, goals, and scope of work required
for Architectural and Engineering services for your town hall improvement project. It
is understood that this estimate is intended to be used in support of determining
funding needs for the future and is to be considered an estimate for those purposes
only. The estimate is based upon a proposed scope of construction and associated
drawings provided by the Town of Canton as well as the base budget of the
construction costs. Public Meetings preparation and presentation are not included.
Project Description
The project is to modernize the existing first floor, second floor and attic of the Town
Hall generally as follows: new dropped insulated ceilings at second floor, relocation of
existing second floor lighting, adding sprinkler system to three levels, insulating the
attic space, remedial work on attic windows, additional location appropriate electrical
outlets, new mini-split cooling system for most office spaces.
The project will enhance the existing building providing cost saving energy efficiency
improvements and improve the quality of the inside environment for the users.
Scope of Services
Existing Conditions:
Field measure the first second and attic floors of the building and provide CAD drawings for a
basis of the design work and the construction documents. Drawings shall include the floor
plans, reflected ceiling plans, general building sections and exterior elevations showing attic
windows.
A survey of the property will be required indicating locations of all utilities on the site.
Preliminary Design
Code Review:
Basic Building Code review tailored for the project.
Zoning Review:
it is understood that there will be no zoning issues.
Schematic Design:
Reflected Ceiling Plans, Floor Plans, Attic window details, Basic systems layouts for
the Sprinklers and electrical outlets and Minisplit A/C showing locations of the
various improvements for discussion. Included will be a schematic cost estimate.
Discussion in a meeting with various stake holders will review the base proposed
work.
RICHARD ALVORD ARCHITECTS 9 Bircli Street m>. + RoslimLile, Afussecluisetfs 02131 <5.17325 33.16Source page 226
Design Development:
The comments agreed upon in the Schematic Design are to be incorporated into the drawings
for final review and sign-off as agree scope of work. A Design Development cost estimate is to
be included.
Construction Documents:
Documents for the project are listed on the attached estimate for services. The list is an
expectation of the documents required to provide information for the permit, bidding and
construction.
Eiectrical Engineering:
Electrical engineering estimate was performed by the Women's Business Enterprise,
Owl Engineering, Inc, led by Judy O’Brien PE. Written "proposal” attached with scope
of services and fee.
Mechanical and Fire Suppression Engineering:
Mechanical engineering and fire sprinkler design estimate was performed by the
Women's Business Enterprise, C.A. Crowley Engineering, Inc, led by Ray Vincent PE
and Marty Vickey PE. Written "proposal" (estimate) attached with scope of services
and fee.
Structural Engineering:
Structural Engineering is NOT included in the scope of services for this estimate.
Project Manual:
A project manual is included in this estimate for basic scope of services. The manual
will include front end directives for contract requirements as per chapter 149 bidding
laws and the technical specifications sections for the materials to be used in the
project.
Cost Estimating:
Project cost estimating is included at each phase of design for with a final budget at
the end of the Construction Documents for bidding set. It is understood at this time
that the project budget is approximately $1.2M.
Fee:
The A+E fee for this scope of work as further described on the attachments is
estimated at $132,485.00, which is 11 percent of the proposed budget - consistent
with the expectation for this type of project. In the interest of covering any unforeseen
future concerns, Covid 19 considerations and the like, it is recommended to increase
the estimated cost of both the Design Fees and the construction costs by 20%.
Adjust the Design Fee to: $158,982.00
Adjust the Construction Cost to; $1,440,000.00
Please call or email if you have any questions about the scope of services or the
project.
Attachments: AE Fee Spread Sheet;
CA Crowley Engineering Scope of Work
Owl Engineering Scope of WorkSource page 227
Town of Canton Estimate Richard Alvord Architects
Town Hall Improvments Architectural and Engineering Roslindale, MA
Existing Conditions
Measure ARCH DRAFT PM Principal
Lower Level 8 8 0 0
First floor 8 8 0 0
Second floor 8 8 0 0
Attic 2 2 0 0
Draw
Lower Level 1 12 0
First floor 1 16 0
Second floor 1 16 0
Attic 1 8 0
windows 1 8 0
Reflected ceiling Plans
First floor 1 6 0
Second floor 1 6 0
Attic 1 6 0
34 104 0
125 65 100 155
4250 6760 0 0 11010
Schematic Design 8 8 2 4
Design Development 8 8 2 4
16 16 4 8
125 65 100 155
2000 1040 400 1240 4680
Construction Documents
Demolition Plans
First floor 2 12 0
Second floor 2 12 0
Attic 2 12 0
First floor RCP 2 12 0
Second floor RCP 2 12 0
Attic RCP? 2 12 0
Windows 2 24 8
New Work Plans
First floor RCP 2 12 0 0
Second floor RCP 2 12 0 0
Attic RCP? 2 12 0 0
Windows 2 16 0 0
Details 8 16 0 0
Details 8 16 0 0
Work Plan 8 12 0 8
CODE 0 4 0 8
Project Manual
front end 4 2 4 1
Tech Specs 12 sections 8 8 18 1
Special Instructions 4 4 4 8
Coordination
Engineer Elec 4 4 0 4
Engineer Sprinkler 4 4 0 4
Engineer HVAC 4 4 0 4
Sch/DD/100% MTGS 9 4 0 4Source page 228
Town of Canton Estimate Richard Alvord Architects
Town Hall Improvements Architectural and Engineering Roslindale, MA
Cost Estimate
8 12 4
91 238 26 54
125 65 100 155
11375 15470 2600 8370 37815
Construction Administration
Biddings weeks 12 24 0 8
CA Inspections and submittals 24 wk 144 48 0 0
Substantial Completion 2 weeks 12 12 0 0
Closeout 4 weeks 12 12 0 0
180 96 0 8
125 65 100 155
22500 6240 0 1240 29980
SUMMARY
Architectural Existing Condiitions 11010
Schematic Design Design Development 4680
Architectural Construction Documents 37815
Architectural Construction Administration 29980
Mechanical Engineering: HVAC FP 36200
Electrical Engineering 12800
TOTAL 13248S
Project Budget 1200000
Fee% 11.04
Add for unforeseen 20%
Design Fee 158982
Construction 1440000Source page 229
oUi
ENGINEERS
OWL Engineers
105 Abbot Street
Andover, MA 01810
tel:(978)621-2391
October 21,2019
Richard Alvord, AIA
Richard Alvord Architects
9 Birth Street No. 4
Roslindale, MA 02131
RE: Canton Memorial Town Hall
Dear Mr. Alvord,
OWL Engineers is pleased to submit this electrical engineering cost proposal and looks
forward to working with you on the project.
Scope of Services
Construction Document Services will include the preparation of stamped/signed plans and
specifications for the electrical systems for the proposed renovation in accordance with the following:
o Necessary site work and review of existing documentation for the proposed renovation. The
architect will provide all existing available documentation.
0 Electrical design shall include miscellaneous new power and relocation of existing lighting as
required to accommodate new ceilings and connections to new mechanical equipment; life
safety lighting and controls are existing to remain. Tele/ data is existing to remain and has not
been included. Fire alarm including fire protective signaling and automatic fire detection
systems are existing and relocation of these devices on the ceiling will be included.
• The building is equipped with existing electrical distribution and an operational fire alarm
system which are adequate for the renovation. OWL shall connect to existing systems and has
not included design time for new systems.
0 Submissions include 75%, final review and Bid Documents
• All systems design shall conform to Massachusetts State Building Code.
Bidding Services will include answering contractor questions and review of bids.
Construction Administration Services will include shop drawing review; answering of contractor
questions; providing stamped permit drawings; three (3) electrical site visits during construction and
review of closeout materials.
www.owlengineers.com info@owlengineers.com fax:(978)470-1849
Wise adjective \ 'wiz\: having or showing experience, knowledge, and good judgment.Source page 230
Record Drawings: electrical plans shall be provided to the owner at the completion of the project by
the Contractor. OWL Engineers will provide electronic files of the electrical systems design to the
Contractor for the production of Record Drawings.
Assumptions
0 AutoCAD Plans of the proposed buildings will be provided by the Architect.
o Lighting layout shall be provided by the Architect, existing fixtures are to be utilized. The
fixtures are to be installed in a ceiling with insulation and are assumed to be UL Listed for this
application.
o The project consists of approximately 3500sf on the second floor within the existing building.
o OWL Engineers will provide one reproducible contract documents for bidding purposes. OWL
Engineers has not included reproduction costs or time for bid document distribution to
contractors in this proposal.
o Utilities are existing within the buildings and are sufficient in size. New services are not
expected. New panelboard, if required, will be connected to existing distribution and
connected to existing meter.
o The electrical design shall not include telephone/data/ security systems head end devices,
software or cabling.
® Mechanical and Plumbing Design are not included in this proposal
• LEED certification of the building is not included in this proposal.
« Documentation for owner related rebates from utility are not included in this proposal.
Proposed Fee
Project Tasks
75% CD $ 5,400.00
Final Review $ 2,800.00
Bid Documents $ 1,000.00
Construction Administration $ 3,600.00
Project Total $ 12,800.00
www.owlengineers.com info(5),owlengineers.com fax:(978)470-1849
■' L..L_. A -- - . A .
Wise adjective \'wlz\: having or showing experience, knowledge, and good judgment.Source page 231
Invoices for the above stated fee would be submitted monthly, based on a lump sum, percent complete
basis by task. Preapproved reimbursable expenses, such as printing and courier, will be invoiced at
cost.
Thank you for the opportunity to present this proposal. If you have any questions or need additional
information, please feel free to contact our office.
Very truly yours, Accepted:
OWL Engineers Richard Alvord Architects
www.owlengm.eers.com info@owlengm.eers,com fax:(978)470-1849
Basm—' — — - ------------------ — ' -------------- — -------- — ■ - •- - ----------- - - - -------- ’ -—..
Wise adjective \ 'wiz\: having or showing experience, knowledge, and good Judgment.Source page 232
c.a. crowley.
ENGINEERING, INC./
645 County Street . Suite 6
Taunton, MA 02780
Ta. (508)884.5094
FAX. (508) 884.5099
VA’AV.CROWl EVENG.COM
October 23, 2019
Mr. Richard Alvord
Richard Alvord Architects
9 Birch Street, No. 4
Roslindale, MA 02131
REFERENCE: Canton Memorial Town Hall
Dear Mr. Alvord,
We are pleased to submit the following proposal for engineering services for the above referenced
project. The scope of work for the project consists of providing HVAC and Fire Protection engineering
services for the proposed renovations at Canton Memorial Town Hall. The fire protection scope of work
will include a new sprinkler system for the second floor and attic and modifications to the first floor
system. The HVAC scope will include a new air source heat pump system for cooling, throughout the
building and modifications to the existing system to corrected existing problems in the Salah room, Carrol
conference room and adjacent office area. Our scope of service will include the following:
Fire Protect system design work will include new piping and head layout for the second floor and attic
and modifications to the existing first floor system. Hydraulic calculations will be performed to determine
the adequacy of the existing incoming water service. For the purposes of this proposal it is assumed that
the existing service is of adequate size and a new service or fire pump will not be required. This proposal
assumes that the final work drawings and calculations will be submitted by the installing contractor. This
proposal does not include any associated costs for a hydrant flow test.
HVAC system design work will include new cooling only, air source heat pump system for the entire
building along with limited modifications to the existing systems as noted above. It is assumed that the
existing HVAC system will remain as is with the limited modifications noted above.
General
» Visit the site to document the existing conditions.
» Preparation of construction drawings, and technical specifications for the Fire Protection
and HVAC systems as noted above.
• Provide progress submissions at the Design Development, 95% CD and 100% CD phases.
• Provide up to 3 sets of wet stamped drawings.
• Preparation of design affidavits.
» *Review of contractors’ submittals. Assuming one submittal package for all three buildings.
• *Review RFI's submitted by the contractors.
• *Perform two site visits during construction.
• *Preparation of final construction affidavits.
• *Review of close out documents.
C, A. Crowley Engineering, Inc. proposes to provide the Plumbing and HVAC engineering services as
outlined above, for a fixed fee of $36,200,00.Source page 233
c.a. crowley. WVW.CROWLeYENG.COM
ENGINEERING, INC/
The above proposal assumes that electronic background drawings will be provided to us. Please note
that this proposal does not include value engineering, work related LEED certification, cost estimating,
biding services, or substantial redesign after the design development phase. If courier services,
overnight deliveries, or printing of additional sets of documents are required they would be billed as
reimbursable cost with a 10% mark-up.
If you are in agreement with this proposal, please sign and return a copy of this letter to our office.
We appreciate the opportunity to submit this proposal. If you have any questions please feel free to
contact us.
Sincerely,
C. A. CROWLEY ENGINEERING, INC.
Marty Vickey P.E., LEED AP
President
Richard Alvord Architects
Date
F:\PROPOSAL\2Q19 SubmlsefonsXCantcn Memorial Hall- AlvordtProposal Canton Memorial Hb’J AJvord.DocxSource page 234
TOWN OF CANTON
FORM B - FISCAL 2024
WigF CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED. BY:
Public Works Michael Trotta
PROJECT. Z. EQUIPMENT TITLE;
Kubota RTV Utility Vehicle
TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
$21,000
DESCRIPTION:
New or current model year Kubota RTV Utility Vehicle equipped with a heated cab and dump
body.
PURPOSE AND JUSTIFICATION:
The Property Maintenance Division takes care of the 34 acres of conservation ground and
trails at Pequitside Farm. They currently use a small farm tractor. This vehicle is proving
inefficient to meet the needs of emptying trash barrels, picking up loose debris, carrying
repair material, tools. The Kubota RTV has a dump body to hold material and tools and a
heated cap for 4 season use.
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
___ Required for Safety Please rank this request out of your total
___ Required by Law or Mandate requests for this year: (#1 as top priority)
x Improve/Expand Service or Increase Efficiency _______ 3 (#) OF ________ 7 (#)
___ Planned Project or Replacement Expected Useful Life: (Check one)
___ Unplanned Project or Replacement __ 20 or More Yrs ____ 5 to 9 Years
x New Project/Item (not on last year's 5-Yr. Plan) x 10 to 19 Years ___ 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
___ Will Reduce Cost by $____________________ __ Will Produce Addl Revenue by $__________
___ No Impact __ Revenue Neutral (no impact)
___ Will Increase Cost by $___________________ __ Will Decrease Revenue by $_____________
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)Source page 235
Town of Canton, Massachusetts
PUBLIC WORKS DEPARTMENT
Inter-Office Correspondence
To: Select Board, Charles Doody
From: Michael Trotta
Date: November 9, 2022
Re: Public Works CIP
Fy 24 - ATM 2023 CIP Requests
Public Works
1. 6 Wheel Dump 324,000
2. Massapoag Brook Study 260,000
3. Memorial Field Study 252,000
4. Leaf Blower 13,000
5. Flail Boom Mower TBD
6. Truck 14 F-350 Pick-up TBD
7. Pleasant Circle Drain 270,000
8. Paint Exterior of PW Garage TBD
9. PW Garage Floor Clean and Seal TBD
10. Ford Explorer Hybrid 55,000
Property Maintenance
1. Memorial Hall HVAC 111,000
2. F-350 Pick-up TBD
3. Utility Vehicle 21,000
4. FA/CO Water Sewer Garage TBD
5. FA/CO Park & Rec Garage TBD
6. Senior Center HVAC 36,000
7. Memorial Hall Second Floor A&E 300,000
Water
1. Contract 3 Construction 600,000
2. Truck 2 F-150 Pick-up 63,000
3. Contract 4 Design 280,00
4. Neponset WTF GAC 150,000
5. Revere Ct. Water 420,000
6. Compressor 40,000
7. Asphalt Hot Box 56,000
Sewer
1. Phase I l/l Rehab 1,600,000
2. Culloden Generator 40,000Source page 236
short-native-text
PUBLIC WORKS
Source page 237
TOWN OF CANTON
||tg||| FORM B - FISCAL 2024
WgjF CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Public Works Michael Trotta
PROJECT / EQUIPMENT TITLE:
6 Wheel 5 c.y. Dump Truck
TOTAL PROJECT / EQUIPMENT COST (must be at least $5,00<n:
$324,000
DESCRIPTION:
New or current model year Freightliner M2 106 wheel truck equipped with a stainless steel Hi-
Way BiBeau Dump Body and 10 foot Plow.
PURPOSE AND JUSTIFICATION:
This new addition to the Public Works fleet will be used to haul material to and from street
and drain projects. From winter work the truck will be equipped with a 10 foot plow. The
dump body will accept one of the Departments drop in sanders
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
___ Required for Safety Please rank this request out of your total
___ Required by Law or Mandate requests for this year: (#1 as top priority)
x Improve/Expand Service or Increase Efficiency _______ 1_(#) OF _______ 10_(#)
___ Planned Project or Replacement Expected Useful Life: (Check one)
___ Unplanned Project or Replacement __ 20 or More Yrs ____ 5 to 9 Years
___ New Project/Item (not on last year's 5-Yr. Plan) x 10 to 19 Years ___ 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
___ Will Reduce Cost by $_____________________ __ Will Produce Addl Revenue by $__________
x No Impact x Revenue Neutral (no impact)
___ Will Increase Cost by $___________________ __ Will Decrease Revenue by $_____________
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)Source page 238
Prepared For: Prepared by:
Bill Walsh Richard Coutu
Canton Town Of
ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
Canton, MA 2021 411 HARTFORD TURNPIKE
UNITED STATES SHREWSBURY, MA 01545
Phone : 781-821-5025 Phone :508-753-1200
A proposal for
Canton Town Of
Prepared by
ATG TRI STATE TRUCK CENTER, LLC
Richard Coutu
November 02, 2022
Freightliner M2 106
Components shown may not reflect all spec'd options and are not to scale
Application Version 11.7.603 1110212022 12:37 PM
Data Version PRL-27M.018
Canton AWD M2 106 MY2023 FREIGHTLINER Page 1 of 1Source page 239
Greater Boston Police Council
MAPC
Western Star
2021/2022
Cooperative Procurement Specifications
Town of Canton
801 Washington St
Canton, MA 02021
Re: Quotation for 2024 Freightliner M2 106 Single Axle AWD Truck
Item # Item Desription Cost
F106 M2 106 $ 69,668.00
4 Cummins B6.7 325 HP $ 6,952.00
14 Allison 3500 RDS $ 5,164.50
19 10,000 lb front drive axle $ 30,508.50
24 23,000 lb rear axle $ 7,309.50
44 Aluminum front wheels $ 374.00
45 Aluminum rear wheels $ 506.00
48 Power windows/door locks $ 297.00
52 Air Suspension drivers seat $ 396.00
53 Air suspension passenger seat $ 396.00
63 Driver controlled diferential lock $ 1,232.00
73 Bright finish heated mirros $ 286.00
80 Positive load disconnectg switch $ 264.00
93 Positive and negative jumpstart post $ 93.50
MY 24 Escalator $ 1,500.00
CY 23 Surcharge $ 3,750.00
521 Cummins engine warranty 5 years/lOOK miles $ 2,310.00
533 Towing/Roadside 5 years $ 920.00
JC Madigan (see attached) $ 137,550.00
Total $ 269,477.00
Advantage Truck Group Town of Canton
411 Hartford Turnpike
Shrewsbury, MA 01545
Rich CoutuSource page 240
J.C. MADIGAN INC. SALES DEPT. 450 OLD UNION TURNPIKE TEL. (978)847-2900 LANCASTER, MA. FAX (978)847-0068 QUOTE: TOWN OF CANTON HIGHWAY DEPT. TO RICH C.@ TRISTATE FREIGHTLINER FROM JOHN DWYER 1) FT 5 TO 7 CUYD 304 STAINLESS STEEL W/1/4” HARDOX AR- 11 450 STEEL FLOOR MONOSHELL BiBEAU DUMP BODY WITH A MAILHOT TELESCOPIC HOIST MOUNTED ON A SUPPLIED CHASSIS ALL NON-STAINLESS ITEMS PAINTED BLACK WITH THE FOLLOWING ITEMS. A) 30” STAINLESS CABSHIELD W/ FRONT & SIDE RECESSED LED FLASHERS B) AERO AUTO TARPING SYSTEM W/ ALUMINUM ARMS C) BACKUP AND LIFT ALARMS D) BODY SAFETY PROPS / SIDE MOUNTED LADDER W/ HANDLE E) REAR AND FRONT REAR WHEEL MUDFLAPS. F) TRANSMISSION MOUNTED CENTRAL HYDRAULICS W/ HOTSHIFT PTO, W/ CONTROLS AND VALVES FOR DUMP, 4-WAY PLOW, S/S LINES TO REAR, CIRUS EZ-SPREAD CONTROLS, AND POWER BEYOND G) (3) TAILGATE MOUNTED COAL DOORS W/ (2) SAFETY LOCKS H) 3/4” PINTLE PLATE W/ 20T PINTLE, D-RINGS, AND TRAILER PLUG I) (2) REAR POST RECESSED LED FLASHERS & (2) LED ST/TL J) (2) REAR MOUNTED LED WORKLIGHTS K) 24” DEEP ALUMINUM MEDIUM DUTY SIZED I-PACK TOOL BOX L) FRONT GRILL RECESSED LED FLASHERS ON SEPARATE SWITCH 2) 10’ 36” HIGH STEEL MOLDBOARD TRIP EDGE SNOW PLOW EVEREST MODEL RM120TEL36SH W/ HYDRAULIC REVERSE, CURB & WEAR SHOES, CUTTING EDGE, AND GUIDE POLES 3) EVEREST LO-MOUNT PLOW FRAME MODEL (JCM) INSTALLED W/ HOOD MTD. PLOWLIGHTS, CLAMP JAW STYLE QUICK COUPLER ADAPTER, AND DOUBLE ACTING LIFT CYLINDER 4) 10’ 4.44cuyd 304 STAINLESS STEEL HI-WAY MODEL E-1010 TWO MOTOR HYDRAULIC SPREADER INSTALLED IN THE DUMP BODY ABOVE WITH THE FOLLOWING ITEMS A) FRONT & REAR S/S SPILLSHIELDS B) REAR MOUNTED S/S LIGHTBAR W/ LED FLASHERS & ST/TL C) DUAL 50gal POLY SADDLE TANKS W/ ELECTRIC PRE-WET
Source page 241
D) (2) CHUTE MOUNTED LED WORKLIGHTS
(ITEMS 108”CA / AUX SWITCHES/ 3000 SERIES ALLISON WZ PTO PROV. I PLOW LIGHT PREP/
FRONT FRAME EXT.(IF POSSIBLE))
PRICE $137,550.00
APPROVAL ____________ DATE
PO# 02/14/2022